Monitoring Location and Date Sample Clauses

Monitoring Location and Date. 2.3.1 The operational airborne noise monitoring for full operation of TML was conducted at Wing Xxxx Building (HUH-1-3) on 9 November 2021. 2.3.2 The corresponding monitoring location during the reporting period was shown in Figure C11033/C/SCL/ACM/M52/072. 2.3.3 Summary of the monitoring location and monitoring date during the reporting period are shown in Table 2.2. Monitoring ID NSR ID Description Type Measurement Floor (1) ASR Monitoring Date NMS-OA-2 HUH-1-3 Wing Xxxx Building Residential 1/F C(2) 9 November 2021 Remarks: (1) The measurement was conducted at the worst affected floor as identified in the SCL(HHS) EIA Report. (2) Based on latest available information, Annual Traffic Census 2020 (ATC 2020), Chatham Road North located to the immediate north-west of HUH-1-3, is considered as an Influencing Factor (IF) with the AADT of this road section more than 30,000 (i.e. 105,040 as recorded in ATC 2020). As HUH-1-3 is located inUrban Area” and the noise from IF was readily noticeable at the monitoring location during the monitoring, the ASR “C” was assigned to HUH-1-3.
AutoNDA by SimpleDocs
Monitoring Location and Date. 2.3.1 As discussed in Section 1.1.8, the 1st phase opening of TML, covering three new stations at Hin Keng, Diamond Hill and Kai Tak commenced on 14 February 2020. The 2nd operational airborne noise monitoring at Tower 1, Festival City Phase II (TAW-P1-2) was conducted on 19 March 2020, while the noise monitoring at Wing Xxxx Building (HUH-1-3) will be conducted in a later stage after full opening of TML. 2.3.2 The corresponding monitoring location during the reporting period was shown in Figure C11033/C/SCL/ACM/M52/071. 2.3.3 Summary of the monitoring location and monitoring date during the reporting period are shown in Table 2.2. Monitoring ID NSR ID Description Type Measurement Floor (1) ASR Monitoring Date NMS-OA-1 TAW-P1- 2 Tower 1, Festival City Phase II Residential Refuge Floor (19/F) C(2) 19 March 2020 Remarks: (1) In accordance with Noise Performance Test Report, the predicted noise level (i.e. LAeq, 30min 45dB(A) during night-time period) at the measurement floor (19/F) of TAW-P1-2 is same as those predicted at the worst affected floor (10/F). It is therefore considered that the noise level at the proposed measurement floor would be able to represent the worst affected floor. (2) Based on latest available information, Annual Traffic Census 2018 (ATC 2018), Tsing Sha Highway located to the immediate south-west of TAW-P1-2, as represented by the annual average daily traffic (AADT) of Eagle’s Nest Tunnel, is considered as an Influencing Factor (IF) with the AADT of this road section more than 30,000 (i.e. 60,680 as recorded in ATC 2018). As TAW-P1-2 is located inUrban Area” and the noise from IF was readily noticeable at the monitoring location during the monitoring, the ASR “C” was assigned to TAW-P1-2.

Related to Monitoring Location and Date

  • Location and Facilities The Executive will be furnished with the working facilities and staff customary for executive officers with the title and duties set forth in Section 1 and as are necessary for him to perform his duties. The location of such facilities and staff shall be at the principal administrative offices of the Company and the Bank, or at such other site or sites customary for such offices.

  • Closing Location The Closing shall be held at the location designated by the Corporation or, if no such designation is made, at the office of Seller's Attorney.

  • LOCATION AND DESCRIPTION OF THE PROPERTY The subject property is a single-storey terraced house bearing the postal address of Xx. 00, Xxxxxx 00/XX0, Xxxxxx Xxxxx Xxxxxxx, 00000 Xxxxxxx Xxxxx, Xxxxxx. The subject property will be sold on an “as is where is basis” and subject to a reserve price of RM310,000.00 (RINGGIT MALAYSIA THREE HUNDRED TEN THOUSAND ONLY) and subject to the Conditions of Sale and by way of an Assignment from the above Assignee/Bank subject to the consent being obtained by the Purchaser from the Developer and other relevant authorities if any, including all terms, conditions, stipulations and covenants which were and may be imposed by the Developer and the relevant authorities. Any arrears of quit rent, assessments and service or maintenance charges which may be lawfully due to any relevant authority or the Developer up to the date of auction sale of the property shall be paid out of the purchase money upon receipt of full purchase price. All other fees, costs and charges relating to the transfer and assignment of the property shall be borne by the successful Purchaser. Online bidders are further subject to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx. All intending bidders are required to deposit 10% of the fixed reserve price for the said property by Bank Draft or Cashier’s Order in favour of UOBM for KRISHNAMAL A/P MURLIGIAH & XXXXXXXXXXX A/L XXXXXXX or remit the same through online banking transfer, one (1) working day before auction date. The balance of the purchase money shall be paid by the Purchaser within one hundred and twenty (120) days from the date of auction sale to UNITED OVERSEAS BANK (MALAYSIA) BHD via Real Time Electronics Transfer of Funds and Securities (XXXXXX). For online bidders please refer to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx on the manner of payment of the deposit. FOR FURTHER PARTICULARS, please contact M/S HOE & MOIRA, of Xxxxx 000X (Xxxxx), 0xx Xxxxx, Xxxxx Xxxxxx Xxxxxx, Xxxxxxxxxx Xxxx, 00000 Xxxxxx, Xxxxxxxx. (Ref:H&M/MT/Z4P/CB23/16) Tel.: 00-000 0000, Fax: 00-000 0000) the Assignee herein or the undermentioned Auctioneer. Suite C-20-3A, Level 20, Block C, Megan Avenue II, / XXXXX XXXXX BIN XXXXXX 00, Xxxxx Xxx Xxxx Xxxx, 50450 Kuala Lumpur (Licensed Auctioneers) Tel No.: 00-0000 0000 Fax No.: 00-0000 0000 Our Ref: LIAN/UOB1035HM Website: xxx.xxxxxxxxxxxxxxxx.xxx E-mail: xxxx@xxxxxxxxxxxxxxxx.xxx [berkuatkuasa dari 1.11.2022, perniagaan perbankan pengguna (consumer banking business) CITIBANK BERHAD (No. Syarikat: 199401011410 (297089-M) telah dipindahmilik kepada xxx diletakhakkan kepada UOB di bawah Perintah Letakhak bertarikh 12.10.2022 melalui Mahkamah Tinggi Kuala Lumpur Saman Pemula No. WA-24NCC-903-09/2022] Dalam menjalankan xxx xxx kuasa xxxx telah diberikan kepada Pihak Pemegang Serahhak/Bank dibawah Perjanjian Kemudahan, Penyerahanhak xxx Surat Kuasa Wakil kesemuanya Bertarikh 09hb Julai, 2001 diantara Pihak Penyerahhak, Pihak Pelanggan xxx Pihak Pemegang Serahhak/Bank yang diperbuat dalam perkara diatas, adalah dengan ini diisytiharkan bahawa Pihak Pemegang Serahhak/Bank tersebut dengan bantuan Pelelong yang tersebut dibawah.

  • Place of Business; Location of Collateral The address set forth in the heading to this Agreement is Borrower's chief executive office. In addition, Borrower has places of business and Collateral is located only at the locations set forth on the Schedule. Borrower will give Silicon at least 30 days prior written notice before opening any additional place of business, changing its chief executive office, or moving any of the Collateral to a location other than Borrower's Address or one of the locations set forth on the Schedule.

  • Felling of trees The Authority shall assist the Contractor in obtaining the Applicable Permits for felling of trees in non-forest area to be identified by the Authority for this purpose if, and only if, such trees cause a Material Adverse Effect on the construction or maintenance of the Project Highway. The Contractor shall fell these trees as per the Permits obtained. The cost of such felling shall be borne by the Authority and in the event of any delay in felling thereof for reasons beyond the control of the Contractor; it shall be excused for failure to perform any of its obligations hereunder if such failure is a direct consequence of delay in the felling of trees. The Parties hereto agree that the felled trees shall be deemed to be owned by the Authority and shall be disposed in such manner and subject to such conditions as the Authority may in its sole discretion deem appropriate. For the avoidance of doubt, the Parties agree that if any felling of trees hereunder is in a forest area, the Applicable Permit thereof shall be procured by the Authority within the time specified in the Agreement.

  • LOCATION AND DESCRIPTION The subject property is situated about 5 kilometres north-west of PJ new town. The subject property compromises of a serviced apartment unit identified Developer’s Parcel No. 28-20, Type C1-B, Storey No. 28, The Arcuz @ Kelana Jaya, Phase 3 bearing postal address of Xxxx Xx. 00-00, The Arcuz @ Kelana Jaya, Xxxxx XXX 0X/0X, 00000 Xxxxxxxx Xxxx, Xxxxxxxx. The property will be sold on an “as is where is” basis and subject to a reserve price of RM620,000.00 (RINGGIT MALAYSIA SIX HUNDRED TWENTY THOUSAND ONLY) only and subject to the Conditions of Sale and by way of an Assignment from the above Assignee subject to consent being obtained by the successful bidder ('the Purchaser") from the Developer and other relevant authorities, if any, is required, including all terms, conditions, stipulations and covenants which were and may be imposed by the Developer and the relevant authority. All expenses incurred in obtaining the said consent shall be borne by the Purchaser. Any arrears of quit rent, assessment, service/maintenance charges and sinking fund (including the late penalty interest) which may be lawfully due to any relevant authority or the Developer or Proprietor or relevant third parties entitled thereto up to the date of successful sale of the subject property shall be borne out of the purchase price. The Purchaser shall bear and pay all fees and expenses including but not limited to all legal fees, stamp duty and registration fees in connection with, incidental to or pursuant to the Assignment and all other documents necessary for effecting the transfer or assigning the beneficial ownership in the property to the Purchaser and shall also bear all risks in relation to the purchase of the Property. The sale of the subject property may be subjected to any prevailing tax imposed by the Government of Malaysia. In such event where prevailing tax is payable, it shall be paid by the Purchaser in addition to the purchase price payable by the Purchaser. All intending bidders are required to deposit 10% of the fixed reserve price by bank draft or cashier’s order crossed “A/C Payee only” in favour of OCBC BANK (MALAYSIA) BERHAD prior to the sale with undermentioned Auctioneer and the balance purchase price to be settled within one hundred and twenty (120) days from the date of auction sale to the Assignee. To get a copy of the Conditions of Sale and any further particulars, please contact Messrs Ho, Loke & Koh Solicitors for the Assignee herein whose address is at X-0-0, Xxxxx Xxxxxx 0, 000, Xxxxx Xxx Xxxxx, 00000 Xxxxx Xxxxxx, Xxxxxxxx (Ref.: PLEASE ADVICE, Tel.: 00-0000 0000, Fax: 00- 0000 0000) or the undermentioned Auctioneer at the address below. Suite C-20-3A, Level 20, Block C, Megan Avenue II, / XXXXX XXXXX BIN XXXXXX 00, Xxxxx Xxx Xxxx Xxxx, 50450 Kuala Lumpur (Licensed Auctioneers) Tel No.: 00-0000 0000 Fax No.: 00-0000 0000 Our Ref:UMI/OCBC1396/HLK Website: xxx.xxxxxxxxxxxxxxxx.xxx E-mail: xxxx@xxxxxxxxxxxxxxxx.xxx

  • Installation and Conversion State Street and the Fund shall be responsible for the technical installation and conversion (“Installation and Conversion”) of the Designated Configuration. The Fund shall have the following responsibilities in connection with Installation and Conversion of the System: (i) The Fund shall be solely responsible for the timely acquisition and maintenance of the hardware and software that attach to the Designated Configuration in order to use the Data Access Services at the Designated Locations, and (ii) State Street and the Fund each agree that they will assign qualified personnel to actively participate during the Installation and Conversion phase of the System implementation to enable both parties to perform their respective obligations under this Addendum.

  • Closing of the Company’s Transfer Books At the Effective Time: (a) all shares of Company Common Stock outstanding immediately prior to the Effective Time shall automatically be canceled and retired and shall cease to exist, and all holders of certificates representing shares of Company Common Stock that were outstanding immediately prior to the Effective Time shall cease to have any rights as stockholders of the Company; and (b) the stock transfer books of the Company shall be closed with respect to all shares of Company Common Stock outstanding immediately prior to the Effective Time. No further transfer of any such shares of Company Common Stock shall be made on such stock transfer books after the Effective Time. If, after the Effective Time, a valid certificate previously representing any shares of Company Common Stock (a "Company Stock Certificate") is presented to the Exchange Agent (as defined in Section 1.7) or to the Surviving Corporation or Parent, such Company Stock Certificate shall be canceled and shall be exchanged as provided in Section 1.7.

  • Installation and Use You may install and use the Software only for the number of licenses acquired by you. In order to exercise your rights to the Software under this Agreement, you must activate your copy of the Software in the manner described during the launch sequence.

  • Time and Place of the Closing If the conditions referred to in Article 9 and Article 10 have been satisfied or waived in writing, and subject to any extensions provided for herein, the consummation of the transactions contemplated by this Agreement (the “Closing”) shall take place at the offices of Akin, Gump, Strauss, Xxxxx & Xxxx, L.L.P., whose address is 0000 Xxxxxxxxx, 00xx Xxxxx, Xxxxxxx, XX 00000, at 10:00 a.m. Houston, Texas time on October 1, 2013, or such other date that is mutually agreed by the Parties or to which the Closing is postponed pursuant to this Agreement (the “Closing Date”).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!