Msa Mechanical Sample Clauses

Msa Mechanical 
AutoNDA by SimpleDocs

Related to Msa Mechanical

  • Mechanical Breakdowns 15.1 Any mechanical problems associated with the Vehicle must be reported to Apollo as soon as possible in order to give Apollo the opportunity to rectify the problem during the rental period. Equipment failure must also be reported to Apollo.

  • Mechanical License If any selection or musical composition, or any portion thereof, recorded in the New Song hereunder is written or composed by Producer, in whole or in part, alone or in collaboration with others, or is owned or controlled, in whole or in part, directly or indirectly, by Producer or any person, firm, or corporation in which Producer has a direct or indirect interest, then such selection and/or musical composition shall be hereinafter referred to as a “Controlled Composition”. Producer hereby agrees to issue or cause to be issued, as applicable, to Licensee, mechanical licenses in respect of each Controlled Composition, which are embodied on the New Song. For that license, on the United States and Canada sales, Licensee will pay mechanical royalties at one hundred percent (100%) of the minimum statutory rate, subject to no cap of that rate for albums and/or EPs. For license outside the United States and Canada, the mechanical royalty rate will be the rate prevailing on an industry-wide basis in the country concerned on the date that this agreement has been entered into.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Available Relief for a Force Majeure Event 11.7.1 Subject to this Article 11:

Time is Money Join Law Insider Premium to draft better contracts faster.