Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)
System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
Voice Grade Either an analog signal of 300 to 3000 Hz or a digital signal of 56/64 kilobits per second. When referring to digital Voice Grade service (a 56-64 kbps channel), the terms "DS0" or "sub-DS1" may also be used.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.
System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
Scheduled Outages (1) No later than five (5) Business Days prior to the dates required by the ISO for delivery of schedules for planned outages (which such ISO required delivery dates are currently January 15th, April 15th, July 15th and October 15th of each calendar year during the Facility Term), and at least sixty (60) days prior to the later of: (A) Initial Synchronization, or (B) SCE becoming Seller’s Scheduling Coordinator, Seller shall submit to SCE its schedule of proposed planned outages (“Outage Schedule”) for the subsequent twenty four-month period using the Web Client. If Seller fails to submit an Outage Schedule for any period as required under this Section 3.19, then Seller shall not be permitted to schedule or have any planned outages with respect to such period. The foregoing shall not prevent Seller from modifying its Outage Schedule in cooperation with SCE and the ISO. SCE shall provide Notice to Seller in the event that the ISO changes the ISO required delivery dates for schedules for planned outages. In addition, no later than thirty (30) days prior to October 15 of each year, Seller shall submit to SCE its estimate of its planned outages for the following year. (2) Seller shall provide the following information for each proposed planned outage: (A) Start date and time; (B) End date and time; and (C) Capacity expected to be online, in MW, during the planned outage. (3) Within twenty (20) Business Days after SCE’s receipt of an Outage Schedule, SCE shall notify Seller in writing of any reasonable request for changes to the Outage Schedule, and Seller shall, consistent with Prudent Electrical Practices and as permitted by the ISO, accommodate SCE’s requests regarding the timing of any planned outage. (4) Seller shall cooperate with SCE to arrange and coordinate all Outage Schedules with the ISO. (5) In the event a condition occurs at the Generating Facility which causes Seller to revise its planned outages, Seller shall provide Notice to SCE, using the Web Client, of such change (including an estimate of the length of such planned outage) as soon as practicable after the condition causing the change becomes known to Seller. (6) Seller shall promptly prepare and provide to SCE upon request, using the Web Client, all reports of actual or forecasted outages that SCE may reasonably require for the purpose of enabling SCE to comply with Section 761.3 of the California Public Utilities Code or any Applicable Law mandating the reporting by investor owned utilities of expected or experienced outages by electric energy generating facilities under contract to supply electric energy.
Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to ICG.
Client Categorisation 4.1. The client understands and accepts that each category of Clients has its individual level of regulative protection acknowledging that Retail Clients have the highest level of protection whereas Professional Clients and Eligible Counterparties are considered to be more experienced, informed, skilled and able to estimate their risk, therefore are provided with a lower level of protection. 4.2. The Company will treat the Client as a Retail Client, Professional Client or Eligible Counterparty, depending on how the Client completes the Application Form and according to the method of categorisation as this method is explained under the title “Client Categorisation” (Appendix II), and by accepting this Agreement the Client accepts application of such method. 4.3. The Client accepts that when categorising the Client and dealing with him, the Company will rely on the accuracy, completeness and correctness of the information provided by the Client in his Application Form and the Client has the responsibility to immediately notify the Company in writing if such information changes. 4.4. The Company has the right to review the Client’s Categorisation and change his Categorisation if this is deemed necessary (subject to Applicable Laws).
Industry Ratings The City will only accept coverage from an insurance carrier who offers proof that it: a. Is authorized to do business in the State of Kansas; b. Carries a Best's policyholder rating of A- or better; and c. Carries at least a Class VIII financial rating; or d. Is a company mutually agreed upon by the City and Consulting Engineer/Architect.
Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.