New Water Sample Clauses

New Water connections to your property As long as your property is Serviced Land and has not been Disconnected by us, we will arrange and provide for a connection(s) to your property within 10 Business Days (or such later date as we both may agree) if your property meets the requirements of connection specified by in our Connection Policy.
AutoNDA by SimpleDocs

Related to New Water

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • PROPANE GAS SYSTEM SERVICE AREA If the Property is located in a propane gas system service area owned by a distribution system retailer, Seller must give Buyer written notice as required by §141.010, Texas Utilities Code. An addendum containing the notice approved by TREC or required by the parties should be used.

  • Elevation Elevation is defined as restoring an employee to the higher classification, with permanent status, which was held prior to being granted a demotion or to a class that is between the current class and the class from which the employee was demoted. Upon elevation, an employee’s salary will be determined in the same manner that is provided for promotion in Section 43.5, above.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Slope Portions of an accessible route with running slopes steeper than 1:20 are ramps and shall comply with 4.8. The cross slope of an accessible route shall not be steeper than 1:48  See Figure 1 for required compliance  Near Unit #612: o grind, relevel or repour concrete curb ramp to 8.33% grade or less on slope

  • Porcupine Site Highway 11

  • Overbuilds Sprint will not provide non-discriminatory access to FTTH Loop or FTTC Loop on an unbundled basis when Sprint has deployed a FTTH Loop or FTTC Loop parallel to, or in replacement of, an existing loop facility, except that:

  • Fertilizer Purchaser shall evenly spread the fertilizer listed below on all exposed soil inside the grubbing limits at a rate of 200 pounds per acre of exposed soil. Fertilizer must meet the following specifications: Chemical Component % by Weight Sulphur 3 Inerts 49 SECTION 9 – POST-HAUL ROAD WORK 9-3 CULVERT MATERIAL REMOVED FROM STATE LAND Culverts removed from roads become the property of the Purchaser and must be removed from state land.

  • Cloud storage DSHS Confidential Information requires protections equal to or greater than those specified elsewhere within this exhibit. Cloud storage of Data is problematic as neither DSHS nor the Contractor has control of the environment in which the Data is stored. For this reason:

Time is Money Join Law Insider Premium to draft better contracts faster.