No Requirement to Supply Electricity Sample Clauses

No Requirement to Supply Electricity. If at any time the Generator reasonably determines that the Existing Electrical System is unsafe, Generator shall not have the obligation to supply Electricity to Customer. Generator shall have no responsibility, obligation, or requirement to inspect or approve the Existing Electrical System after the Commercial Operation Date.
AutoNDA by SimpleDocs

Related to No Requirement to Supply Electricity

  • DELIVERY TERMS AND TRANSPORTATION CHARGES Deliverables shall be shipped F.O.B. point of delivery unless otherwise specified in the Supplemental Terms and Conditions. Unless otherwise stated in the Offer, the Contractor’s price shall be deemed to include all delivery and transportation charges. The City shall have the right to designate what method of transportation shall be used to ship the deliverables. The place of delivery shall be that set forth the purchase order.

  • Packaging Materials and Containers for Retail Sale Packaging materials and containers in which a good is packaged for retail sale shall, if classified with the good, be disregarded in determining whether all the non-originating materials used in the production of the good undergo the applicable change in tariff classification set out in Annex 4, and, if the good is subject to a regional value-content requirement, the value of such packaging materials and containers shall be taken into account as originating or non-originating materials, as the case may be, in calculating the regional value content of the good.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Specific Provisions for Access Rights to Software For the avoidance of doubt, the general provisions for Access Rights provided for in this Section 9 are applicable also to Software. Parties’ Access Rights to Software do not include any right to receive source code or object code ported to a certain hardware platform or any right to receive respective Software documentation in any particular form or detail, but only as available from the Party granting the Access Rights.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Transportation Charges The cost of transporting Employees and Material necessary for the Mining Operations.

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • INFORMATION OF LOCKHEED XXXXXX (a) Information provided by LOCKHEED XXXXXX to SELLER remains the property of LOCKHEED XXXXXX. XXXXXX agrees to comply with the terms of any proprietary information agreement with LOCKHEED XXXXXX and to comply with all proprietary information markings and restrictive legends applied by LOCKHEED XXXXXX to anything provided hereunder to SELLER. XXXXXX agrees not to use any LOCKHEED XXXXXX provided information for any purpose except to perform this Contract and agrees not to disclose such information to third parties without the prior written consent of LOCKHEED XXXXXX. SELLER shall maintain data protection processes and systems sufficient to adequately protect LOCKHEED XXXXXX provided information and comply with any law or regulation applicable to such information.

Time is Money Join Law Insider Premium to draft better contracts faster.