NON- MRS ITEMS. Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 2060 Rft P. Rft 2 Replacement connections of leakage house 34 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling of P.C.C 1:2:4 360.00 Cft P.% Cft 11209.45 40354 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 720.00 Cft P.%o Cft 7647.00 5506 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 240.00 Rft P. Rft 196.10 47064 4 Making connection for new watersupply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 Nos. Each 2976.60 5953 6 Providing / fixing of Cast iron specials of BSS Class B complete. 63.00 Kgs P. Kg 123.05 7752 7 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 576.00 Cft P.%o Cft 2547.60 1467 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 504.00 Cft P.%o Cft 10244.40 5163 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 90.000 Cft P.% Cft 27697.40 24928 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 118.800 Cft P.% Cft 37004.60 43961 MRS Item Total (A) Rs:- 198899 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
Appears in 1 contract
Samples: Percentage / Item Rate Tender and Contract for Works
NON- MRS ITEMS. Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 2060 620 Rft P. Rft 2 Replacement connections of leakage house 34 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling of P.C.C 1:2:4 360.00 483.75 Cft P.% Cft 11209.45 40354 54226 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 720.00 1290.00 Cft P.%o Cft 7647.00 5506 9865 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 240.00 430.00 Rft P. Rft 196.10 47064 84323 4 Making connection for new watersupply water supply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 4.00 Nos. Each 2976.60 11906 5 P/F of sluice valve of BSS Class B complete in all respect. 3" i/d 2.00 Nos. Each 2976.60 5953 16750.30 33501 6 Providing / fixing of Cast iron specials of BSS Class B complete. 63.00 160.00 Kgs P. Kg 123.05 7752 19688 7 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 576.00 1032.00 Cft P.%o Cft 2547.60 1467 2629 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 504.00 741.75 Cft P.%o Cft 10244.40 5163 7599 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 90.000 161.250 Cft P.% Cft 27697.40 24928 44662 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 118.800 212.850 Cft P.% Cft 37004.60 43961 78764 MRS Item Total (A) Rs:- 198899 347163 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
Appears in 1 contract
Samples: Percentage / Item Rate Tender and Contract for Works
NON- MRS ITEMS. Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 2060 390 Rft P. Rft 2 Providing fixing of non return valve 3" i/d 3 Nos. Each 3 Replacement connections of leakage house 34 connections 12 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. D/d 5% old materials Net Total Rs. 1 Dismantling of P.C.C 1:2:4 360.00 517.50 Cft P.% Cft 11209.45 40354 58009 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 720.00 1035.00 Cft P.%o Cft 7647.00 5506 7915 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 240.00 the high density 345.00 Rft P. Rft 196.10 47064 67655 4 Making connection for new watersupply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 4.00 Nos. Each 2976.60 5953 2976.00 11904 6 Providing / fixing of Cast iron specials of BSS Class B complete. 63.00 58.00 Kgs P. Kg 123.05 7752 7 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 576.00 Cft P.%o Cft 2547.60 1467 7137 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 504.00 724.50 Cft P.%o Cft 10244.40 5163 7422 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 90.000 129.375 Cft P.% Cft 27697.40 24928 35834 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 118.800 170.775 Cft P.% Cft 37004.60 43961 63195 MRS Item Total (A) Rs:- 198899 294679 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
Appears in 1 contract
Samples: Percentage / Item Rate Tender and Contract for Works
NON- MRS ITEMS. Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 2060 480 Rft P. Rft 2 Replacement connections of leakage house 34 18 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling of P.C.C 1:2:4 360.00 420.50 Cft P.% Cft 11209.45 40354 12312.95 51776 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 720.00 1682.00 Cft P.%o Cft 7647.00 5506 8403.10 14134 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 240.00 550.00 Rft P. Rft 196.10 47064 4 Making connection for new watersupply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 Nos. Each 2976.60 5953 6 197.35 108543 5 Providing / fixing of Cast iron specials of BSS Class B complete. 63.00 89.50 Kgs P. Kg 123.05 7752 130.15 11648 6 P/F of sluice valve of BSS Class B complete in all respect. 3" i/d 1.00 Nos. Each 18272.00 18272 7 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 576.00 1345.60 Cft P.%o Cft 2547.60 1467 2798.40 3766 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 504.00 756.90 Cft P.%o Cft 10244.40 5163 10128.20 7666 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 90.000 210.25 Cft P.% Cft 27697.40 24928 27346.20 57495 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 118.800 210.25 Cft P.% Cft 37004.60 43961 36557.40 76862 MRS Item Total (A) Rs:- 198899 356716 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
Appears in 1 contract
Samples: Percentage / Item Rate Tender and Contract for Works
NON- MRS ITEMS. Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 2060 690 Rft P. Rft 2 Replacement connections of leakage house 34 connections 23 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling of P.C.C 1:2:4 360.00 450.00 Cft P.% Cft 11209.45 40354 12312.95 55408 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 720.00 675.00 Cft P.%o Cft 7647.00 5506 8403.10 5672 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 240.00 300.00 Rft P. Rft 196.10 47064 197.35 59205 4 Making connection for new watersupply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 Nos. Each 2976.60 5953 6 3276.90 6554 5 Providing / fixing of Cast iron specials of BSS Class B complete. 63.00 40.00 Kgs P. Kg 123.05 7752 7 130.15 5206 6 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 576.00 540.00 Cft P.%o Cft 2547.60 1467 8 2798.40 1511 7 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 504.00 585.00 Cft P.%o Cft 10244.40 5163 9 10128.20 5925 8 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 90.000 112.50 Cft P.% Cft 27697.40 24928 10 27346.20 30764 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 118.800 148.50 Cft P.% Cft 37004.60 43961 36557.40 54288 MRS Item Total (A) Rs:- 198899 224534 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
Appears in 1 contract
Samples: Percentage / Item Rate Tender and Contract for Works
NON- MRS ITEMS. Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 2060 600 Rft P. Rft 2 Replacement connections of leakage house 34 23 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling of P.C.C 1:2:4 360.00 1545.00 Cft P.% Cft 11209.45 40354 12312.95 190235 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 720.00 1125.00 Cft P.%o Cft 7647.00 5506 8403.10 9453 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 240.00 250.00 Rft P. Rft 196.10 47064 197.35 49338 4" i/d 780.00 Rft P. Rft 299.75 233805 4 Making connection for new watersupply lines with the running main, including excavation P/F of trench and refilling complete, but excluding cost sluice valve of pipe and specials, etcBSS Class B complete in all respect. Upto 64" dia 2.00 i/d 3.00 Nos. Each 2976.60 5953 6 20006.55 60020 5 Providing / fixing of Cast iron specials of BSS Class B complete. 63.00 293.50 Kgs P. Kg 123.05 7752 7 130.15 38199 6 Rehandling of earthwork lead upto a single throw of xxxxx (80% of excavation) 576.00 900.00 Cft P.%o Cft 2547.60 1467 8 2798.26 2518 7 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 504.00 1770.00 Cft P.%o Cft 10244.40 5163 9 10128.32 17927 8 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 90.000 386.25 Cft P.% Cft 27697.40 24928 10 27346.24 105625 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 118.800 509.85 Cft P.% Cft 37004.60 43961 36558.82 186395 MRS Item Total (A) Rs:- 198899 893515 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
Appears in 1 contract
Samples: Percentage / Item Rate Tender and Contract for Works
NON- MRS ITEMS. Concrete / asphalt road for the laying of water supply pipeline with concrete / asphalt cutter upto 1' depth i/c the hire charges of cutter machine, xxxxxx bit blade, POL Charges i/c labour charges complete in all respect. 2060 560.00 Rft P. Rft 2 Replacement connections of leakage house 34 3 P/F compression fitting for HDPE Pipes. i. Tee Bend size 90mmx90mm 1.00 Nos. Each P/F compression fitting for HDPE Pipes. ii. Equal Bend size 90mmx90mm 1.00 Nos. Each 4 P/F PE 80 Butt fusion fitting for HDPE Pipes. i. Stub End (short collar) 90 mm (PN-8) 4.00 Nos. Each Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling of P.C.C 1:2:4 360.00 270.00 Cft P.% Cft 11209.45 40354 12312.95 33245 2 Excavation of trenches in all kind of soil, except cutting rock for water supply pipeline upto 5ft. Depth from ground level including trimming dressing sides, leveling the beds of trenches to correct grade and cutting pits for joints etc. complete in all respect. 720.00 1350.00 Cft P.%o Cft 7647.00 5506 8403.10 11344 3 P/L, Testing and disinfecting the high density polyethene pipeline (PN-8), 3" i/d 240.00 360.00 Rft P. Rft 196.10 47064 197.35 71046 4 Making connection for new watersupply lines with the running main, including excavation of trench and refilling complete, but excluding cost of pipe and specials, etc. Upto 6" dia 2.00 Nos. Each 2976.60 5953 3276.90 6554 5 P/F of sluice valve of BSS Class B complete in all respect. 3" i/d 1.00 Nos. Each 18272.30 18272 6 Providing / fixing of Cast iron specials of BSS Class B complete. 63.00 20.00 Kgs P. Kg 123.05 7752 130.15 2603 7 Rehandling and ramming of earthwork lead upto a single throw of xxxxx (80% of excavation) 576.00 1080.00 Cft P.%o Cft 2547.60 1467 2798.40 3022 8 Transportation of earth all types when the total distance including the lead covered in the item of work is more than 1000 feet lead upto 5 miles 504.00 540.00 Cft P.%o Cft 10244.40 5163 5532 9 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:4:8) 90.000 135.00 Cft P.% Cft 27697.40 24928 27346.20 36917 10 Cement concrete plain i/c placing, compacting, finishing and curing complete (1:2:4) 118.800 135.00 Cft P.% Cft 37004.60 43961 36557.40 49352 MRS Item Total (A) Rs:- 198899 237888 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-
Appears in 1 contract
Samples: Percentage / Item Rate Tender and Contract for Works