Common use of NON- MRS ITEMS Clause in Contracts

NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 282.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling Cement Concrete 1:2:4 Plain 317.32 Cft Per % Cft 12312.95 39071 2 Dismantling Cement Concrete 1:4:8 Plain 211.55 Cft Per % Cft 6156.50 13024 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-up to 0 - 7' depth 2221.24 Cft Per %0 Cft 12926.85 28714 4 Supply and filling of sand under floor and around the pipe i/c leveling, manual compaction, complete in all respct. 93.84 Cft Per % Cft 3919.20 3678 5 Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.12" i/d 136.50 Rft Per Rft 756.60 103276 6 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 211.55 Cft Per % Cft 27346.20 57851 7 Pacca brick work other than building in cement sand mortar (1:4) complete. 162.87 Cft Per % Cft 36297.80 59118 8 Cement plaster (1:4) 1/2" thick 138.81 Sft P. % Sft 3518.30 4884 9 Cement concrete plain including placing, compacting, finishing and curing complete: (1:2:4) 224.47 Cft Per % Cft 36557.40 82060 10 Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. 3.00 Nos. Each 11224.95 33675 11 Rehandling of earth work lead upto a single throw of XXXXX, Phorah or xxxxxx. 1937.74 Cft Per %0 Cft 2798.40 5423 12 Transportation of earth all types when the total distance, including the lead covered in the item of work, Upto 15 Miles. 812.37 Cft Per %0 Cft 16257.20 13207 MRS Xxxx Total (A) Rs:- 443980 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: Percentage / Item Rate Tender and Contract for Works

AutoNDA by SimpleDocs

NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 282.00 260.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling of P.C.C 1:2:4 157.76 Cft P % Cft 14636.15 23090 2 Pacca brick work other than building in cement sand mortar (1:4) 362.45 Cft P % Cft 38294.65 138799 3 Extra pacca brick work in steining of xxxxx or any other circular masonary 362.45 Cft P % Cft 3457.20 12531 4 Cement sand plaster in cement sand mortar (1:4), 1/2" thick complete. 483.26 Sft P % Sft 4019.50 19425 6 Bailing out water (by pump) 30600.00 Cft P % Cft 1054.45 32266 7 P/F 6" thick R.C.C manhole cover 22"i/d with angle iron Frame complete as per Standerd drawing and design. 17.00 Nos. Each 12795.65 217526 MRS Xxxx Total (A) Rs:- 472078 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling Cement Concrete 1:2:4 Plain 317.32 621.47 Cft Per % Cft 12312.95 39071 14636.15 90959 2 Dismantling Cement Concrete 1:4:8 Plain 211.55 414.31 Cft Per % Cft 6156.50 13024 7318.10 30320 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-up to 0 - 7' depth 2221.24 1242.94 Cft Per %0 Cft 12926.85 28714 15934.55 19806 4 Supply Providing and filling of laying sand under floor and around the pipe i/c sewer pipe, including leveling, manual compaction, complete in all respctrespect. 93.84 95.63 Cft Per % Cft 3919.20 3678 4183.20 4000 5 Providing and laying R.C.C. pipe sewerspipe, moulded with cement concrete 1:1½:3 1:1½:3, with spigot socket or collar joint, etc. including cost of reinforcement, conforming to ASTM Specification C-76-79B.S. 5911: Part I: 1981, Class II. Wall B, "L" including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring jointing, cutting pipes where necessary, finishing and testing, etc., complete.12complete9" i/d 136.50 170.00 Rft Per Rft 756.60 103276 571.45 97147 6 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 211.55 106.12 Cft Per % Cft 27346.20 57851 31541.40 33472 7 Pacca brick work other than building in cement sand mortar (1:4) complete. 162.87 49.57 Cft Per % Cft 36297.80 59118 38294.65 18983 8 Cement plaster (1:4) 1/2" thick 138.81 51.96 Sft P. % Sft 3518.30 4884 4019.50 2089 9 Cement concrete plain including placing, compacting, finishing and curing complete: (1:2:4) 224.47 162.95 Cft Per % Cft 36557.40 82060 41520.60 67658 10 Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. 3.00 2.00 Nos. Each 11224.95 33675 12795.65 25591 11 Rehandling of earth work lead upto a single throw of XXXXX, Phorah or xxxxxx. 1937.74 1035.27 Cft Per %0 Cft 2798.40 5423 3326.40 3444 12 Transportation of earth all types when the total distance, including the lead covered in the item of work, Upto 15 Miles. 812.37 2278.72 Cft Per %0 Cft 16257.20 13207 18168.70 41401 MRS Xxxx Item Total (A) Rs:- 443980 434869 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: Percentage / Item Rate Tender and Contract for Works

NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 282.00 400.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling Cement Concrete 1:2:4 Plain 317.32 177.74 Cft Per % Cft 12312.95 39071 21885 2 Dismantling Cement Concrete 1:4:8 Plain 211.55 134.65 Cft Per % Cft 6156.50 13024 8290 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-up to 0 - 7' depth 2221.24 2692.97 Cft Per %0 Cft 12926.85 28714 34812 4 Supply and filling of sand under floor and around the pipe i/c leveling, manual compaction, complete in all respct. 93.84 Cft Per % Cft 3919.20 3678 5 Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.12" i/d 136.50 178.50 Rft Per Rft 756.60 103276 6 135053 5 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 211.55 177.74 Cft Per % Cft 27346.20 57851 7 48605 6 Pacca brick work other than building in cement sand mortar (1:4) complete. 162.87 131.35 Cft Per % Cft 36297.80 59118 8 36297.85 47677 7 Cement plaster (1:4) 1/2" thick 138.81 158.64 Sft P. % Sft 3518.30 4884 9 5581 8 Cement concrete plain including placing, compacting, finishing and curing complete: (1:2:4) 224.47 283.72 Cft Per % Cft 36557.40 82060 10 103721 9 Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. 3.00 Nos. Each 11224.95 33675 11 10 Rehandling of earth work lead upto a single throw of XXXXX, Phorah or xxxxxx. 1937.74 2444.95 Cft Per %0 Cft 2798.40 5423 12 6842 11 Transportation of earth all types when the total distance, including the lead covered in the item of work, Upto 15 Miles. 812.37 560.41 Cft Per %0 Cft 16257.20 13207 9111 MRS Xxxx Total (A) Rs:- 443980 455251 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: Percentage / Item Rate Tender and Contract for Works

NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 282.00 242.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling Cement Concrete of P.C.C 1:2:4 Plain 317.32 52.80 Cft Per P % Cft 12312.95 39071 6501 2 Dismantling Cement Concrete 1:4:8 Plain 211.55 Cft Per % Cft 6156.50 13024 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-up to 0 - 7' depth 2221.24 Cft Per %0 Cft 12926.85 28714 4 Supply and filling of sand under floor and around the pipe i/c leveling, manual compaction, complete in all respct. 93.84 Cft Per % Cft 3919.20 3678 5 Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.12" i/d 136.50 Rft Per Rft 756.60 103276 6 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 211.55 Cft Per % Cft 27346.20 57851 7 Pacca brick work other than building in cement sand mortar (1:4) complete. 162.87 307.82 Cft Per P % Cft 36297.80 59118 8 111732 3 Extra pacca brick work in steining of xxxxx or any other circular masonary 307.82 Cft P % Cft 3193.20 9829 4 Cement sand plaster in cement sand mortar (1:4) ), 1/2" thick 138.81 complete. 410.42 Sft P. P % Sft 3518.30 4884 9 14440 5 Providing / laying of Cement concrete plain including i/c placing, compacting, finishing and curing complete: complete (1:2:4) 224.47 55.97 Cft Per P % Cft 36557.40 82060 10 Providing and fixing, 20461 6 Bailing out water (by pump) 27000.00 Cft P % Cft 914.40 24689 7 P/F 6" (150 mm) thick R.C.C. R.C.C manhole cover 22"i/d with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d Frame complete as per standard Standerd drawing STD/PD Noand design. 7 of 1977, complete in all respects. 3.00 10.00 Nos. Each 11224.95 33675 11 Rehandling of earth work lead upto a single throw of XXXXX, Phorah or xxxxxx. 1937.74 Cft Per %0 Cft 2798.40 5423 12 Transportation of earth all types when the total distance, including the lead covered in the item of work, Upto 15 Miles. 812.37 Cft Per %0 Cft 16257.20 13207 112250 MRS Xxxx Total (A) Rs:- 443980 299902 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:- Add PST @ 5% on all items Grand Total Rs. 1 Providing and fixing Vin board cabinet 3/4" thick with drawers 3"deep in 'Kitchen including termite proofing and polishing with synthetic enamel as specified, with handles hinges,screws etc., complete in all respects iv) 2' deep,with back. 224.00 Sft P. Sft 1183.15 265026 2 Providing and laying 3/4" thick full width Prepolished Marbleslab for Vanities / Shelves / Treads/Window Cills , having Uniform texture (Spotless) with adhesive bond over 3/4" thick (1:2) cement sand mortor i/c the cost of matching sealer complete in all respects as approved and directed by the Engineer Incharge. 35.80 Sft P. Sft 498.65 17852 3 Providing and fixing Vin board cabinet 3/4" thick with drawers 3"deep in 'Kitchen including termite proofing and polishing with synthetic enamel as specified, with handles hinges,screws etc., complete in all respects.iv) 2' deep,with back. 71.20 Sft P. Sft 1396.65 99441 4 Providing and laying superb quality Porcelain glazed tiles flooring of MASTER brand of specified sizein approved design,Color and Shade with adhesive/bond over 3/4"thick (1:3) cement plaster i/c the cost of sealer for finishing the joints i/c cutting grinding complete in all respect as approved and directed by the Engineer Incharge. Full body Glazed tiles 55.80 Sft P. Sft 469.75 26212 5 Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip xxxxxx/wooden casing an capping/G.I. wire/trenches (rate for cables only):- 3/0.74 mm (3/0.029") 80.00 Mtr P. Mtr 90.20 7216 MRS Item Total (A) Rs:- 415747 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: Percentage / Item Rate Tender and Contract for Works

AutoNDA by SimpleDocs

NON- MRS ITEMS. 1 Cutting of PCC / Asphalt Road with cutter machine complete. 282.00 280.00 Rft P. Rft Non MRS Items Total B:- Total (A+B) Rs:-- Add PST @ 5% on all items Grand Total Rs. 1 Dismantling Cement Concrete 1:2:4 Plain 317.32 227.86 Cft Per % Cft 12312.95 39071 11209.45 25542 2 Dismantling Cement Concrete 1:4:8 Plain 211.55 227.86 Cft Per % Cft 6156.50 13024 5604.70 12771 3 Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:-up to 0 - 7' depth 2221.24 1754.52 Cft Per %0 Cft 12926.85 28714 11770.45 20651 4 Supply and filling of sand under floor and around the pipe i/c leveling, manual compaction, complete in all respct. 93.84 Cft Per % Cft 3919.20 3678 5 Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.12complete.18" i/d 136.50 102.00 Rft Per Rft 756.60 103276 6 1184.25 120794 5 Cement concrete plain including placing, compacting, finishing and curing complete: (1:4:8) 211.55 227.86 Cft Per % Cft 27346.20 57851 7 27697.40 63111 6 Pacca brick work other than building in cement sand mortar (1:4) complete. 162.87 99.84 Cft Per % Cft 36297.80 59118 8 35561.90 35505 7 Cement plaster (1:4) 1/2" thick 138.81 104.84 Sft P. % Sft 3518.30 4884 9 3289.75 3449 8 Cement concrete plain including placing, compacting, finishing and curing complete: (1:2:4) 224.47 325.72 Cft Per % Cft 36557.40 82060 10 37004.60 120531 9 Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. 3.00 Nos. Each 11224.95 33675 11 11087.75 33263 10 Rehandling of earth work lead upto a single throw of XXXXX, Phorah or xxxxxx. 1937.74 1351.56 Cft Per %0 Cft 2798.40 5423 12 2547.60 3443 11 Transportation of earth all types when the total distance, including the lead covered in the item of work, Upto 15 Miles. 812.37 858.68 Cft Per %0 Cft 16257.20 13207 16658.40 14304 MRS Xxxx Total (A) Rs:- 443980 453365 Premium quoted % above / below on MRS items MRS Grand Total (A) Rs:-

Appears in 1 contract

Samples: Percentage / Item Rate Tender and Contract for Works

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!