<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-aqueduct power facilities shall be determined and allocated as follows: (1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, annual Financing Costs, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24. (2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities the desired delivery of Annual Table A Amounts for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors through Project Transportation Facilities for that year, all as determined by the State. (3) An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant. (4) To the extent the monies received or to be received by the State from all Contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- aqueduct power costs to the Agency and other Contractors in the same manner as costs under the capital component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rate.
Appears in 15 contracts
Samples: Water Supply Contract, Water Supply Contract, Water Supply Contract
<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-aqueduct power facilities shall be determined and allocated as follows:
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, annual Financing Costs, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities the desired delivery of Annual Table A Amounts for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors through Project Transportation Facilities for that year, all as determined by the State.
(3) An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- aqueduct power costs to the Agency District and other Contractors in the same manner as costs under the capital component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rate.
Appears in 4 contracts
Samples: Water Supply Contract, Water Supply Contract, Water Supply Contract
<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-aqueduct power facilities shall be determined and allocated as follows:>
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, any annual Financing Costsprincipal and interest payments on funds borrowed by or advanced to the State, annual principal and interest on bonds issued by the State or other agency, or under revenue bond financing contracts, any requirements for coverage, deposits to reserves, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs capital costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities project transportation facilities the desired delivery amounts of Annual Table A Amounts annual entitlements for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors contractors through Project Transportation Facilities project transportation facilities for that year, all as determined by the State.
(3) 42 An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors contractors for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; contractors provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- off-aqueduct power costs to the Agency and other Contractors contractors in the same manner as costs under the capital cost component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rateproject interest rate.
Appears in 3 contracts
Samples: Water Supply Contract, Water Supply Contract, Water Supply Contract
<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-aqueduct power facilities shall be determined and allocated as follows:
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, annual Financing Costs, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities the desired delivery of Annual Table A Amounts for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors through Project Transportation Facilities for that year, all as determined by the State.
(3) An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- aqueduct power costs to the Agency and other Contractors in the same manner as costs under the capital component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rate.to
Appears in 2 contracts
Samples: Water Supply Contract, Water Supply Contract
<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-aqueduct power facilities shall be determined and allocated as follows:
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, annual Financing Costs, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities the desired delivery of Annual Table A Amounts for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors through Project Transportation Facilities for that year, all as determined by the State.
(3) An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- off-aqueduct power costs to the Agency District and other Contractors in the same manner as costs under the capital component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rate.
Appears in 1 contract
Samples: Water Supply Contract
<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-aqueduct power facilities shall be determined and allocated as follows:>
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, any annual Financing Costsprincipal and interest payments on funds borrowed by or advanced to the State, annual principal and interest on bonds issued by the State or other agency, or under revenue bond financing contracts, any requirements for coverage, deposits to reserves, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs capital costs as to that part financed by 41 Amended: Amendment No. 17 such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities project transportation facilities the desired delivery amounts of Annual Table A Amounts annual entitlements for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors contractors through Project Transportation Facilities project transportation facilities for that year, all as determined by the State.
(3) 42 An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors contractors for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; contractors provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- off-aqueduct power costs to the Agency and other Contractors contractors in the same manner as costs under the capital cost component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rateproject interest rate.
Appears in 1 contract
Samples: Water Supply Contract
<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-aqueduct power facilities shall be determined and allocated as follows:>
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, any annual Financing Costsprincipal and interest payments on funds borrowed by or advanced to the State, annual principal and interest on bonds issued by the State or other agency, or under revenue bond financing contracts, any requirements for coverage, deposits to reserves, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs capital costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities project transportation facilities the desired delivery amounts of Annual Table A Amounts annual entitlements for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors contractors through Project Transportation Facilities project transportation facilities for that year, all as determined by the State.
(3) An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors annual entitlement for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractorsannual entitlement; provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- off-aqueduct power costs to the Agency and other Contractors contractors in the same manner as costs under the capital cost component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rateproject interest rate.
Appears in 1 contract
Samples: Water Supply Contract
<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-aqueduct power facilities shall be determined and allocated as follows:>
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, any annual Financing Costsprincipal and interest payments on funds borrowed by or advanced to the State, annual principal and interest on bonds issued by the State or other agency, or under revenue bond financing contracts, any requirements for coverage, deposits to reserves, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs capital costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities project transportation facilities the desired delivery amounts of Annual Table A Amounts annual entitlements for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors contractors through Project Transportation Facilities project transportation facilities for that year, all as determined by the State.
(3) An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors contractors for such 41 Amended: Amendment 18, 25 year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; contractors provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- off-aqueduct power costs to the Agency and other Contractors contractors in the same manner as costs under the capital cost component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rateproject interest rate.
Appears in 1 contract
Samples: Water Supply Contract
<Off-Aqueduct Power Facilities. Notwithstanding the provisions of subdivisions (a) through (c) of this Article or of Article 1(h), the costs of off-off- aqueduct power facilities shall be determined and allocated as follows:
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, annual Financing Costs, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities the desired delivery of Annual Table A Amounts for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors through Project Transportation Facilities for that year, all as determined by the State.
(3) An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- aqueduct power costs to the Agency and other Contractors in the same manner as costs under the capital component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rate.
Appears in 1 contract
Samples: Water Supply Contract
<Off-Aqueduct Power Facilities. > Notwithstanding the provisions of subdivisions (a) through and (cb) of this Article article, or of Article 1(h1(s), the costs of off-aqueduct power facilities shall be determined and allocated as follows:
(1) The off-aqueduct power costs shall include all annual costs the State incurs for any off-aqueduct power facility, which shall include, but not be limited to, power purchases, any annual Financing Costsprincipal and interest payments on funds borrowed by or advanced to the State, annual principal and interest on bonds issued by the State or other agency, or under revenue bond financing contracts, any requirements for coverage, deposits to reserves, and associated operation and maintenance costs of such facility, less any credits, interest earnings, or other monies received by the State in connection with such facility or Revenue Bonds issued to finance the Capital Costs of such facility. In the event the State finances all or any part of an off-aqueduct power facility directly from funds other than bonds or borrowed funds, in lieu of such annual principal and interest payments, the repayment of Capital Costs capital costs as to that part financed by such other funds shall be determined on the basis of the schedule that would have been required under Article 24.
(2) The annual costs of off-aqueduct power facilities as computed in (1) above shall initially be allocated among Contractors contractors in amounts which bear the same proportions to the total amount of such power costs that the total estimated electrical energy (kilowatt hours) required to pump through Project Transportation Facilities project transportation facilities the desired delivery amounts of Annual Table A Amounts annual entitlements for that year, as submitted pursuant to Article 12(a)(1) and as may be modified by the State pursuant to Article 12(a)(2), bears to the total estimated electrical energy (kilowatt hours) required to pump all such amounts for all Contractors contractors through Project Transportation Facilities project transportation facilities for that year, all as determined by the State.
(3) 44 An interim adjustment in the allocation of the power costs calculated in accordance with (2) above, may be made in May of each year based on April revisions in approved schedules of deliveries of project and nonproject water for Contractors contractors for such year. A further adjustment shall be made in the following year based on actual deliveries of project and nonproject water for Contractors; contractors provided, however, that in the event no deliveries are made through a pumping plant, the adjustments shall not be made for that year at that plant.
(4) To the extent the monies received or to be received by the State from all Contractors contractors for off-aqueduct power costs in any year are determined by the State to be less than the amount required to pay the off-aqueduct power costs in such year, the State may allocate and charge that amount of off- off-aqueduct power costs to the Agency and other Contractors contractors in the same manner as costs under the capital cost component of the Transportation Charge are allocated and charged. After that amount has been so allocated, charged and collected, the State shall provide a reallocation of the amounts allocated pursuant to this paragraph (4), such reallocation to be based on the allocations made pursuant to (2) and (3) above for that year, or in the event no such allocation was 43 Amended: Amendment 9 made for that year, on the last previous allocation made pursuant to (2) and (3) above. Any such reallocation of costs incurred prior to the Billing Transition Date shall include appropriate interest thereon at the Project Interest Rateproject interest rate.
Appears in 1 contract
Samples: Water Supply Contract