Operation of Lift. 3.1 The mode of operation of the passenger/materials lift shall be at the discretion of Management, but there shall be landings at intervals of not more than four (4) storey levels. Subject to sub-clause 3.3, an employee would not be required to walk either up or down more than two (2) floors within the range of the lift, or more than four (4) floors within the range of the lift. 3.2 When the building has risen so that the formwork exceeds floors above the lift travel, the lift travel shall be extended. 3.3 If mechanical or power failure puts the passengers/materials lift out of action, Management must endeavour to correct the failure as soon as possible and have the passengers/materials lift back in use. During such temporary stoppage of the passengers/ materials lift, the employees are expected to walk to their place of work to a maximum of four (4) levels to work in their respective classification, and no industrial action or dispute should take place. 3.4 When lifts are also used to carry materials, preference must be given to the transporting of employees at the starting, finishing and lunch times. Starting times of various Trades may be staggered by agreement to avoid lift congestion at starting and finishing times. 3.5 Should a crane or cranes on a building not be able to operate (eg., because of wind or mechanical failure), employees will continue to work to a maximum of four (4) levels above the range of the lift, provided that the appropriate emergency service is satisfied that it is capable of being able to provide first aid attendance, and removal if necessary, to/of any employee on any section of the project without the use of the crane/s.
Appears in 106 contracts
Samples: Collective Bargaining Agreement, Collective Bargaining Agreement, Collective Bargaining Agreement
Operation of Lift. 3.1 The mode of operation of the passenger/materials lift shall be at the discretion of Management, but there shall be landings at intervals of not more than four (4) storey levels. Subject to sub-clause 3.3, an employee would not be required to walk either up or down more than two (2) floors within the range of the lift, or more than four (4) floors within the range of the lift.
3.2 When the building has risen so that the formwork exceeds floors above the lift traveltrav el, the lift travel shall be extended.
3.3 If mechanical or power failure puts the passengers/materials lift out of action, Management must endeavour to correct the failure as soon as possible and have the passengers/materials lift back in use. During such temporary stoppage of the passengers/ materials lift, the employees are expected to walk to their place of work to a maximum of four (4) levels to work in their respective classification, and no industrial action or dispute should take place.
3.4 When lifts are also used to carry materials, preference must be given to the transporting of employees at the starting, finishing and lunch times. Starting times of various Trades may be staggered by agreement to avoid lift congestion at starting and finishing times.
3.5 Should a crane or cranes on a building not be able to operate (eg., because of wind or mechanical failure), employees will continue to work to a maximum of four (4) levels above the range of the lift, provided that the appropriate emergency service is satisfied that it is capable of being able to provide first aid attendance, and removal if necessary, to/of any employee on any section of the project without the use of the crane/s.
Appears in 4 contracts
Samples: Collective Bargaining Agreement, Collective Bargaining Agreement, Collective Bargaining Agreement
Operation of Lift. 3.1 The mode of operation of the passenger/materials lift shall be at the discretion of Management, but there shall be landings at intervals of not more than four (4) storey levels. Subject to sub-clause 3.3, an employee would not be required to walk either up or down more than two (2) floors within the range of the lift, or more than four (4) floors within the range of the lift.
3.2 When the building has risen so that the formwork exceeds floors above the lift travel, the lift travel shall be extended.
3.3 If mechanical or power failure puts the passengers/materials lift out of action, Management must endeavour to correct the failure as soon as possible and have the passengers/materials lift back in use. During such temporary stoppage of the passengers/ materials lift, the employees are expected to walk to their place of work to a maximum of four (4) levels to work in their respective classification, and no industrial action or dispute should take place.
3.4 When lifts are also used to carry materials, preference must be given to the transporting of employees at the starting, finishing and lunch times. Starting times of various Trades may be staggered by agreement to avoid lift congestion at starting and finishing times.
3.5 Should a crane or cranes on a building not be able to operate (eg., because of wind or mechanical failure), employees will continue to work to a maximum of four (4) levels above the range of the lift, provided that the appropriate emergency service is satisfied XXXXXX CONSTRUCTION MANAGEMENT PTY LTD and the MBAV/CFMEU Certified Agreement 2002-2005 that it is capable of being able to provide first aid attendance, and removal if necessary, to/of any employee on any section of the project without the use of the crane/s.
Appears in 1 contract
Samples: Collective Bargaining Agreement
Operation of Lift. 3.1 The mode of operation of the passenger/materials lift shall be at the discretion of Management, but there shall be landings at intervals of not more than four (4) storey levels. Subject to sub-clause 3.3, an employee would not be required to walk either up or down more than two (2) floors within the range of the lift, or more than four (4) floors within the range of the lift.
3.2 When the building has risen so that the formwork exceeds floors above the lift travel, the lift travel shall be extended.
3.3 If mechanical or power failure puts the passengers/materials lift out of action, Management must endeavour to correct the failure as soon as possible and have the passengers/materials lift back in use. During such temporary stoppage of the passengers/ materials lift, the employees are expected to walk to their place of work to a maximum of four (4) levels to work in their respective classification, and no industrial action or dispute should take place.
3.4 When lifts are also used to carry materials, preference must be given to the transporting of employees at the starting, finishing and lunch times. Starting times of various Trades may be staggered by agreement to avoid lift congestion at starting and finishing times.
3.5 Should a crane or cranes on a building not be able to operate (eg., because of wind or mechanical failure), employees will continue to work to a maximum of four (4) levels above the range of the lift, provided that the appropriate emergency service is satisfied M & S CONSTRUCTION AND MAINTENANCE and the MBAV/CFMEU Certified Agreement 2002-2005 that it is capable of being able to provide first aid attendance, and removal if necessary, to/of any employee on any section of the project without the use of the crane/s.
Appears in 1 contract
Samples: Collective Bargaining Agreement
Operation of Lift. 3.1 The mode of operation of the passenger/materials lift shall be at the discretion of Management, but there shall be landings at intervals of not more than four (4) storey levels. Subject to sub-clause 3.3, an employee would not be required to walk either up or down more than two (2) floors within the range of the lift, or more than four (4) floors within the range of the lift.
3.2 When the building has risen so that the formwork exceeds floors above the lift travel, the lift travel shall be extended.
3.3 If mechanical or power failure puts the passengers/materials lift out of action, Management must endeavour to correct the failure as soon as possible and have the passengers/materials lift back in use. During such temporary stoppage of the passengers/ materials lift, the employees are expected to walk to their place of work to a maximum of four (4) levels to work in their respective classification, and no industrial action or dispute should take place.
3.4 When lifts are also used to carry materials, preference must be given to the transporting of employees at the starting, finishing and lunch times. Starting times of various Trades may be staggered by agreement to avoid lift congestion at starting and finishing times.
3.5 Should a crane or cranes on a building not be able to operate (eg., because of wind or mechanical failure), employees will continue to work to a maximum of four (4) levels above the range of the lift, provided that the appropriate emergency service is satisfied STOSIUS CONSTRUCTIONS PTY LTD and the MBAV/CFMEU Certified Agreement 2002-2005 that it is capable of being able to provide first aid attendance, and removal if necessary, to/of any employee on any section of the project without the use of the crane/s.
Appears in 1 contract
Samples: Collective Bargaining Agreement
Operation of Lift. 3.1 The mode of operation of the passenger/materials lift shall be at the discretion of Management, but there shall be landings at intervals of not more than four (4) storey levels. Subject to sub-clause 3.3, an employee would not be required to walk either up or down more than two (2) floors within the range of the lift, or more than four (4) floors within the range of the lift.
3.2 When the building has risen so that the formwork exceeds floors above the lift travel, the lift travel shall be extended.
3.3 If mechanical or power failure puts the passengers/materials lift out of action, Management must endeavour to correct the failure as soon as possible and have the passengers/materials lift back in use. During such temporary stoppage of the passengers/ materials lift, the employees are expected to walk to their place of work to a maximum of four (4) levels to work in their respective classification, and no industrial action or dispute should take place.
3.4 When lifts are also used to carry materials, preference must be given to the transporting of employees at the starting, finishing and lunch times. Starting times of various Trades may be staggered by agreement to avoid lift congestion at starting and finishing times.
3.5 Should a crane or cranes on a building not be able to operate (eg., because of wind or mechanical failure), employees will continue to work to a maximum of four (4) levels above the range of the lift, provided that the appropriate emergency service is satisfied DUSK TO XXXX CONCRETE CONSTRUCTIONS PTY LTD and the MBAV/CFMEU Certified Agreement 2002-2005 that it is capable of being able to provide first aid attendance, and removal if necessary, to/of any employee on any section of the project without the use of the crane/s.
Appears in 1 contract
Samples: Building and Construction Industry Collective Bargaining Agreement
Operation of Lift. 3.1 The mode of operation of the passenger/materials lift shall be at the discretion of Management, but there shall be landings at intervals of not more than four (4) storey levels. Subject to sub-clause 3.3, an employee would not be required to walk either up or down more than two (2) floors within the range of the lift, or more than four (4) floors within the range of the lift.
3.2 When the building has risen so that the formwork exceeds floors above the lift travel, the lift travel shall be extended.
3.3 If mechanical or power failure puts the passengers/materials lift out of action, Management must endeavour to correct the failure as soon as possible and have the passengers/materials lift back in use. During such temporary stoppage of the passengers/ materials lift, the employees are expected to walk to their place of work to a maximum of four (4) levels to work in their respective classification, and no industrial action or dispute should take place.
3.4 When lifts are also used to carry materials, preference must be given to the transporting of employees at the starting, finishing and lunch times. Starting times of various Trades may be staggered by agreement to avoid lift congestion at starting and finishing times.
3.5 Should a crane or cranes on a building not be able to operate (eg., because of wind or mechanical failure), employees will continue to work to a maximum of four (4) levels above the range of the lift, provided that the appropriate emergency service is satisfied CONCRETE PLACEMENT TECHNOLOGIES PTY LTD and the MBAV/CFMEU Certified Agreement 2002-2005 that it is capable of being able to provide first aid attendance, and removal if necessary, to/of any employee on any section of the project without the use of the crane/s.
Appears in 1 contract
Samples: Collective Bargaining Agreement