Opinion of Probable Cost. As a design professional practicing in El Paso the Consultant is expected to be familiar with the cost of construction, labor, and materials in the El Paso area and of bidding and market trends. The cost opinions of construction cost provided by the Consultant, as required herein, are to be made in light of such familiarity and are expected to be within ten percent (10%) of the bid for the base bid item expected from the lowest responsible bidder. The Consultant’s final cost opinions for the construction of the Project, shall take into account labor costs which shall be based on the current City of El Paso prevailing wage rates as adopted by the City Council. In the event that the Project is funded with federal funds, the higher of the City of El Paso prevailing wage rates or the Xxxxx-Xxxxx wage rates shall be utilized by the Consultant in compiling a final cost opinions for the Project. If the Consultant’s most recent cost opinion for any construction contract is in excess of the Project construction budget, the Owner shall give written approval of an increase in the limit, or shall cooperate in revising the Project’s scope or quality, or both, to reduce the cost as required. Such revisions shall be made, and Drawings and Specifications modified by the Consultant without further compensation. As noted herein, if all responsible bids exceed the final cost opinion by more than ten percent (10%), the Consultant agrees, at the direction of the Owner, to redesign the Project without additional charge to the Owner in order to bring the Project within the budgetary limitations.

Appears in 3 contracts

Samples: Agreement, Professional Services, www2.elpasotexas.gov

AutoNDA by SimpleDocs

Opinion of Probable Cost. As a design professional practicing in El Paso the Consultant is expected to be familiar with the cost of construction, labor, and materials in the El Paso area and of bidding and market trends. The cost opinions of construction cost provided by the Consultant, as required herein, are to be made in light of such familiarity and are expected to be within ten percent (10%) of the bid for the base bid item expected from the lowest responsible bidder. The Consultant’s final cost opinions for the construction of the Project, shall take into account labor costs which shall be based on the current City of El Paso prevailing wage rates as adopted by the City Council. In the event that the Project is funded with federal funds, the higher of the City of El Paso prevailing wage rates or the Xxxxx-Xxxxx wage rates shall be utilized by the Consultant in compiling a final cost opinions for the Project. If the Consultant’s most recent cost opinion for any construction contract is in excess of the Project construction budget, the Owner shall give written approval of an increase in the limit, or shall cooperate in revising the Project’s scope or quality, or both, to reduce the cost as required. Such revisions shall be made, and Drawings and Specifications modified by the Consultant without further compensation. As noted herein, if all responsible bids exceed the final cost opinion by more than ten percent (10%), the Consultant agrees, at the direction of the Owner, to redesign the Project without additional charge to the Owner in order to bring the Project within the budgetary limitations.limitations sample

Appears in 1 contract

Samples: An Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.