Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans. 7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups. 7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA. 7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch. 7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering. 7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis. 7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT. 7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 31 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
Appears in 21 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Qwest and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMP. CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st Day beyond the Service Date.
Appears in 20 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Qwest and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMP. CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
Appears in 17 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 16 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: xxxx://xxx.xxxxxxxxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 13 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport Direct Trunked Transport or tandem switched transportTandem Switched Transport); 3) the number of Ports to be provisioned at an End Office Switch end office or local Tandem Switchtandem; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 6 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Qwest and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMP. CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 4 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 6.4.1 When ordering LISType 2 Service, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., i.e. direct trunked transport or tandem switched transport); and 3) the number of Ports ports to be provisioned at an End Office office Switch or local Local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, routing or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, configuration based on available facilities, equipment and routing plans.
7.4.2 6.4.2 For each NXX Code code assigned to CLEC VZW by the NANPA, CLEC VZW will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's VZW’s Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS Type 2 trunk groups, CLEC VZW will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA an NPA-NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 6.4.3 When either Party has ordered a DS3 WIS Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party VZW has provided or ordered a DS1 WIS Entrance Facility or private line facility, that Party VZW will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 6.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 6.4.5 If CLEC VZW uses a method of interconnection of one POI in the LATA or the access tandem for local the exchange of traffic in accordance with Section 7.1.2 6.1.2 and/or 7.2.2.9.66.2.2.9.6, CenturyLink Qwest and CLEC VZW will work together to review CLECVZW’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 6.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink 6.4.7 Qwest will establish intervals for the provision of LIS WIS trunks that conform to the performance objectives set forth in Section 20the Standard Interval Guide (SIG), available on Qwest’s web site: xxxx://xxx.xxxxx.xxx/wholesale/pcat/wireless.html. CenturyLink Qwest will provide notice to CLEC VZW of any changes related to ordering Type 2 service according to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCATestablished processes.
7.4.8 6.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. available If the ordering Party is unable to accept service Type 2 Service within thirty (30) Days after the Service Dateoriginal service date, the provider VZW has the following options:
a) The order for Type 2 Service will be cancelled, and cancellation charges specified in 6.3.5.1 apply unless otherwise mutually agreed by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st Day after the Service Date
Appears in 3 contracts
Samples: Type 2 Wireless Interconnection Agreement, Type 2 Wireless Interconnection Agreement, Type 2 Wireless Interconnection Agreement
Ordering. 7.4.1 In general, OBF guidelines for ordering Interconnection will be followed. When ordering LISInterconnection trunking, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans. CLEC will order its trunks when it uses one-way trunks, for its originating traffic, or two- way trunks. Qwest will be responsible for ordering trunks when it uses one-way trunks for its originating traffic.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS Interconnection trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private OCn entrance line facility, that Party will order the appropriate DS1 facility required and identify the DS1 channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the that DS1 private line facility to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 3 contracts
Samples: Telecommunications, Interconnection Agreement, Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
Appears in 3 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Qwest and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMP. CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence.
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request Request: (ASR): ) 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport Direct Trunked Transport or tandem switched transportTandem Switched Transport); 3) the number of Ports ports to be provisioned at an End Office Switch end office or local Tandem Switchtandem; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx:80/wholesale/notification/npa-nxxProcess.html. Either Party party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch switch is served by multiple trunk groups.
7.4.3 When either Party party has ordered a DS3 Entrance Facility or private line facility, that Party party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party party has provided or ordered a DS1 Entrance Facility or private line facility, that Party party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI Trunks will be ordered either to Qwest's end offices directly or to Qwest's local tandem for Exchange Service (EAS/Local) traffic. Except as set forth elsewhere in the LATA or the this Agreement, separate trunks will be ordered to Qwest's access tandem only for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Exchange Access (IntraLATA toll) and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR orderingJointly Provided Switched Access traffic.
7.4.6 Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch switch location of Interconnection between the Parties will be determined on an Individual Case Basisindividual case basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks in the Interconnect & Resale Resource Guide (IRRG) that conform to the performance objectives set forth in the Service Performance Section 20of this Agreement. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) change management process applicable to the PCATIRRG. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMPCLEC Industry Change Management Process (CICMP). CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCATIRRG.
7.4.8 The ordering Party party may cancel an order at any time prior to notification that service is available. If the ordering Party party is unable to accept service within thirty (30) Days calendar days after the Service Dateservice date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Reserved for Future Use
c) Billing for the service will commence. In such instances, the cancellation date or the date billing is to commence, depending on which option is selected, will be the 31st calendar day beyond the service date.
Appears in 2 contracts
Samples: Telecommunications, Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Qwest and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMP. CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 6.4.1 When ordering LISType 2 Service, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., i.e. direct trunked transport or tandem switched transport); and 3) the number of Ports ports to be provisioned at an End Office office Switch or local Local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, routing or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, configuration based on available facilities, equipment and routing plans.
7.4.2 6.4.2 For each NXX Code code assigned to CLEC WSP by the NANPA, CLEC WSP will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's WSP‟s Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS Type 2 trunk groups, CLEC WSP will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 6.4.3 When either Party has ordered a DS3 WIS Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party WSP has provided or ordered a DS1 WIS Entrance Facility or private line facility, that Party WSP will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 6.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 6.4.5 If CLEC WSP uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 6.1.2 and/or 7.2.2.9.66.2.2.9.6, CenturyLink Qwest and CLEC WSP will work together to review CLEC’s WSP‟s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 6.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink 6.4.7 Qwest will establish intervals for the provision of LIS WIS trunks that conform to the performance objectives set forth in Section 20the Standard Interval Guide (SIG), available on Qwest‟s web site: xxxx://xxx.xxxxx.xxx/wholesale/pcat/wireless.html. CenturyLink Qwest will provide notice to CLEC WSP of any changes related to ordering Type 2 service according to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCATestablished processes.
7.4.8 6.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service Type 2 Service within thirty (30) Days after the Service Dateoriginal service date, the provider WSP has the following options:
a) The order for Type 2 Service will be cancelled, and cancellation charges specified in 6.3.5.1 apply unless otherwise mutually agreed by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st Day after the Service Date
Appears in 2 contracts
Samples: Type 2 Wireless Interconnection Agreement, Type 2 Wireless Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct togethe ect and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 6.4.1 When ordering LISType 2 Service, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., i.e. direct trunked transport or tandem switched transport); and 3) the number of Ports ports to be provisioned at an End Office office Switch or local Local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, routing or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, configuration based on available facilities, equipment and routing plans.
7.4.2 6.4.2 For each NXX Code code assigned to CLEC WSP by the NANPA, CLEC WSP will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's WSP’s Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS Type 2 trunk groups, CLEC WSP will also provide CenturyLink with the CenturyLink assigned two-six code Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: xxxx://xxx.xxxxxxxxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 6.4.3 When either Party has ordered a DS3 WIS Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party WSP has provided or ordered a DS1 WIS Entrance Facility or private line facility, that Party WSP will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 6.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 6.4.5 If CLEC WSP uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 6.1.2 and/or 7.2.2.9.66.2.2.9.6, CenturyLink and CLEC WSP will work together to review CLECWSP’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 6.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 6.4.7 CenturyLink will establish intervals for the provision of LIS WIS trunks that conform to the performance objectives set forth in Section 20the Standard Interval Guide (SIG), available on CenturyLink’s web site: xxxx://xxx.xxxxxxxxxxx.xxx/wholesale/pcat/wireless.html. CenturyLink will provide notice to CLEC WSP of any changes related to ordering Type 2 service according to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCATestablished processes.
7.4.8 6.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service Type 2 Service within thirty (30) Days after the Service Dateoriginal service date, the provider WSP has the following options:
a) The order for Type 2 Service will be cancelled, and cancellation charges specified in 6.3.5.1 apply unless otherwise mutually agreed by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st Day after the Service Date
Appears in 2 contracts
Samples: Type 2 Wireless Interconnection Agreement, Type 2 Wireless Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web sitesite at: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Qwest and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMP. CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st Day beyond the Service Date.
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request Request: (ASR): ) 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport Direct Trunked Transport or tandem switched transportTandem Switched Transport); 3) the number of Ports ports to be provisioned at an End Office Switch end office or local Tandem Switchtandem; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx:80/wholesale/notification/npa-nxxProcess.html. Either Party party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch switch is served by multiple trunk groups.
7.4.3 When either Party party has ordered a DS3 Entrance Facility or private line facility, that Party party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party party has provided or ordered a DS1 Entrance Facility or private line facility, that Party party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI Trunks will be ordered either to Qwest's end offices directly or to Qwest's local tandem for Exchange Service (EAS/Local) traffic. Except as set forth elsewhere in the LATA or the this Agreement, separate trunks will be ordered to Qwest's access tandem only for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Exchange Access (IntraLATA toll) and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR orderingJointly Provided Switched Access traffic.
7.4.6 [SEE STATE SPECIFIC LANGUAGE FOR UT] Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch switch location of Interconnection between the Parties will be determined on an Individual Case Basisindividual case basis.
7.4.7 CenturyLink [SEE STATE SPECIFIC LANGUAGE FOR UT] Qwest will establish intervals for the provision of LIS trunks in the Interconnect & Resale Resource Guide (IRRG) that conform to the performance objectives set forth in the Service Performance Section 20of this Agreement. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) change management process applicable to the PCATIRRG. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMPCLEC Industry Change Management Process (CICMP). CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCATIRRG.
7.4.8 The ordering Party party may cancel an order at any time prior to notification that service is available. If the ordering Party party is unable to accept service within thirty (30) Days calendar days after the Service Dateservice date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Reserved for Future Use
c) Billing for the service will commence. In such instances, the cancellation date or the date billing is to commence, depending on which option is selected, will be the 31st calendar day beyond the service date.
Appears in 2 contracts
Samples: Telecommunications, Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport Direct Trunked Transport or tandem switched transportTandem Switched Transport); 3) the number of Ports to be provisioned at an End Office Switch end office or local Tandem Switchtandem; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC Sprint by the NANPA, CLEC Sprint will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the Sprint Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC Sprint will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 1 contract
Samples: Local Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility facility or private line facility, that Party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 1 contract
Samples: Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request Request: (ASR): ) 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport Direct Trunked Transport or tandem switched transportTandem Transmission); 3) the number of Ports trunks to be provisioned at an End Office Switch end office or local Tandem Switchtandem; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest local tandem and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may This information can be provided via the NPA NXX Code Request Routing Form Supplemental Form- Wireline available on the CenturyLink Qwest web site: Either Party shall respond xxx.xxxxxx.xxx/xxxxxxx/xxxxxxxxx/xxxxxxx.xxxx, and is required to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groupsensure that Qwest routes CLEC's traffic appropriately.
7.4.3 When either Party CLEC has ordered a DS3 Entrance Facility or has purchased a DS3 private line facilityfacility to establish a InterLCA Facility, that Party CLEC will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA)assignments. Also, if either Party CLEC has provided or ordered a DS1 Entrance Facility or has purchased a DS1 private line facilityfacility to establish a InterLCA Facility, that Party CLEC will be responsible for identification of the DS0 DS1 channels of the DS1 private line to be used to provide CFAcircuit facility assignment. The DS-1 or DS-3 entrance facilities may ride a higher capacity optical carrier SONET Private Line Transport Services system as part of the interconnection option.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties A Party requesting local tandem Interconnection will provide their its best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchlocal tandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA Trunks will be ordered either to Qwest's end offices directly or the to Qwest's local tandem for Exchange Service EAS/Local Traffic. Separate trunks will be ordered to Qwest's access tandem only for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Exchange Access (IntraLATA toll) and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR orderingJointly Provided Switched Access traffic.
7.4.6 Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.individual case basis
7.4.7 CenturyLink will establish Service intervals and due dates for the provision establishment of LIS trunks that conform to subsequent trunking arrangements for Interconnection between the performance objectives set forth Parties, will be in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent accordance with the Change Management Process (CMP) applicable to guidelines for LIS contained in the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.Interconnect & Resale Resource Guide, available on Qwest’s web site: xxxx://xxx.xxxxxx.xxx/carrier/guides/interconnect/
7.4.8 The ordering Party CLEC may cancel an order for LIS at any time prior to notification by Qwest that service is availableavailable for CLEC’s use. If the ordering Party CLEC is unable to accept service LIS within thirty (30) Days 30 calendar days after the Service Dateoriginal service date, the provider CLEC has the following options:
a) The order for LIS will be canceled; cancellation charges as noted in 7.3.5.1 apply; or
b) Billing for the service will commence.
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch. CLEC's start-up site activation Interconnection plans will be used by Qwest's capacity Provisioning staff so that feasibility information is provided back to CLEC within ten (10) business days thereafter. When Qwest determines that facilities are not available or are near exhaust, Qwest will immediately take steps to ensure that facilities are available in anticipation of CLEC's initial order Due Dates.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic Local Traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Qwest and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMP. CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st Day beyond the Service Date.
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility facility or private line facility, that Party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Qwest Version 3.6 Template Agreement, 03-16-2001 59 4/27/01/HAH for BB/NOS Comm Inc/NE/CDS-010426-0042 Service Request Request: (ASR): ) 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport Direct Trunked Transport or tandem switched transportTandem Switched Transport); 3) the number of Ports ports to be provisioned at an End Office Switch end office or local Tandem Switchtandem; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx:80/wholesale/notification/npa-nxxProcess.html. Either Party party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch switch is served by multiple trunk groups.
7.4.3 When either Party party has ordered a DS3 Entrance Facility or private line facility, that Party party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party party has provided or ordered a DS1 Entrance Facility or private line facility, that Party party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI Trunks will be ordered either to Qwest's end offices directly or to Qwest's local tandem for Exchange Service (EAS/Local) traffic. Except as set forth elsewhere in the LATA or the this Agreement, separate trunks will be ordered to Qwest's access tandem only for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6Exchange Access (IntraLATA toll) and Jointly Provided Switched Access traffic. Qwest Version 3.6 Template Agreement, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.03-16-2001 60 4/27/01/HAH for BB/NOS Comm Inc/NE/CDS-010426-0042
7.4.6 Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch switch location of Interconnection between the Parties will be determined on an Individual Case Basisindividual case basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks in the Interconnect & Resale Resource Guide (IRRG) that conform to the performance objectives set forth in the Service Performance Section 20of this Agreement. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) change management process applicable to the PCATIRRG. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMPCLEC Industry Change Management Process (CICMP). CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCATIRRG.
7.4.8 The ordering Party party may cancel an order at any time prior to notification that service is available. If the ordering Party party is unable to accept service within thirty (30) Days calendar days after the Service Dateservice date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Reserved for Future Use
c) Billing for the service will commence. In such instances, the cancellation date or the date billing is to commence, depending on which option is selected, will be the 31st calendar day beyond the service date.
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request Request: (ASR): ) 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport Direct Trunked Transport or tandem switched transportTandem Switched Transport); 3) the number of Ports ports to be provisioned at an End Office Switch end office or local Tandem Switchtandem; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx:80/wholesale/notification/npa-nxxProcess.html. Either Party party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch switch is served by multiple trunk groups.
7.4.3 When either Party party has ordered a DS3 Entrance Facility or private line facility, that Party party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party party has provided or ordered a DS1 Entrance Facility or private line facility, that Party party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.. Qwest Version 3.7 Template Agreement, 05-14-2001 Page 60 5-24-2001/bbd/Z-Tel/NE/CDS-010523-0107
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI Trunks will be ordered either to Qwest's end offices directly or to Qwest's local tandem for Exchange Service (EAS/Local) traffic. Except as set forth elsewhere in the LATA or the this Agreement, separate trunks will be ordered to Qwest's access tandem only for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Exchange Access (IntraLATA toll) and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR orderingJointly Provided Switched Access traffic.
7.4.6 Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch switch location of Interconnection between the Parties will be determined on an Individual Case Basisindividual case basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks in the Interconnect & Resale Resource Guide (IRRG) that conform to the performance objectives set forth in the Service Performance Section 20of this Agreement. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) change management process applicable to the PCATIRRG. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMPCLEC Industry Change Management Process (CICMP). CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCATIRRG.
7.4.8 The ordering Party party may cancel an order at any time prior to notification that service is available. If the ordering Party party is unable to accept service within thirty (30) Days calendar days after the Service Dateservice date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties; Qwest Version 3.7 Template Agreement, 05-14-2001 Page 61 5-24-2001/bbd/Z-Tel/NE/CDS-010523-0107
b) Reserved for Future Use
c) Billing for the service will commence. In such instances, the cancellation date or the date billing is to commence, depending on which option is selected, will be the 31st calendar day beyond the service date.
Appears in 1 contract
Samples: Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-two- six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups. Nothing in this section will be construed to require CLEC to show its Switches and/or NXX Codes as subtending CenturyLink Tandem Switches.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 4.1 When ordering LISLocal Interconnection, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 4.2 For each NXX Code assigned to CLEC NT&T by the NANPA, CLEC NT&T will provide CenturyLink Windstream with the CLLI codes of the CenturyLink Windstream Tandem Switches and CLEC's NT&T’s Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS Local trunk groups, CLEC NT&T will also provide CenturyLink Windstream with the CenturyLink Windstream assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 4.5 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch switch location of Interconnection interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink 4.6 Windstream will establish intervals for the provision of LIS Local Interconnection trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCATAttachment 18.
7.4.8 4.7 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges apply unless mutually agreed to by the Parties;
b) Billing for the service will commence.
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and ΒΚ∆Β ρδγγ ρϕμφ οϕβοχμ οϕ μθδρ ΒΚ∆Β{ν ιορϕμφ ⊥ϕιαδβπμ∴οδϕι δι ϕμ_μ οϕ ινπμ ⊥ϕμμ⊥ο ∴ι_ complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and togeWKHU WR UHYLHZ &/(&¶V QHWZRUN FRQILJXUDWLRQ LQ RUGHU WR HQVXUH FRUUHFW DQG complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A Where CLEC has not previously established a POI and operated in a LATA, or where a new POI is being established in a given LATA, or when CLEC is providing a new forecast or requests changes to an existing forecast, a joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.Intentionally Left Blank
7.4.6 Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) change management process applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMPCLEC Industry Change Management Process (CICMP). CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days calendar days after the Service Dateservice date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Reserved for Future Use
c) Billing for the service will commence. In such instances, the cancellation date or the date billing is to commence, depending on which option is selected, will be the 31st calendar day beyond the service date.
Appears in 1 contract
Samples: Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC SBCT by the NANPA, CLEC SBCT will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the SBCT Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC SBCT will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxxx.xxx/wholesale/notifices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch switch is served by multiple trunk groups.
7.4.3 When either Party SBCT has ordered a DS3 Entrance Facility facility or private line facility, that Party SBCT will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party SBCT has provided or ordered a DS1 Entrance Facility facility or private line facility, that Party SBCT will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA At SBCT’s option, trunks will be ordered either to Qwest's end offices directly or the access to Qwest's tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR orderingExchange Service (EAS/Local) traffic.
7.4.6 Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC SBCT of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) change management process applicable to the PCATIRRG. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMPCLEC Industry Change Management Process (CICMP). CenturyLink Qwest agrees that CLEC SBCT shall not be held to the requirements of the PCATIRRG.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days calendar days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Reserved for Future Use; and
c) Billing for the service will commence. In such instances, the cancellation date or the date billing is to commence, depending on which option is selected, will be the 31st calendar day beyond the Service Date.
Appears in 1 contract
Samples: Telecommunications
Ordering. 7.4.1 In general, OBF guidelines for ordering Interconnection will be followed. When ordering LISInterconnection trunking, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans. CLEC will order its trunks when it uses one-way trunks, for its originating traffic, or two- way trunks. Qwest will be responsible for ordering trunks when it uses one-way trunks for its originating traffic.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS Interconnection trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line OC-n entrance facility, that Party will order the appropriate DS1 facility required and identify the DS-1 channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 DSO channels of the that DS1 private line facility to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 1 contract
Samples: Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 1 contract
Samples: Telecommunications
Ordering. 7.4.1 6.4.1 When ordering LISType 2 Service, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., i.e. direct trunked transport or tandem switched transport); and 3) the number of Ports ports to be provisioned at an End Office office Switch or local Local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, routing or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, configuration based on available facilities, equipment and routing plans.
7.4.2 6.4.2 For each NXX Code code assigned to CLEC WSP by the NANPA, CLEC WSP will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS Type 2 trunk groups, CLEC WSP will also provide CenturyLink with the CenturyLink assigned two-six code Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: xxxx://xxx.xxxxxxxxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 6.4.3 When either Party has ordered a DS3 WIS Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party WSP has provided or ordered a DS1 WIS Entrance Facility or private line facility, that Party WSP will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 6.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 6.4.5 If CLEC WSP uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 6.1.2 and/or 7.2.2.9.66.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration WSP tion in order to ensure correct and complete ASR ordering.
7.4.6 6.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 6.4.7 CenturyLink will establish intervals for the provision of LIS WIS trunks that conform to the performance objectives set forth in Section 20the Standard Interval Guide (SIG), available on CenturyLink xxxx://xxx.xxxxxxxxxxx.xxx/wholesale/pcat/wireless.html. CenturyLink will provide notice to CLEC WSP of any changes related to ordering Type 2 service according to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCATestablished processes.
7.4.8 6.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service Type 2 Service within thirty (30) Days after the Service Dateoriginal service date, the provider WSP has the following options:
a) The order for Type 2 Service will be cancelled, and cancellation charges specified in 6.3.5.1 apply unless otherwise mutually agreed by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st Day after the Service Date
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 6.4.1 When ordering LISType 2 Service, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., i.e. direct trunked transport or tandem switched transport); and 3) the number of Ports ports to be provisioned at an End Office office Switch or local Local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, routing or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, configuration based on available facilities, equipment and routing plans.
7.4.2 6.4.2 For each NXX Code code assigned to CLEC Viaero Wireless by the NANPA, CLEC Viaero Wireless will provide CenturyLink QC with the CLLI codes of the CenturyLink QC Tandem Switches and CLEC's Viaero Wireless’s Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS Type 2 trunk groups, CLEC Viaero Wireless will also provide CenturyLink QC with the CenturyLink QC assigned two-six code Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink QC web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA an NPA-NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 6.4.3 When either Party has ordered a DS3 WIS Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party Viaero Wireless has provided or ordered a DS1 WIS Entrance Facility or private line facility, that Party Viaero Wireless will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 6.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 6.4.5 If CLEC Viaero Wireless uses a method of interconnection of one POI in the LATA or the access tandem for local the exchange of traffic in accordance with Section 7.1.2 6.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering6.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
Appears in 1 contract
Samples: Adoption of the Wireless Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink with the CLLI codes of the CenturyLink Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink with the CenturyLink assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink web site: xxxx://xxx.xxxxxxxxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as specified in 7.3.5.1 apply unless otherwise mutually agreed to by the Parties;
Appears in 1 contract
Samples: Interconnection Agreement
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.Intentionally Left Blank
7.4.6 Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) change management process applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMPCLEC Industry Change Management Process (CICMP). CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) Days calendar days after the Service Dateservice date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Reserved for Future Use
c) Billing for the service will commence. In such instances, the cancellation date or the date billing is to commence, depending on which option is selected, will be the 31st calendar day beyond the service date.
Appears in 1 contract
Samples: Telecommunications
Ordering. 7.4.1 6.4.1 When ordering LISType 2 Service, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., i.e. direct trunked transport or tandem switched transport); and 3) the number of Ports ports to be provisioned at an End Office office Switch or local Local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, routing or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, configuration based on available facilities, equipment and routing plans.
7.4.2 6.4.2 For each NXX Code code assigned to CLEC WSP by the NANPA, CLEC WSP will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's WSP’s Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS Type 2 trunk groups, CLEC WSP will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 6.4.3 When either Party has ordered a DS3 WIS Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party WSP has provided or ordered a DS1 WIS Entrance Facility or private line facility, that Party WSP will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 6.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 6.4.5 If CLEC WSP uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 6.1.2 and/or 7.2.2.9.66.2.2.9.6, CenturyLink Qwest and CLEC WSP will work together to review CLECWSP’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 6.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink 6.4.7 Qwest will establish intervals for the provision of LIS WIS trunks that conform to the performance objectives set forth in Section 20the Standard Interval Guide (SIG), available on Qwest’s web site: xxxx://xxx.xxxxx.xxx/wholesale/pcat/wireless.html. CenturyLink Qwest will provide notice to CLEC WSP of any changes related to ordering Type 2 service according to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink work centers are discussed as part of the CMP. CenturyLink agrees that CLEC shall not be held to the requirements of the PCATestablished processes.
7.4.8 6.4.8 The ordering Party may cancel an order at any time prior to notification that service is available. available If the ordering Party is unable to accept service Type 2 Service within thirty (30) Days after the Service Dateoriginal service date, the provider WSP has the following options:
a) The order for Type 2 Service will be cancelled, and cancellation charges specified in 6.3.5.1 apply unless otherwise mutually agreed by the Parties;
b) Intentionally Left Blank.
c) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st Day after the Service Date
Appears in 1 contract
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request Request: (ASR): ) 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport Qwest Version 3.6 Template Agreement, 03-16-2001 59 4/13/01/HAH for MS/360networks (USA) inc/NE/CDS-010411-0026 Direct Trunked Transport or tandem switched transportTandem Switched Transport); 3) the number of Ports ports to be provisioned at an End Office Switch end office or local Tandem Switchtandem; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Tandem Switches Qwest tandems and CLEC's the CLEC Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned twoTwo-six code Six Code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form Supplemental Form-Wireline available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx:80/wholesale/notification/npa-nxxProcess.html. Either Party party shall respond to a special request for a NPA NXX Code Request Routing Supplemental Form when a single Switch switch is served by multiple trunk groups.
7.4.3 When either Party party has ordered a DS3 Entrance Facility or private line facility, that Party party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party party has provided or ordered a DS1 Entrance Facility or private line facility, that Party party will be responsible for identification of the DS0 DSO channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch end office subtending the Tandem Switchtandem.
7.4.5 If CLEC uses a method of interconnection of one POI Trunks will be ordered either to Qwest's end offices directly or to Qwest's local tandem for Exchange Service (EAS/Local) traffic. Except as set forth elsewhere in the LATA or the this Agreement, separate trunks will be ordered to Qwest's access tandem only for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink Exchange Access (IntraLATA toll) and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR orderingJointly Provided Switched Access traffic.
7.4.6 Service intervals and Due Dates due dates for initial establishment of trunking arrangements at each new Switch switch Qwest Version 3.6 Template Agreement, 03-16-2001 60 4/13/01/HAH for MS/360networks (USA) inc/NE/CDS-010411-0026 location of Interconnection between the Parties will be determined on an Individual Case Basisindividual case basis.
7.4.7 CenturyLink Qwest will establish intervals for the provision of LIS trunks in the Interconnect & Resale Resource Guide (IRRG) that conform to the performance objectives set forth in the Service Performance Section 20of this Agreement. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) change management process applicable to the PCATIRRG. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMPCLEC Industry Change Management Process (CICMP). CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCATIRRG.
7.4.8 The ordering Party party may cancel an order at any time prior to notification that service is available. If the ordering Party party is unable to accept service within thirty (30) Days calendar days after the Service Dateservice date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Reserved for Future Use
c) Billing for the service will commence. In such instances, the cancellation date or the date billing is to commence, depending on which option is selected, will be the 31st calendar day beyond the service date.
Appears in 1 contract
Samples: Telecommunications
Ordering. 7.4.1 When ordering LIS, the ordering Party shall specify requirements on the Access Service Request (ASR): 1) the type and number of Interconnection facilities to terminate at the Point of Interconnection in the Serving Wire Center; 2) the type of interoffice transport, (i.e., direct trunked transport or tandem switched transport); 3) the number of Ports to be provisioned at an End Office Switch or local Tandem Switch; and 4) any optional features. When the ordering Party requests facilities, routing, or optional features different than those determined to be available, the Parties will work cooperatively in determining an acceptable configuration, based on available facilities, equipment and routing plans.
7.4.2 For each NXX Code assigned to CLEC by the NANPA, CLEC will provide CenturyLink Qwest with the CLLI codes of the CenturyLink Qwest Tandem Switches and CLEC's Point of Interface to which traffic associated with the NXX will be routed. For NXX Codes assigned to existing LIS trunk groups, CLEC will also provide CenturyLink Qwest with the CenturyLink Qwest assigned two-six code (TGSN) to which each NXX will be routed. Information that is not currently available in the LERG may be provided via the NPA NXX Code Request Routing Form available on the CenturyLink Qwest web site: xxxx://xxx.xxxxx.xxx/wholesale/notices/npa_nxxProcess.html. Either Party shall respond to a special request for a NPA NXX Code Request Routing Form when a single Switch is served by multiple trunk groups.
7.4.3 When either Party has ordered a DS3 Entrance Facility or private line facility, that Party will order the appropriate DS1 facility required and identify the channels of the DS3 to be used to provide connecting circuit facility assignments (CFA). Also, if either Party has provided or ordered a DS1 Entrance Facility or private line facility, that Party will be responsible for identification of the DS0 channels of the DS1 private line to be used to provide CFA.
7.4.4 A joint planning meeting will precede initial trunking orders. These meetings will result in agreement and commitment that both Parties can implement the proposed plan and the transmittal of Access Service Requests (ASRs) to initiate order activity. The Parties will provide their best estimate of the traffic distribution to each End Office Switch subtending the Tandem Switch.
7.4.5 If CLEC uses a method of interconnection of one POI in the LATA or the access tandem for local traffic in accordance with Section 7.1.2 and/or 7.2.2.9.6, CenturyLink and CLEC will work together to review CLEC’s network configuration in order to ensure correct and complete ASR ordering.
7.4.6 Service intervals and Due Dates for initial establishment of trunking arrangements at each new Switch location of Interconnection between the Parties will be determined on an Individual Case Basis.
7.4.7 CenturyLink 7.4.6 Qwest will establish intervals for the provision of LIS trunks that conform to the performance objectives set forth in Section 20. CenturyLink Qwest will provide notice to CLEC of any changes to the LIS trunk intervals consistent with the Change Management Process (CMP) applicable to the PCAT. Operational processes within CenturyLink Qwest work centers are discussed as part of the CMP. CenturyLink Qwest agrees that CLEC shall not be held to the requirements of the PCAT.
7.4.8 7.4.7 The ordering Party may cancel an order at any time prior to notification that service is available. If the ordering Party is unable to accept service within thirty (30) calendar Days after the Service Date, the provider has the following options:
a) The order will be canceled; cancellation charges as noted in 7.3.5.1 apply unless mutually agreed to by the Parties;
b) Billing for the service will commence. In such instances, the cancellation date or the date Billing is to commence, depending on which option is selected, will be the 31st calendar Day beyond the Service Date.
Appears in 1 contract
Samples: Interconnection Agreement