Outage Requirements Sample Clauses

The Outage Requirements clause defines the obligations and procedures related to planned or unplanned service interruptions. It typically outlines how much advance notice must be given before scheduled outages, the maximum allowable duration or frequency of outages, and the responsibilities of each party during these periods. This clause ensures that both parties are aware of and prepared for potential disruptions, minimizing operational impact and clarifying expectations around service availability.
Outage Requirements. Specific outage requirements shall be identified, and detailed outage plans developed, during final engineering. For purposes of coordinating the outages required to perform the work under this Agreement, the Connecting Transmission Owner provides the following information: For the Alcoa-▇▇▇▇▇▇▇▇ Line 12 reconductoring, an outage on Line 12 and APGI’s Line 10 will be required. To complete the Network Upgrade Facilities at ▇▇▇▇▇▇▇▇ Substation, the following outages may be required: • ▇▇▇▇▇▇▇▇-Boundary Line 1 outage to replace the incoming conductors; • ▇▇▇▇▇▇▇▇-Boundary Line 2 outage to replace the two wave traps/coupling capacitors and incoming conductor; • Alcoa-▇▇▇▇▇▇▇▇ Line 12 outage to replace incoming conductor and the incoming wave trap/coupling capacitor. To complete the Network Upgrade Facilities at Alcoa Substation, the following outages may be required: • Alcoa-▇▇▇▇▇▇▇▇ Line 12 outage to complete station reconductoring; • Tie bus breaker R8105 and the Alcoa owned station end will need to be out of service to replace disconnect switch DS8107; • Alcoa-▇▇▇▇▇▇▇▇ Line 12 outage to complete wave trap replacement; and • Bus outage to replace surge arresters. SERVICE AGREEMENT NO. 2472 Load at risk is not a concern for the Line 12 outages. However, short outage durations (3 days or less) of Line 12 and Alcoa switch DS8107 are preferred for system stability. • Outages shall comply with the Connecting Transmission Owner’s Transmission Control Center’s Application of Reliability Rules Policy (PCP&P 7.1). SERVICE AGREEMENT NO. 2472 APPENDIX D SECURITY ARRANGEMENTS DETAILS Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. SERVICE AGREEMENT NO. 2472 APPENDIX E IN-SERVICE DATE [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Rensselaer, NY 12144 Re: _____________ T...
Outage Requirements. Specific outage requirements shall be identified, and detailed outage plans developed, during final engineering. For purposes of coordinating the outages required to perform the work under this Agreement, the Connecting Transmission Owner provides the following information: For the Alcoa-▇▇▇▇▇▇▇▇ Line 12 reconductoring, an outage on Line 12 and APGI’s Line 10 will be required. To complete the Network Upgrade Facilities at ▇▇▇▇▇▇▇▇ Substation, the following outages may be required:  ▇▇▇▇▇▇▇▇-Boundary Line 2 outage to replace the two wave traps/coupling capacitors and incoming conductor;  Alcoa-▇▇▇▇▇▇▇▇ Line 12 outage to replace incoming conductor and the incoming wave trap/coupling capacitor. To complete the Network Upgrade Facilities at Alcoa Substation, the following outages may be required:  Tie bus breaker R8105 and the Alcoa owned station end will need to be out of service to replace disconnect switch DS8107;