Other Upgrades on Affected Systems Sample Clauses

Other Upgrades on Affected Systems. Hydro-Québec TransÉnergie has determined that a special protection scheme is required to accommodate the increase in transfer limit capacity associated with the Transmission Project and the related exports from the Quebec Control Area to New York of 80 MW. The required upgrades include: • Installation of DIP5000 telecommunication devices at Xxx Xxxxxx substation and Boundary Substation; • Modification of the logic of the generation rejection SPS and modify the settings; and • Modification of the minimum quantity of generation rejection. SERVICE AGREEMENT NO. 2472 The required upgrades will be addressed pursuant to a separate agreement by and among Hydro-Québec TransÉnergie, its subsidiary Cedars Rapids Transmission Co., and the Connecting Transmission Owner.
AutoNDA by SimpleDocs
Other Upgrades on Affected Systems. Hydro-Québec TransÉnergie has determined that a special protection scheme is required to accommodate the increase in transfer limit capacity associated with the Transmission Project and the related exports from the Quebec Control Area to New York of 80 MW. The required upgrades include:  Installation of DIP5000 telecommunication devices at Xxx Xxxxxx substation and Boundary Substation;  Modification of the logic of the generation rejection SPS and modify the settings; and  Modification of the minimum quantity of generation rejection. The required upgrades will be addressed pursuant to a separate agreement by and among Hydro-Québec TransÉnergie, its subsidiary Cedars Rapids Transmission Co., and the Connecting Transmission Owner. 6. Income Tax Gross-Up Pursuant to Article 5.17.4 of this Agreement, Transmission Developer shall provide Connecting Transmission Owner with an income tax gross-up for contribution in aid of construction in the estimated amount of $668,000 within thirty (30) days of acceptance of this Agreement by FERC. APPENDIX BFigure A-1 MILESTONES Figure A-2 1. Milestones APPENDIX B MILESTONES Milestone Date Responsible Party

Related to Other Upgrades on Affected Systems

  • Affected System An electric system other than the Transmission Provider’s Transmission System that may be affected by a proposed interconnection or on which a proposed interconnection or addition of facilities or upgrades may require modifications or upgrades to the Transmission System.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Technology Upgrades Notwithstanding any other provision of this Agreement, Verizon shall have the right to deploy, upgrade, migrate and maintain its network at its discretion. The Parties acknowledge that Verizon, at its election, may deploy fiber throughout its network and that such fiber deployment may inhibit or facilitate PNG’s ability to provide service using certain technologies. Nothing in this Agreement shall limit Verizon's ability to modify its network through the incorporation of new equipment or software or otherwise. PNG shall be solely responsible for the cost and activities associated with accommodating such changes in its own network.

  • Regulatory Event New Taxes If, after the Effective Date, a Regulatory Event occurs or New Taxes are imposed, and such event or taxes have a direct, material and adverse effect on the economic benefits to a Party of this ESA, the affected Party shall send written notice to the other Party, setting forth the Regulatory Event or New Taxes and reasonably demonstrating the effect of the same on the affected Party. Upon delivery of such notice, the Parties shall use reasonable efforts to negotiate an amendment to this ESA to mitigate such effect. Alternatively, if as a direct result of such a Regulatory Event or New Taxes, the Competitive Supplier incurs additional, material costs, the Competitive Supplier shall provide a written notice to the Town that documents: a) the effective date of the Regulatory Event or New Taxes; b) a detailed explanation and reasonable demonstration of the material costs incurred as a result of the Regulatory Event or New Taxes; c) the timing of the cost impact to be incurred by the Competitive Supplier; d) the proposed price increase per kWh to be passed on to Participating Consumers; and e) a proposed plan for coordinating with the Local Distributor for an increase in the price per kWh that is billed by the Local Distributor, designed to reimburse the Competitive Supplier for such cost impact. If the Town and the Competitive supplier cannot agree on the amendment to this ESA or reimbursement contemplated by this section, the matter may be subject to dispute resolution in accordance with section 12.2. In no event shall a price change become effective without providing Participating Consumers with a 30-day advance notice of the price change.

  • Upgrades If this copy of the Software is an upgrade from an earlier version of the Software, it is provided to you on a license exchange basis. You agree by your installation and use of such copy of the Software to voluntarily terminate your earlier XXXX and that you will not continue to use the earlier version of the Software or transfer it to another person or entity unless such transfer is pursuant to Section 3.

  • Discontinued Facility Any facility, element, arrangement or the like that the Federal Unbundling Rules do not require Frontier to provide on an unbundled basis to Onvoy, whether because the facility was never subject to an unbundling requirement under the Federal Unbundling Rules, because the facility by operation of law has ceased or ceases to be subject to an unbundling requirement under the Federal Unbundling Rules, or otherwise.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

Time is Money Join Law Insider Premium to draft better contracts faster.