Overhead Assessment Rate Sample Clauses

Overhead Assessment Rate. The Overhead Assessment Rate for the applicable billing agency’s costs will be used as defined in AOP Clause 46.
AutoNDA by SimpleDocs

Related to Overhead Assessment Rate

  • INTEREST CALCULATION COSTS 10.1 As set forth in 31 CFR 205.27, interest calculation costs are defined as those costs necessary for the actual calculation of interest, including the cost of developing and maintaining clearance patterns in support of the interest calculations. Interest calculation costs do not include expenses for normal disbursing services, such as processing of checks or maintaining records for accounting and reconciliation of cash balances, or expenses for upgrading or modernizing accounting systems. Interest calculation costs in excess of $50,000 in any year are not eligible for reimbursement, unless the State provides justification with the annual report.

  • Overhead Rates The Engineer shall use the provisional overhead rate indicated in Attachment E. If a periodic escalation of the provisional overhead rate is specified in Attachment E, the effective date of the revised provisional overhead rate must be included. For lump sum contracts, the overhead rate remains unchanged for the entire contract period.

  • Determination of One-Month LIBOR Pursuant to the terms of the Global Agency Agreement, the Global Agent shall calculate the Class Coupons for the applicable Classes of Notes (including MAC Notes on which the Exchange Administrator has directed the Global Agent to make payments) for each Accrual Period (after the first Accrual Period) on the applicable LIBOR Adjustment Date. “One-Month LIBOR” will be determined by using the “Interest Settlement Rate” for U.S. dollar deposits with a maturity of one month set by ICE Benchmark Administration Limited (“ICE”) as of 11:00 a.m. (London time) on the LIBOR Adjustment Date (the “ICE Method”). ICE’s Interest Settlement Rates are currently displayed on Bloomberg L.P.’s page “BBAM.” That page, or any other page that may replace page BBAM on that service or any other service that ICE nominates as the information vendor to display the ICE’s Interest Settlement Rates for deposits in U.S. dollars, is a “Designated Page.” ICE’s Interest Settlement Rates currently are rounded to five decimal places. If ICE’s Interest Settlement Rate does not appear on the Designated Page as of 11:00 a.m. (London time) on a LIBOR Adjustment Date, or if the Designated Page is not then available, One-Month LIBOR for that date will be the most recently published Interest Settlement Rate. If ICE no longer sets an Interest Settlement Rate, Freddie Mac will designate an alternative index that has performed, or that Freddie Mac (or its agent) expects to perform, in a manner substantially similar to ICE’s Interest Settlement Rate.

  • BASE PAY RATE The employee's basic hourly rate exclusive of overtime premium, shift premium, stability or any other special allowances.

  • Construction Cost Adjustment Contracting Officer, as provided in B5.21, B5.212, B5.251, B5.252, and B5.253, shall adjust Specified Road construction cost estimates in the Schedule of Items and show the adjustments as credits or debits to Timber Sale Account in the month when the road segment is accepted.

  • Mileage Rate The mileage rate for authorized travel – based on State of Florida rates on the Effective Date of this Agreement – is $0.445 per mile.

  • Mileage Rates The mileage rate shall be the maximum allowed by the Internal Revenue Service. If the IRS rate should change during the term of the contract, the contract rate shall change also on the date specified by the IRS.

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).

  • Start-Up Costs 4.1.1 The Government of Ontario will provide:

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

Time is Money Join Law Insider Premium to draft better contracts faster.