Common use of Owner Supplied Equipment, Items, and Services Clause in Contracts

Owner Supplied Equipment, Items, and Services. The following equipment, components, and personnel shall be supplied by Owner on or before the dates listed below in accordance with Attachment A. Contractor shall provide reasonable support and assistance to the Owner in accordance with the Agreement (including, where applicable, access to Site). Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Provide access to Liquefaction Facility pursuant to Section 4.3A of the Agreement. NTP Provide all work associated with overall program management among other contractors working directly for Owner and not in Contractor Group (“Owner’s Suppliers”), including Owner’s Suppliers for the Feed Gas Pipeline, wetland mitigation, permitting agencies, Owner consultants, and Owner’s activities. Ongoing requirement under the terms of the Agreement Make Owner’s personnel available for training pursuant to Section 3.5 of the Agreement. As required by the training program to be developed in accordance with Attachment V, but no later than 6 months before RFSU Execution Version Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Make Owner’s personnel available to Contractor for commissioning and testing pursuant to the terms of the Agreement, including Section 4.4. As required under the Project Commissioning Plan Provide any outside training and certification required by Applicable Law for Owner personnel shall be coordinated by Owner (other than the training to be provided by Contractor in accordance with Section 3.5 of the Agreement). Prior to RFSU Provide LNG Tanker for Ship Loading Time Test. Pursuant to Section 11.1D of Agreement Provide the Natural Gas necessary for Contractor (i) to achieve RFSU in accordance with Sections 11.1 and 11.2 of the Agreement and (ii) to conduct the Performance Tests and other commissioning activities in accordance with Section 11.3 of the Agreement. As required under Sections 11.1, 11.2 and 11.3 of the Agreement Provide FEED Gas Pipeline up to the designated tie-in points. Pipeline contractor will be responsible for access and laydown area development. 730 Days after NTP Provide water supply pipeline to the designated tie-in point. Pipeline contractor will be responsible for access and laydown area development. 2 months prior to first hydrotest scheduled Provide water for dust control from hydrotest pond if water is available. As an alternative for dust control, river water may be used. In any case Xxxxxxx Bayou potable water must not be used. As needed Purchasing and coordinating Natural Gas from Import Gas Pipeline for startup and initial operation of the Liquefaction Facility. Until vaporized, imported LNG can supply fuel gas to gas turbine generators. Required FEED Gas 60 days before RFSU Modify existing equipment or systems to incorporate liquefaction plant systems, such as: liquid nitrogen system, upgrade of existing plant DCS/SIS software, safety system program, Jetty loading arm modifications. Prior to startup and commissioning activities Verify existing pipe supports for structural adequacy to handle higher dynamic loads at the LNG Tanks. After EPC transient analysis Provide access and isolation to Existing Facility. Pursuant to Sections 3.25 and 4.3A of the Agreement Execution Version Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Property acquisition or use agreements for outfall land from property boundary to river. 2 months after NTP Wetlands mitigation to be performed on or off the Site. In accordance with the mitigation plan filed with the USACE Provide in-plant UHF and VHF base radio and handheld radio system. Prior to RFSU Provide vehicles for Owner’s own use. As determined by Owner Relocate existing NGPL 4” Fuel Gas underground pipelines routed through proposed OSBL/ISBL. 45 Days after NTP Provide/ensure sufficient draft clearance is available at the construction dock to allow the construction dock modification and pile loading efforts to be performed. Minimum clearance at the construction dock is to (-16’) at the seabed. 1 month prior to commencement of construction dock modifications and/or pile offloading

Appears in 4 contracts

Samples: Escrow Agreement (Sabine Pass Liquefaction, LLC), Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC), Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC)

AutoNDA by SimpleDocs

Owner Supplied Equipment, Items, and Services. The following equipment, components, and personnel shall be supplied by Owner on or before the dates listed below in accordance with Attachment A. Contractor shall provide reasonable support and assistance to the Owner in accordance with the Agreement (including, where applicable, access to Site). Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Provide access to Liquefaction Facility Stage 3 Site pursuant to Section 4.3A of the Agreement. NTP Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Provide all work associated with overall program management among other contractors working directly for Owner and not in Contractor Group (“Owner’s Suppliers”), including Owner’s Suppliers for the Feed Gas Pipeline, wetland mitigation, permitting agencies, Owner consultants, and Owner’s activities. Ongoing requirement under the terms of the Agreement Make Owner’s personnel available for training pursuant to Section 3.5 of the Agreement. As required by the training program to be developed in accordance with Attachment V, but no later than 6 months before RFSU Execution Version Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Make Owner’s personnel available to Contractor for commissioning and testing pursuant to the terms of the Agreement, including Section 4.4. As required under the Project Commissioning Plan Provide any outside training and certification required by Applicable Law for Owner personnel shall be coordinated by Owner (other than the training to be provided by Contractor in accordance with Section 3.5 of the Agreement). Prior to RFSU Provide LNG Tanker for Ship Loading Time Test. Pursuant to Section 11.1D of Agreement Provide the Natural Gas necessary for Contractor (i) to achieve RFSU in accordance with Sections 11.1 and 11.2 of the Agreement and (ii) to conduct the Performance Tests and other commissioning activities in accordance with Section 11.3 of the Agreement. As required under Sections 11.1, 11.2 and 11.3 of the Agreement Provide FEED Feed Gas Pipeline up to the designated tie-in points. Pipeline contractor will be responsible for access and laydown area development. 730 1,095 Days after NTP Provide water supply pipeline to the designated tie-in point. Pipeline contractor will be responsible for access and laydown area development. 2 months prior to first hydrotest scheduled Provide water for dust control from hydrotest pond if water is available. As an alternative for For dust control, river water may be used. In any case Xxxxxxx Bayou potable water must not be used. As needed Purchasing and coordinating Natural Gas from Import Gas Pipeline Provide Feed gas for startup and initial operation of the Liquefaction Facility. Until vaporized, imported LNG can supply fuel gas to gas turbine generators. Required FEED Feed Gas 60 days 6 Months before RFSU Modify existing equipment or systems to incorporate liquefaction plant systems, such as: liquid nitrogen system, upgrade of existing plant DCS/SIS software, safety system program, Jetty loading arm modifications. Prior to startup and commissioning activities Verify existing pipe supports for structural adequacy to handle higher dynamic loads at the LNG Tanks. After EPC transient analysis Provide access and isolation to Existing Facility. Pursuant to Sections 3.25 and 4.3A of the Agreement Execution Version Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Property acquisition Provide access and isolation to Existing Facility, Subproject 1, Subproject 2, Subproject 3, or use agreements for outfall land from property boundary Subproject 4 (or any portion), as applicable. Pursuant to river. 2 months after NTP Sections 3.25 and 4.3A of the Agreement Wetlands mitigation to be performed on or off the Site. In accordance with the mitigation plan filed with the USACE Provide in-plant UHF and VHF base radio and handheld radio systemsystem for Owner, except for Owner personnel provided under Section 4.4 of the Agreement. Prior to RFSU Provide vehicles for Owner’s own use. As determined by Owner Relocate existing NGPL 4” Fuel Gas underground pipelines routed through proposed OSBL/ISBL. 45 Days after NTP Provide/ensure sufficient draft clearance is available at the construction dock to allow the construction dock modification and pile loading efforts to be performed. Minimum clearance at the construction dock is to (-16’) at the seabed. 1 month prior to commencement of construction dock modifications and/or pile offloadingOwner

Appears in 2 contracts

Samples: Escrow Agreement (Cheniere Energy Partners, L.P.), Escrow Agreement (Cheniere Energy Partners, L.P.)

Owner Supplied Equipment, Items, and Services. The following equipment, components, and personnel shall be supplied by Owner on or before the dates listed below in accordance with Attachment A. Contractor shall provide reasonable support and assistance to the Owner in accordance with the Agreement (including, where applicable, access to Site). Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Provide access to Liquefaction Facility the Stage 2 Site pursuant to Section 4.3A of the Agreement NTP Provide property acquisition or use agreements for port laydown area, cotton laydown area, xxxxxxxx laydown area and sherwin tool and lunch area including access to such areas in accordance with the Agreement. , including Section 4.3 and Attachment Y of the Agreement NTP Provide property acquisition or use agreements for dredge material placement area (DMPA) 2 and clay borrow pit area including access to such areas in accordance with the Agreement, including Section 4.3 and Attachment Y of the Agreement NTP Provide LNG Tanker for Ship Loading Time Test Pursuant to Section 11.1D of the Agreement Provide treated water at a minimum flow rate of 900 gallons per minute for Tank (S2401-B) hydrostatic test through the treated water supply pipeline to the designated tie-in point Tank hydrostatic test date Widen and improve La Quinta Road from TX Hwy 361 to the Site NTP (in accordance with Attachment Y) Provide all work associated with overall program management among other contractors working directly for Owner and not in Contractor Group (“Owner’s Suppliers”), including Owner’s Suppliers for the Feed Gas Pipeline, wetland mitigationpipeline, permitting agencies, Owner consultants, and Owner’s activities. Ongoing requirement under the terms of the Agreement Make Owner’s personnel available for training pursuant to Section 3.5 of the Agreement. As required by the training program to be developed in accordance with Attachment V, but no later than 6 months before RFSU Execution Version Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Make Owner’s personnel available to Contractor for commissioning and testing pursuant to the terms of the Agreement, including Section 4.4. As required under the Project Commissioning Plan Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Provide any outside training and certification required by Applicable Law for Owner personnel shall be coordinated by Owner (other than the training to be provided by Contractor in accordance with Section 3.5 of the Agreement). Prior to RFSU Provide LNG Tanker for Ship Loading Time Test. Pursuant to Section 11.1D of Agreement Provide the Natural Gas necessary for Contractor (i) to achieve RFSU in accordance with Sections 11.1 and 11.2 of the Agreement and (ii) to conduct the Performance Tests and other commissioning activities in accordance with Section 11.3 of the Agreement. As required under Sections 11.1, 11.2 and 11.3 of the Agreement Provide FEED Gas Pipeline up to the designated tie-in points. Pipeline contractor will be responsible for access and laydown area development. 730 Days after NTP Provide water supply pipeline to the designated tie-in point. Pipeline contractor will be responsible for access and laydown area development. 2 months prior to first hydrotest scheduled Provide water for dust control from hydrotest pond if water is available. As an alternative for dust control, river water may be used. In any case Xxxxxxx Bayou potable water must not be used. As needed Purchasing and coordinating Natural Gas from Import Feed Gas Pipeline pipeline for startup and initial operation of the Liquefaction Facility. Until vaporized, imported LNG can supply fuel gas to gas turbine generators. Required FEED Gas 60 days Days before RFSU Modify existing equipment or systems to incorporate liquefaction Provide demineralized water from the Liquefaction Facility water treatment plant systems, such as: liquid nitrogen system, upgrade of existing plant DCS/SIS software, safety system program, Jetty loading arm modifications. Prior to for startup and commissioning activities Verify existing pipe supports for structural adequacy to handle higher dynamic loads at initial operation of the LNG Tanks. After EPC transient analysis Provide access and isolation to Existing Stage 2 Liquefaction Facility. Pursuant to Sections 3.25 60 Days before RFSU Provide potable water, plant air, instrument air, and 4.3A nitrogen from the Liquefaction Facility utilities plant for startup and initial operation of the Agreement Execution Version Description Stage 2 Liquefaction Facility. 60 Days before RFSU Provide permanent power from the Liquefaction Facility main substation for startup and initial operation of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Property acquisition or use agreements for outfall land from property boundary to riverthe Stage 2 Liquefaction Facility. 2 months after NTP Wetlands mitigation to be performed on or off the Site. In accordance with the mitigation plan filed with the USACE 60 Days before RFSU Provide in-plant UHF and VHF base radio and handheld radio systemsystem for Owner, except for Owner’s personnel provided under Section 4.4 of the Agreement. Prior to RFSU Provide vehicles for Owner’s own use. As determined by Owner Relocate existing NGPL 4” Fuel Gas underground pipelines routed through proposed OSBL/ISBL. 45 Days after NTP Provide/ensure sufficient draft clearance is available at the construction dock to allow the construction dock modification Provide and pile loading efforts to be performed. Minimum clearance at the construction dock is to (-16’) at the seabed. 1 month maintain security fencing around bed 22 per Site Plan Interface Locations Tie-Ins, 25744-200-P1K-00-10018 Rev 00C Installed prior to commencement of construction dock modifications and/or pile offloadingNTP Provide and maintain security fencing around Xxxx Ranch House foundation per Site Plan Interface Locations Tie-Ins, 25744-200-P1K-00-10018 Rev 00C. Installed prior to NTP

Appears in 1 contract

Samples: Escrow Agreement (Cheniere Energy Inc)

Owner Supplied Equipment, Items, and Services. The following equipment, components, and personnel shall be supplied by Owner on or before the dates listed below in accordance with Attachment A. Contractor shall provide reasonable support and assistance to the Owner in accordance with the Agreement (including, where applicable, access to Site). Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Provide access to Liquefaction Facility Stage 4 Site pursuant to Section 4.3A of the Agreement. At NTP or LNTP (for any LNTP Work where applicable) Provide all work associated with overall program management among other contractors working directly for Owner and not in Contractor Group (“Owner’s Suppliers”), including Owner’s Suppliers for the Feed Gas Pipeline, wetland mitigation, permitting agencies, Owner consultants, and Owner’s activities. Ongoing requirement under the terms of the Agreement Make Owner’s personnel available for training pursuant to Section 3.5 of the Agreement. As required by the training program to be developed in accordance with Attachment V, but no later than 6 months before RFSU Execution Version Description of Equipment/Components/Personnel Supplied Date Supplied or Subproject 6(a) and no later than 9 months before Substantial Completion of Subproject 6(b), if Owner elects the LNG Berth 3 Option pursuant to be Supplied Section 4.10A of the Agreement. Make Owner’s personnel available to Contractor for commissioning and testing pursuant to the terms of the Agreement, including Section 4.4. As required under the Project Commissioning Plan Execution Version Description of Equipment/Components/Personnel Supplied Date Supplie or to be Supplied Provide any outside training and certification required by Applicable Law for Owner personnel shall be coordinated by Owner (other than the training to be provided by Contractor in accordance with Section 3.5 of the Agreement). Prior to RFSU Provide of Subproject 6(a) and no later than 9 months before Substantial Completion of Subproject 6(b), if Owner elects the LNG Tanker for Ship Loading Time Test. Pursuant Berth 3 Option pursuant to Section 11.1D 4.10A of Agreement the Agreement. Provide the Natural Gas necessary for Contractor (i) to achieve RFSU of Subproject 6(a) in accordance with Sections Section 11.1 and 11.2 of the Agreement and (ii) to conduct the Performance Tests of Subproject 6(a) and other commissioning activities in accordance with Section 11.3 11.2 of the Agreement. As required under Sections 11.1, 11.2 11.1 and 11.3 of the Agreement Provide FEED Gas Pipeline up to the designated tie-in points. Pipeline contractor will be responsible for access and laydown area development. 730 Days after NTP Provide water supply pipeline to the designated tie-in point. Pipeline contractor will be responsible for access and laydown area development. 2 months prior to first hydrotest scheduled Provide water for dust control from hydrotest pond if water is available. As an alternative for For dust control, river water may be used. In any case Xxxxxxx Bayou potable water must not be used. As needed Purchasing and coordinating Natural Gas from Import Gas Pipeline Provide Feed gas for startup and initial operation of the Liquefaction Facility. Until vaporized, imported LNG can supply fuel gas to gas turbine generatorsSubproject 6(a). Required FEED Feed Gas 60 days 6 Months before RFSU of Subproject 6(a) Modify existing equipment or systems to incorporate liquefaction plant systems, such as: liquid nitrogen system, upgrade of existing plant Existing Facility DCS/SIS software, safety system program, Jetty loading arm modifications. Prior to startup and commissioning activities Verify existing pipe supports for structural adequacy to handle higher dynamic loads at the LNG Tanks. After EPC transient analysis Provide access and isolation to Existing Facility, Subproject 1, Subproject 2, Subproject 3, Subproject 4 or Subproject 5 (or any portion), as applicable. Pursuant to Sections 3.25 and 4.3A of the Agreement Execution Version Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Property acquisition or use agreements for outfall land from property boundary to river. 2 months after NTP Wetlands mitigation to be performed on or off the Site. In accordance with the mitigation plan filed with the USACE Provide in-plant UHF and VHF base radio and handheld radio systemsystem for Owner, except for Owner personnel provided under Section 4.4 of the Agreement. Prior to RFSU of Subproject 6(a) Provide vehicles for Owner’s own use. As determined by Owner Relocate existing NGPL 4” Fuel Gas underground pipelines routed through proposed OSBL/ISBL. 45 Days after NTP Provide/ensure sufficient draft clearance is available at the construction dock to allow the construction dock modification and pile loading efforts to be performed. Minimum clearance at the construction dock is to (-16’) at the seabed. 1 month prior to commencement of construction dock modifications and/or pile offloadingExecution Version

Appears in 1 contract

Samples: Escrow Agreement (Sabine Pass Liquefaction, LLC)

AutoNDA by SimpleDocs

Owner Supplied Equipment, Items, and Services. The following equipment, components, and personnel shall be supplied by Owner on or before the dates listed below in accordance with Attachment A. Contractor shall provide reasonable support and assistance to the Owner in accordance with the Agreement (including, where applicable, access to Site). Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Provide access to Liquefaction Facility the Stage 1 Site pursuant to Section 4.3A of the Agreement NTP Provide property acquisition or use agreements for port laydown area, cotton laydown area, xxxxxxxx laydown area and sherwin tool and lunch area including access to such areas in accordance with the Agreement. , including Section 4.3 and Attachment Y of the Agreement NTP Provide property acquisition or use agreements for dredge material placement area (DMPA) 2 and clay borrow pit area including access to such areas in accordance with the Agreement, including Section 4.3 and Attachment Y of the Agreement NTP Provide LNG Tanker for Ship Loading Time Test Pursuant to Section 11.1D of the Agreement Provide treated water at a minimum flow rate of 900 gallons per minute for Tanks (S2401-A and S2401-C) hydrostatic test through the treated water supply pipeline to the designated tie-in point Tank hydrostatic test date Widen and improve La Quinta Road from TX Hwy 361 to the Site NTP (in accordance with Attachment Y) Provide all work associated with overall program management among other contractors working directly for Owner and not in Contractor Group (“Owner’s Suppliers”), including Owner’s Suppliers for the Feed Gas Pipeline, wetland mitigationpipeline, permitting agencies, Owner consultants, and Owner’s activities. Ongoing requirement under the terms of the Agreement Make Owner’s personnel available for training pursuant to Section 3.5 of the Agreement. As required by the training program to be developed in accordance with Attachment V, but no later than 6 months before RFSU Execution Version Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Make Owner’s personnel available to Contractor for commissioning and testing pursuant to the terms of the Agreement, including Section 4.4. As required under the Project Commissioning Plan Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Provide any outside training and certification required by Applicable Law for Owner personnel shall be coordinated by Owner (other than the training to be provided by Contractor in accordance with Section 3.5 of the Agreement). Prior to RFSU Provide LNG Tanker for Ship Loading Time Test. Pursuant to Section 11.1D of Agreement Provide the Natural Gas necessary for Contractor (i) to achieve RFSU in accordance with Sections 11.1 and 11.2 of the Agreement and (ii) to conduct the Performance Tests and other commissioning activities in accordance with Section 11.3 of the Agreement. As required under Sections 11.1, 11.2 and 11.3 of the Agreement Provide FEED Gas Pipeline up to the designated tie-in points. Pipeline contractor will be responsible for access and laydown area development. 730 Days after NTP Provide water supply pipeline to the designated tie-in point. Pipeline contractor will be responsible for access and laydown area development. 2 months prior to first hydrotest scheduled Provide water for dust control from hydrotest pond if water is available. As an alternative for dust control, river water may be used. In any case Xxxxxxx Bayou potable water must not be used. As needed Purchasing and coordinating Natural Gas from Import Feed Gas Pipeline pipeline for startup and initial operation of the Liquefaction Facility. Until vaporized, imported LNG can supply fuel gas to gas turbine generators. Required FEED Feed Gas 60 days Days before RFSU Modify existing equipment or systems to incorporate liquefaction of Subproject 1 Provide demineralized water from the Liquefaction Facility water treatment plant systemsfor startup and initial operation of Subproject 2. 60 Days before RFSU of Subproject 2 Provide potable water, such as: liquid plant air, instrument air, and nitrogen systemfrom the Liquefaction Facility utilities plant for startup and initial operation of Subproject 2. 60 Days before RFSU of Subproject 2 Provide permanent power from the Liquefaction Facility main substation for startup and initial operation of Subproject 2. 60 Days before RFSU of Subproject 2 Provide in-plant UHF and VHF base radio and handheld radio system for Owner, upgrade except for Owner’s personnel provided under Section 4.4 of existing plant DCS/SIS software, safety system program, Jetty loading arm modificationsthe Agreement. Prior to startup RFSU of Subproject 1 Provide vehicles for Owner’s own use. As determined by Owner Provide and commissioning activities Verify maintain security fencing around bed 22 per Site Plan Interface Locations Tie-Ins, 25744-200-P1K-00-10018 Rev 00C. Installed prior to NTP Provide and maintain security fencing around Xxxx Ranch House foundation per Site Plan Interface Locations Tie-Ins, 25744-200-P1K-00-10018 Rev 00C. Installed prior to NTP Relocate and remove existing pipe supports for structural adequacy to handle higher dynamic loads underground pipelines at the LNG TanksSite per SK-UN-ALL-001 Rev 002. After EPC transient analysis Provide access NTP Relocate and isolation to Existing Facilityremove existing water monitoring xxxxx at the Site per SK-UN-ALL-001 Rev 002. Pursuant to Sections 3.25 and 4.3A of the Agreement Execution Version NTP Description of Equipment/Components/Personnel Supplied Date Supplied or to be Supplied Property acquisition or use agreements for outfall land from property boundary to river. 2 months after NTP Wetlands mitigation to be performed on or off Provide 138 kV electrical substation/switchyard and permanent power service at the Site. In accordance with the mitigation designated tie-in point per Site plan filed with the USACE Provide ininterface locations tie-plant UHF and VHF base radio and handheld radio system. Prior to RFSU Provide vehicles for Owner’s own use. As determined by Owner Relocate existing NGPL 4” Fuel Gas underground pipelines routed through proposed OSBL/ISBL. 45 ins, 25744-200-P1K-00-10018 Rev 00C. 794 Days after NTP Provide/ensure sufficient draft clearance is available Provide Feed Gas pipeline to the designated tie-in point per Site plan interface locations tie-ins, 25744-200-P1K-00-10018 Rev 00C. 180 Days before RFSU of Subproject 1 Provide condensate pipeline to the designated tie-in point per Site plan interface locations tie-ins, 25744-200-P1K-00-10018 Rev 00C. 180 Days before RFSU of Subproject 1 Provide treated water and the treated water supply pipeline to the designated tie-in point per Site plan interface locations tie-ins, 25744-200-P1K-00-10018 Rev 00C. 180 Days before Tank hydrostatic test date Provide potable water supply pipeline and potable water service to the designated tie-in point per Site plan interface locations tie-ins, 25744-200-P1K-00-10018 Rev 00C. 90 Days before building ready for occupancy Provide sewage disposal pipeline and sewage service to the designated tie-in point per Site plan interface locations tie-ins – 25744-200-P1K-00-10018 Rev 00C. 90 Days before building ready for occupancy Provide voice and data cables and voice and data service at the construction dock to allow the construction dock modification and pile loading efforts to be performed. Minimum clearance designated tie-in points at the construction dock is to (-16’) at telecom room in the seabed. 1 month prior to commencement of construction dock modifications and/or pile offloadingO&M and control building per Site plan interface locations tie-ins, 25744-200-P1K-00-10018 Rev 00C. 90 Days before building ready for occupancy

Appears in 1 contract

Samples: Engineering, Procurement and Construction Agreement (Cheniere Energy Inc)