Common use of OWNER’S RESPONSIBILITIES Clause in Contracts

OWNER’S RESPONSIBILITIES. 3.1. The Owner shall designate in writing a project coordinator to act as OWNER' s representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s policies and decisions with respect to CONSULTANT' s services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANT. 3.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT to enter the Project site to perform the services to be provided by CONSULTANT under this Agreement; and (e) Provide notice to CONSULTANT of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT hereunder. 3.3. CONSULTANT acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANT, may be provided during times that are not the normal business hours of the CONSULTANT. 3.4. OWNER shall be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisition.

Appears in 5 contracts

Samples: Professional Services, Professional Services, Professional Services

AutoNDA by SimpleDocs

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by December 29, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 5 contracts

Samples: Construction Contract, Service Agreement, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s 's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANT. 3.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s 's requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s 's disposal all available information in the OWNER' S 'S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT to enter the Project site to perform the services to be provided by CONSULTANT under this Agreement; and (e) Provide notice to CONSULTANT of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT hereunder. 3.3. CONSULTANT acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANT, may be provided during times that are not the normal business hours of the CONSULTANT. 3.4. OWNER shall be responsible for the acquisition of all easements, property sites, rights-of-of- way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisition.

Appears in 4 contracts

Samples: Professional Services, Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2005. Based on the mutual agreement of both parties, this contract may be renewed a maximum of two one-year periods thereafter. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 4 contracts

Samples: Contractor Agreement, Services Agreement, Services Agreements

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30th, 2008, with the option of two one-year renewal periods. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 4 contracts

Samples: Services Agreement, Contractor Agreement, Service Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be completed by December 31, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 3 contracts

Samples: Contractor Agreement, Landscaping Services Agreement, Landscaping Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by December 30, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 3 contracts

Samples: Construction Contract, Professional Services, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 1, 2003. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 3 contracts

Samples: Construction Contract, Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by November 30, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 3 contracts

Samples: Construction Contract, Construction Contract, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by December 29, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 3 contracts

Samples: Construction Contract, Service Agreement, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2004. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 3 contracts

Samples: Professional Services, Professional Services, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by October 30, 2005. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 3 contracts

Samples: Construction Contract, Contractor Agreement, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 29, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 3 contracts

Samples: Contractor Agreement, Professional Services, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by April 15, 2004. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by March 15, 2003. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Landscaping Services Agreement, Landscaping Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by March 30, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be for a one year period commencing on or about November 18, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Contractor Agreement, Contract for Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall begin on October 1, 2004 and will expire September 30, 2007 with the option for two one-year renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Services Agreement, Services Agreements

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be for a one year period commencing on or about November 18, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Contract for Services, Contract for Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 28, 2005. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by December 6, 2002. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by August 15, 2002. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by June 30, 2004. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by July 16, 2004. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Contractor Agreement, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by June 19, 2005. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Architectural Services Agreement, Architectural Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be for a one-year period, commencing on or about January 18, 2006, with the City’s option to exercise two additional one-year renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Environmental Services Agreement, Environmental Remediation Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by April 1,2003. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be an annual contract with the option of two additional one-year renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 28, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Landscape Maintenance Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall commence on or about December 21, 2005 and be for eight years, with no renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed October 1, 2005. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2004, with the option of two additional one-year renewals based on the written consent of both parties. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Services Agreement, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by March 31, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 28, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Services Agreements

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by November 30, 2002. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 4th, 2008, with the option of two one-year renewal periods. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Services Agreement, Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be an annual agreement with the City’s option to renew for up to two additional one-year renewal periods. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Services Agreements, Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by April 15, 2004. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2004, and based upon mutual agreement of both parties, there is an option of two one-year renewals. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by December 6, 2002. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Contractor Agreement, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2004. Based on mutual consent of both parties, the contract may be extended for up to 2 one-year periods. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Tree Removal and Grinding Services Agreement, Tree Removal and Grinding Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by October 1, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Contractor Agreement, Landscaping Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Services Agreement, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Insurance Brokerage Agreement, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall begin on October 1, 2004 and will expire September 30, 2007 with the option for two one-year renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Services Agreement, Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by July 30, 2002. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be back on schedule. 4.1. The total compensation to be paid CONTRACTOR by the OWNER for all Basic Services shall be responsible an amount of $23,500. Payments by the OWNER will be made for services rendered by the acquisition CONTRACTOR, no more than on a monthly basis, within thirty (30) days of submittal of an approvable invoice. The number of the purchase order/contract by which authority the services have been made shall appear on all easementsinvoices. All invoices shall be reasonably substantiated, property sitesidentify the services rendered, rights-of-wayand must be submitted in triplicate in a form and manner required by OWNER. 5.1. CONTRACTOR will keep adequate records and supporting documentation which concern or reflect its services hereunder. The records and documentation will be retained by CONTRACTOR for a minimum of five (5) years from the date of termination of this Agreement or the date the Project is completed, whichever is later. OWNER, or other property rights required for any duly authorized agents or representatives of OWNER, shall have the Project right to audit, inspect and for copy all such records and documentation as often as they deem necessary during the costs thereofperiod of this Agreement and during the five (5) year period noted above; provided, however, such activity shall be conducted only during normal business hours. 6.1. The CONTRACTOR in consideration of $10.00, the sufficiency and receipt of which is acknowledged through the signing of this Agreement shall protect, defend, indemnify and hold OWNER and its officers, employees and agents harmless from and against any and all losses, penalties, damages, professional fees, including the attorney fees and all costs of litigation and judgments arising out of any required land surveys willful misconduct or negligent act, error or omission of the CONTRACTOR, its Subconsultants, Subcontractors, agents or employees, arising out of or incidental to the performance of this Agreement or work performed thereunder. The consideration exchanged and the provisions of this paragraph shall also pertain to any claims brought against the OWNER its officers, employees or agents by any employee of the named CONTRACTOR, or any Subconsultant or Subcontractor, or anyone directly or indirectly employed by any of them. The CONTRACTOR'S obligation under this paragraph shall not be limited in connection with such acquisitionany way by the agreed upon contract price as shown in this Agreement or the CONTRACTOR'S limit of, or lack of, sufficient insurance protection.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.43.1. Services to be rendered by CONTRACTOR shall commence June 19, 2002 upon written Notice to Proceed from OWNER shall be responsible for the acquisition all or any designated portion of all easements, property sites, rights-of-way, or other property rights required for the Project and for shall be performed and completed by June 18, 2005. 3.2. Should CONTRACTOR be obstructed or delayed in the costs thereofprosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the costs of any required land surveys OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock- outs, then CONTRACTOR shall notify OWNER in connection with such acquisition.writing within five

Appears in 2 contracts

Samples: Curbside Recycling Agreement, Curbside Recycling Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 30, 2006. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 31, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s Owner’s representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s Owner’s policies and decisions with respect to CONSULTANT' s Contractor’s services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by April 30, 2005. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of Contractor’s services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. Contractor’s sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the Contractor’s compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the Owner’s satisfaction that the Contractor’s performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Hazardous Materials Spill Cleanup Agreement, Hazardous Materials Spill Cleanup Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by August 14, 2002. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Contract Agreement, Contract Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 31, 2004. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Services Agreements

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 20, 2003. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by May 31, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 31, 2004. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by April 5, 2005. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 1, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2005, with the option of two one-year renewals. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Services Agreement, Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall commence on or about October 1, 2005 and run for twelve months, with the option for two one-year renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Tree Trimming Services Agreement, Tree Trimming Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to identify storm sewer projects to be completed pursuant to this Agreement, to notify the CONTRACTOR of services to be completed, to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s XXXXXXXXXX's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder;, (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Identify the specific storm sewer projects to be completed by CONTRACTOR pursuant to this Agreement and deliver notice of the same to the CONTRACTOR; (b) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ed) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be completed 30 days from notice to proceed. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Storm Sewer Repair & Maintenance Agreement, Storm Sewer Repair & Maintenance Agreement

AutoNDA by SimpleDocs

OWNER’S RESPONSIBILITIES. 3.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s 's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANT. 3.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s 's requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s 's disposal all available information in the OWNER' S 'S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT to enter the Project site to perform the services to be provided by CONSULTANT under this Agreement; and (e) Provide notice to CONSULTANT of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT hereunder. 3.3. CONSULTANT acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANT, may be provided during times that are not the normal business hours of the CONSULTANT. 3.4. OWNER shall be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisition.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by June 30, 2004. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by August 31, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by October 1, 2002. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by August 10, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2008, with the option for two one-year renewals. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2003. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Contractor Agreement, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2003. Based on the mutual agreement of both parties, the contract may be extended for up to two one-year periods. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Landscape Maintenance Agreement, Landscape Maintenance Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2002. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Service Agreement, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2004, with the option of two additional one-year renewals based on the written consent of both parties. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Services Agreements, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by December 31, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Contractor Agreement, Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 1, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Professional Services, Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by June 30, 2006 . Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 2 contracts

Samples: Construction Contract, Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by December 19, 2003. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Contract Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by May 2, 2008, with the option of two one-year renewals, based on the mutual agreement of both parties. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Service Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by November 17, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by May 15, 2008. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by January 30, 2004. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Landscaping Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by April 3, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. ARTICLE THREE TIME‌ 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by June 30, 2003. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible back on schedule. ARTICLE FOUR COMPENSATION‌ 4.1. The total compensation to be paid CONTRACTOR by the OWNER for all Basic Services in the acquisition of all easements, property sites, rights-amount of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisition.

Appears in 1 contract

Samples: Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by July 10, 2002. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall commence on or about August 17th, 2005 and run for a three year period. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 30, 2004, with the option of two one-year renewals. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by May 31, 2006. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner OWNER shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by September 6, 2002. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 1 month of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 1 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by June 29, 2007. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall commence on October 28, 2005 and be completed by December 7, 2005. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Landscaping Services Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by November 30, 2004. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Service Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be for a period of three years with the option of two (2) 1 year renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall commence on or about November 15, 2004 and run for twelve months, with the option for two one-year renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall begin on or about January 1st, 2008 and completed by February 28, 2009. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by June 3, 2005. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. ARTICLE THREE TIME‌ 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by July 30, 2003. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. XXXXXXXXXX's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Contract Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be for a one-year period, beginning on August 17, 2005 with the City’s option to renew for two additional one-year periods. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by March 31, 2004 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Contract Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be for (3) year period, as an on-call basis at no cost contract, expiring on December 31, 2009, with the City’s option of two (2) one-year renewals. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Contractor Agreement

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed by August 1, 2003. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Construction Contract

OWNER’S RESPONSIBILITIES. 3.12.1. The Owner shall designate in writing a project coordinator to act as OWNER' s 's representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Coordinator"). The Project Coordinator shall have authority to transmit instructions, receive information, interpret and define OWNER' s 's policies and decisions with respect to CONSULTANT' s CONTRACTOR's services for the Project. However, the Project Coordinator is not authorized to issue any verbal or written orders or instructions to the CONSULTANT CONTRACTOR that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT CONTRACTOR hereunder; (b) The time the CONSULTANT CONTRACTOR is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANTCONTRACTOR. 3.22.2. The Project Coordinator shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT CONTRACTOR for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER' s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT' s disposal all available information in the OWNER' S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to design or construction of the Project (d) Arrange for access to and make all provisions for CONSULTANT CONTRACTOR to enter the Project site to perform the services to be provided by CONSULTANT CONTRACTOR under this Agreement; and (ec) Provide notice to CONSULTANT CONTRACTOR of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT CONTRACTOR hereunder. 3.32.3. CONSULTANT CONTRACTOR acknowledges that access to the Project Site, to be arranged by OWNER for CONSULTANTCONTRACTOR, may be provided during times that are not the normal business hours of the CONSULTANTCONTRACTOR. 3.1. Services to be rendered by CONTRACTOR shall be commenced subsequent to the execution of this Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be for a three year agreement. Time is of the essence with respect to the performance of this Agreement. 3.2. Should CONTRACTOR be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONTRACTOR, and not due to its own fault or neglect, including but not restricted to acts of God or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONTRACTOR shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which CONTRACTOR may have had to request a time extension. 3.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONTRACTOR's services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole remedy against OWNER will be the right to seek an extension of time to its schedule. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of the CONTRACTOR, the services to be provided hereunder have not been completed within 18 months of the date hereof, the CONTRACTOR's compensation may be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONTRACTOR after expiration of said 18 month period. 3.4. Should the CONTRACTOR fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely and reasonable manner, in addition to any other rights or remedies available to the OWNER shall hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONTRACTOR until such time as the CONTRACTOR resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONTRACTOR's performance is or will shortly be responsible for the acquisition of all easements, property sites, rights-of-way, or other property rights required for the Project and for the costs thereof, including the costs of any required land surveys in connection with such acquisitionback on schedule.

Appears in 1 contract

Samples: Professional Services