Common use of Paved Roads Clause in Contracts

Paved Roads. Paved Lanes and Paved Walkways, including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms, and catch basin leads installed in paved road, paved lanes or paved walkways: Two (2) Winter Seasons, provided that: (a) the underground utilities have in the opinion of the Manager, Urban Development been installed and compacted in other than winter conditions; (b) if installed in winter conditions, the backfilling has been properly compacted with granular material; or (c) Final Acceptance Certificates for all underground utilities have been issued. (a) Gravelled Lanes, including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms installed in these lanes: One (1) year; (b) If the Developer fails to obtain the Final Acceptance Certificate for gravelled lanes prior to the onset of the second Winter Season for the installation of the Infrastructure located underground, the Developer shall reshape the lanes to design grades and slopes, gravel where considered necessary by the Manager, Urban Development, repair and adjust manholes, hydrants and all valves, cathodic protection test points, catch basins and catch basin leads provided that: (i) at least seventy five percent (75%) of the lots in the Development Area that are lane serviced all have the underground house services installed by the Developer, natural gas provider, telephone and cable services providers; and (ii) no single lane has less than fifty percent (50%) of the house services installed.

Appears in 3 contracts

Sources: Master Commercial Development Agreement, Master Residential Development Agreement, Master Industrial Development Agreement

Paved Roads. Paved Lanes and Paved Walkways, including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms, and catch basin leads installed in paved road, paved lanes or paved walkways: Two (2) Winter Seasons, provided that: (a) the underground utilities have in the opinion of the ManagerManaging Director, Urban Development Calgary Approvals Coordination been installed and compacted in other than winter conditions; (b) if installed in winter conditions, the backfilling has been properly compacted with granular material; or (c) Final Acceptance Certificates for all underground utilities have been issued. (a) Gravelled Lanes, including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms installed in these lanes: One (1) year; (b) If the Developer fails to obtain the Final Acceptance Certificate for gravelled lanes prior to the onset of the second Winter Season for the installation of the Infrastructure located underground, the Developer shall reshape the lanes to design grades and slopes, gravel where considered necessary by the ManagerManaging Director, Urban DevelopmentCalgary Approvals Coordination, repair and adjust manholes, hydrants and all valves, cathodic protection test points, catch basins and catch basin leads provided that: (i) at least seventy five percent (75%) of the lots in the Development Area that are lane serviced all have the underground house services installed by the Developer, natural gas provider, telephone and cable services providers; and (ii) no single lane has less than fifty percent (50%) of the house services installed.

Appears in 3 contracts

Sources: Master Development Agreement, Master Development Agreement, Master Development Agreement

Paved Roads. Paved Lanes and Paved Walkways, including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms, and catch basin leads installed in paved road, paved lanes or paved walkways: Two (2) Winter Seasons, provided that: (a) the underground utilities have in the opinion of the Manager, Urban Development Growth Management been installed and compacted in other than winter conditions; (b) if installed in winter conditions, the backfilling has been properly compacted with granular material; or (c) Final Acceptance Certificates for all underground utilities have been issued. (a) Gravelled Lanes, including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms installed in these lanes: One (1) year; (b) If the Developer fails to obtain the Final Acceptance Certificate for gravelled lanes prior to the onset of the second Winter Season for the installation of the Infrastructure located underground, the Developer shall reshape the lanes to design grades and slopes, gravel where considered necessary by the Manager, Urban DevelopmentGrowth Management, repair and adjust manholes, hydrants and all valves, cathodic protection test points, catch basins and catch basin leads provided that: (i) at least seventy five percent (75%) of the lots in the Development Area that are lane serviced all have the underground house services installed by the Developer, natural gas provider, telephone and cable services providers; and (ii) no single lane has less than fifty percent (50%) of the house services installed.

Appears in 1 contract

Sources: Master Development Agreement

Paved Roads. Paved Lanes and Paved Walkways, including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms, and catch basin leads installed in paved road, paved lanes or paved walkways: Two (2) Winter Seasons, provided that: (a) the underground utilities have in the opinion of the ManagerDirector, Urban Development Calgary Approvals Coordination been installed and compacted in other than winter conditions; (b) if installed in winter conditions, the backfilling has been properly compacted with granular material; or (c) Final Acceptance Certificates for all underground utilities have been issued. (a) Gravelled Lanes, including but not limited to manhole frames and covers, water main and hydrant valves and valve operating mechanisms, cathodic protection test points, water service connection valves and valve operating mechanisms installed in these lanes: One (1) year; (b) If the Developer fails to obtain the Final Acceptance Certificate for gravelled lanes prior to the onset of the second Winter Season for the installation of the Infrastructure located underground, the Developer shall reshape the lanes to design grades and slopes, gravel where considered necessary by the ManagerDirector, Urban DevelopmentCalgary Approvals Coordination, repair and adjust manholes, hydrants and all valves, cathodic protection test points, catch basins and catch basin leads provided that: (i) at least seventy five percent (75%) of the lots in the Development Area that are lane serviced all have the underground house services installed by the Developer, natural gas provider, telephone and cable services providers; and (ii) no single lane has less than fifty percent (50%) of the house services installed.

Appears in 1 contract

Sources: Development Agreement