Payload Length Sample Clauses

Payload Length. Specifies the number of bytes in the Payload Data array. The value of this field must not be 0. The Payload Length field can be coded using either a BYTE, a WORD, or a DWORD. This is specified by the value of the Payload Length Type field. For content created according to this specification, this field is coded using a WORD. Payload Data Specifies an array containing the actual data for the payload.
AutoNDA by SimpleDocs
Payload Length. The maximum length of the payload in the Space Shuttle cargo bay at any time during launch, landing, operations, deploy- ment, servicing or retrieval. It includes any clearance length necessary for items such as dynamic envelope con- siderations, deployment, retrieval, servicing and use of the remote manip- ulator system.

Related to Payload Length

  • Firm Point-To-Point Transmission Service “Non-Firm Point-To-Point Transmission Service” shall mean Point-To-Point Transmission Service under the Tariff that is reserved and scheduled on an as-available basis and is subject to Curtailment or Interruption as set forth in Tariff, Part II, section 14.7. Non-Firm Point-To-Point Transmission Service is available on a stand-alone basis for periods ranging from one hour to one month. Non-Firm Sale:

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Fixed Kilowatt-Hour Rate Product If Clearview Energy would like to propose a change to a fixed kilowatt-hour rate product, you will be notified by the process described in Change of Terms. Fixed price products may change due to new or modified federal, state or local laws; or regulatory actions that impose new or modified fees. 2b. Month-to-month Variable Kilowatt-Hour Rate Product – Month-to-month variable kilowatt-hour rate products are subject to change without notice at Clearview Energy’s discretion outside of any applicable promotion. If applicable, the Monthly Base Charge may also fluctuate outside of any applicable promotion. After the first month, the price may vary based on a number of factors, including market supply prices, energy capacity prices, settlement costs and other market- related factors, as determined at our discretion, plus estimated total state taxes, fees, charges or other assessments, along with our costs, expenses and profit margins. There is no limit on how much the price may change from one billing cycle to the next. The price can change each billing period. The Customer will not know the price until receiving the bill. A customer may obtain the previous 24 months’ average monthly billed price for the customer’s rate class and service territory at 1.800.746.4702 and xxx.xxxxxxxxxxxxxxx.xxx. Historical pricing is not indicative of present or future pricing. All pricing can be viewed at xxx.XxxxxxxxxXxxxxx.xxx.

  • NYISO and Connecting Transmission Owner Obligations Connecting Transmission Owner and NYISO shall cause the New York State Transmission System and the Connecting Transmission Owner’s Attachment Facilities to be operated, maintained and controlled in a safe and reliable manner in accordance with this Agreement and the NYISO Tariffs. Connecting Transmission Owner and NYISO may provide operating instructions to Developer consistent with this Agreement, NYISO procedures and Connecting Transmission Owner’s operating protocols and procedures as they may change from time to time. Connecting Transmission Owner and NYISO will consider changes to their respective operating protocols and procedures proposed by Developer.

  • Preceptor Differential The Hospital shall pay a differential of $1.50 per hour to a nurse who is designated by nursing management to serve as a preceptor to provide on-the-job training to newly hired nurses. One differential will be paid per shift per orientee to the primary preceptor for all hours served as the primary preceptor for that shift. Preceptor will only be paid while the newly hired nurse is in a one-to-one status. Preceptor is a voluntary assignment and the nurse has the option to refuse the preceptor assignment.

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Fixed Kilowatt Rate Product If Clearview Energy would like to propose a change to a fixed kilowatt rate product, you will be notified by the process described in Change of Terms. Fixed price products may change due to new or modified federal, state or local laws; or regulatory actions that impose new or modified fees. 2b. Month-to-month Variable Kilowatt Rate Product – Month-to-month variable kilowatt rate products are subject to change without notice at Clearview Energy’s discretion outside of any applicable promotion. If applicable, the Monthly Base Charge may also fluctuate outside of any applicable promotion. All pricing can be viewed at xxx.XxxxxxxxxXxxxxx.xxx.

  • Developer and Connecting Transmission Owner Notice Developer and Connecting Transmission Owner shall each notify the other Party, first orally and then in writing, of the release of any Hazardous Substances, any asbestos or lead abatement activities, or any type of remediation activities related to the Large Generating Facility or the Attachment Facilities, each of which may reasonably be expected to affect the other Party. The notifying Party shall: (i) provide the notice as soon as practicable, provided such Party makes a good faith effort to provide the notice no later than twenty-four hours after such Party becomes aware of the occurrence; and (ii) promptly furnish to the other Party copies of any publicly available reports filed with any Governmental Authorities addressing such events.

  • Modified Indemnity Where Agreement Involves Design Professional Services Notwithstanding the forgoing, if the services provided under this Agreement are design professional services, as defined by California Civil Code section 2782.8, as may be amended from time to time, the defense and indemnity obligation under Section 1, above, shall be limited to the extent required by California Civil Code section 2782.8.

Time is Money Join Law Insider Premium to draft better contracts faster.