PERFORMANCE GUARANTEES AND ACCEPTANCE TESTS Sample Clauses

PERFORMANCE GUARANTEES AND ACCEPTANCE TESTS. 9.1 Standard Pre-Shipment Factory Inspection and Testing Procedures
AutoNDA by SimpleDocs
PERFORMANCE GUARANTEES AND ACCEPTANCE TESTS. 9.1 Standard Pre-Shipment Factory Inspection Procedures for DFC Components

Related to PERFORMANCE GUARANTEES AND ACCEPTANCE TESTS

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Attachment  C_ CONTRACT AFFIRMATIONS For purposes of these Contract Affirmations, HHS includes both the Health and Human Services Commission (HHSC) and the Department of State Health Services (DSHS). System Agency refers to HHSC, DSHS, or both, that will be a party to this Contract. These Contract Affirmations apply to all Contractors and Grantees (referred to as “Contractor”) regardless of their business form (e.g., individual, partnership, corporation). By entering into this Contract, Contractor affirms, without exception, understands, and agrees to comply with the following items through the life of the Contract:

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Authorization Required Prior to Parallel Operation 2.2.1 The NYISO, in consultation with the Connecting Transmission Owner, shall use Reasonable Efforts to list applicable parallel Operating Requirements in Attachment 5 of this Agreement. Additionally, the NYISO, in consultation with the Connecting Transmission Owner, shall notify the Interconnection Customer of any changes to these requirements as soon as they are known. The NYISO and Connecting Transmission Owner shall make Reasonable Efforts to cooperate with the Interconnection Customer in meeting requirements necessary for the Interconnection Customer to commence parallel operations by the in-service date. 2.2.2 The Interconnection Customer shall not operate its Small Generating Facility in parallel with the New York State Transmission System or the Distribution System without prior written authorization of the NYISO. The NYISO, in consultation with the Connecting Transmission Owner, will provide such authorization once the NYISO receives notification that the Interconnection Customer has complied with all applicable parallel Operating Requirements. Such authorization shall not be unreasonably withheld, conditioned, or delayed.

  • Goals and Objectives of the Agreement Agreement Goals The goals of this Agreement are to: ● Reduce wildfire risk related to the tree mortality crisis; ● Provide a financial model for funding and scaling proactive forestry management and wildfire remediation; ● Produce renewable bioenergy to spur uptake of tariffs in support of Senate Bill 1122 Bio Market Agreement Tariff (BioMat) for renewable bioenergy projects, and to meet California’s other statutory energy goals; ● Create clean energy jobs throughout the state; ● Reduce energy costs by generating cheap net-metered energy; ● Accelerate the deployment of distributed biomass gasification in California; and ● Mitigate climate change through the avoidance of conventional energy generation and the sequestration of fixed carbon from biomass waste. Ratepayer Benefits:2 This Agreement will result in the ratepayer benefits of greater electricity reliability, lower costs, and increased safety by creating a strong market demand for forestry biomass waste and generating cheap energy. This demand will increase safety by creating an economic driver to support forest thinning, thus reducing the risk of catastrophic wildfire and the associated damage to investor-owned utility (IOU) infrastructure, such as transmission lines and remote substations. Preventing this damage to or destruction of ratepayer-supported infrastructure lowers costs for ratepayers. Additionally, the ability of IOUs to use a higher- capacity Powertainer provides a much larger offset against the yearly billion-dollar vegetation management costs borne by IOUs (and hence by ratepayers). The PT+’s significant increase in waste processing capacity also significantly speeds up and improves the economics of wildfire risk reduction, magnifying the benefits listed above. The PT+ will directly increase PG&E’s grid reliability by reducing peak loading by up to 250 kilowatt (kW), and has the potential to increase grid reliability significantly when deployed at scale. The technology will provide on-demand, non- weather dependent, renewable energy. The uniquely flexible nature of this energy will offer grid managers new tools to enhance grid stability and reliability. The technology can be used to provide local capacity in hard-to-serve areas, while reducing peak demand. Technological Advancement and Breakthroughs:3 This Agreement will lead to technological advancement and breakthroughs to overcome barriers to the achievement of California’s statutory energy goals by substantially reducing the LCOE of distributed gasification, helping drive uptake of the undersubscribed BioMAT program and increasing the potential for mass commercial deployment of distributed biomass gasification technology, particularly through net energy metering. This breakthrough will help California achieve its goal of developing bioenergy markets (Bioenergy Action Plan 2012) and fulfil its ambitious renewable portfolio standard (SB X1-2, 2011-2012; SB350, 2015). The PT+ will also help overcome barriers to achieving California’s greenhouse gas (GHG) emissions reduction (AB 32, 2006) and air quality improvement goals. It reduces greenhouse gas and criteria pollutants over three primary pathways: 1) The PT+’s increased capacity and Combined Heat and Power (CHP) module expand the displacement of emissions from conventional generation; 2) the biochar offtake enables the sequestration of hundreds of tons carbon that would otherwise have been released into the atmosphere; and 3) its increased processing capacity avoids GHG and criteria emissions by reducing the risk of GHG emissions from wildfire and other forms of disposal, such as open pile burning or decomposition. The carbon sequestration potential of the biochar offtake is particularly groundbreaking because very few technologies exist that can essentially sequester atmospheric carbon, which is what the PT+ enables when paired with the natural forest ecosystem––an innovative and groundbreaking bio-energy technology, with carbon capture and storage. Additionally, as noted in the Governor’s Clean Energy Jobs Plan (2011), clean energy jobs are a critical component of 2 California Public Resources Code, Section 25711.5(a) requires projects funded by the Electric Program Investment Charge (EPIC) to result in ratepayer benefits. The California Public Utilities Commission, which established the EPIC in 2011, defines ratepayer benefits as greater reliability, lower costs, and increased safety (See CPUC “Phase 2” Decision 00-00-000 at page 19, May 24, 2012, xxxx://xxxx.xxxx.xx.xxx/PublishedDocs/WORD_PDF/FINAL_DECISION/167664.PDF). 3 California Public Resources Code, Section 25711.5(a) also requires EPIC-funded projects to lead to technological advancement and breakthroughs to overcome barriers that prevent the achievement of the state’s statutory and energy goals. California’s energy goals. When deployed at scale, the PT+ will result in the creation of thousands of jobs across multiple sectors, including manufacturing, feedstock supply chain (harvesting, processing, and transportation), equipment operation, construction, and project development. ● Annual electricity and thermal savings; ● Expansion of forestry waste markets; ● Expansion/development of an agricultural biochar market; ● Peak load reduction; ● Flexible generation; ● Energy cost reductions; ● Reduced wildfire risk; ● Local air quality benefits; ● Water use reductions (through energy savings); and ● Watershed benefits.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.