Common use of Permits, Plans, and Specifications Clause in Contracts

Permits, Plans, and Specifications. A. Prior to commencing any work within the Franchise Area on any county road or right-of-way, the Grantee shall comply with and obtain all necessary permits to do such work. Permits required may include, but are not limited to, Right-of-Way Use Permits, Approach Permits, Conditional Use Permits, Haul Road Permits and/or any other County, State or Federal Permit required. Refer to the Garfield County Utility Accommodation Policy, Comprehensive Plan and other County Development Regulations for necessary county permitting. Right-of-Way Use permits will require, at a minimum, plans and specifications in duplicate showing: the position, depth, and location of Facilities to be constructed within the Franchise Area at that time and their positions in relation to any involved county road and their locations within the right-of-way. These plans, all drawn to scale, shall be known as the “map of definite location”. Specifications will include class and type of materials and equipment to be used, manner of excavation, construction, installation, and backfill; location of temporary and permanent structures to be erected; description of road facilities which will be disturbed and plans for their restoration; traffic controls; traffic turnouts and detours; road obstructions; and such other details as are required by the County Engineer. To the extent that work is permitted under a then-existing permit issued by the County in connection with the detailed plans and specifications stated above are not required. Grantee shall pay all costs and expenses incurred by the County in reviewing plans and specifications, as and to the extent required by applicable provisions of the Garfield County Utility Accommodation Policy.

Appears in 2 contracts

Samples: Franchise Agreement, Franchise Agreement

AutoNDA by SimpleDocs

Permits, Plans, and Specifications. A. Prior to commencing any work within the Franchise Area on any county public road or right-of-wayright-‐ of-‐way, the Grantee shall comply with and obtain all necessary permits to do such work. Permits required may include, but are not limited to, Right-of-Way Use Permitsright-‐of-‐way, Approach Permitsspecial use permits, Conditional Use Permitsapproach permits, Haul Road Permits conditional use permits, extended transportation permits, special load move/haul road permits and/or any other County, State or Federal Permit permits required. Refer to the Garfield Ogemaw County Utility Accommodation Policy, Road Commission permits. Comprehensive Plan and other County Development Regulations county development regulations for necessary county permitting. Right-of-Way Consent to Use roads and right-‐of-‐way use permits in Xxxxxxx Township will require, at a minimum, plans and specifications in duplicate showing: the position, depth, and location of Facilities to be constructed within the Franchise Area at that time and their positions in relation to any involved county road and their locations within the right-of-wayright-‐of-‐way. These plans, all drawn to scale, shall be known as the “map of definite location”. Specifications will include class and type of materials and equipment to be used, manner of excavation, construction, installation, and backfill; location of temporary and permanent structures to be erected; description of road facilities which will be disturbed and plans for their restoration; traffic controls; traffic turnouts and detours; road obstructions; and such other details as are required by the County EngineerZoning Administrator. To the extent that work is permitted under a then-existing then-‐existing permit issued by the County Township in connection with the detailed plans and specifications stated above are not required. Grantee shall pay all costs and expenses incurred by the County Township in reviewing plans and specifications, as and to the extent required by applicable provisions of the Garfield Ogemaw County Utility Accommodation PolicyRoad Commission and its policies and permits.

Appears in 1 contract

Samples: Franchise Agreement

AutoNDA by SimpleDocs

Permits, Plans, and Specifications. A. Prior to commencing any work within the Franchise Area on any county road or right-of-way, the Grantee shall comply with and obtain all necessary permits to do such work. Permits required may include, but are not limited to, Right-of-Way Use Permits, Approach Permits, Conditional Use Permits, Haul Road Permits and/or any other County, State or Federal Permit required. Refer to the Garfield County Utility Accommodation Policy, Comprehensive Plan and other County Development Regulations for necessary county permitting. Right-of-Way Use permits will require, at a minimum, plans and specifications in duplicate showing: the position, depth, and location of Facilities to be constructed within the Franchise Area at that time and their positions in relation to any involved county road and their locations within the right-of-way. These plans, all drawn to scale, shall be known as the “map of definite location”. Specifications will include class and type of materials and equipment to be used, manner of excavation, construction, installation, and backfill; location of temporary and permanent structures to be erected; description of road facilities which will be disturbed and plans for their restoration; traffic controls; traffic turnouts and detours; road obstructions; and such other details as are required by the County Engineer. To the extent that work is permitted under a then-existing permit issued by the County in connection with the detailed plans and specifications stated above are not required. Grantee shall pay all costs and expenses incurred by the County in reviewing plans and specifications, as and to the extent required by applicable provisions of the Garfield County Utility Accommodation Policy.

Appears in 1 contract

Samples: Franchise Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.