PERFORMANCE OBJECTIVES 4.1 The Performance Plan (Annexure A) sets out- 4.1.1 the performance objectives and targets that must be met by the Employee; and 4.1.2 the time frames within which those performance objectives and targets must be met. 4.2 The performance objectives and targets reflected in Annexure A are set by the Employer in consultation with the Employee and based on the Integrated Development Plan, Service Delivery and Budget Implementation Plan (SDBIP) and the Budget of the Employer, and shall include key objectives; key performance indicators; target dates and weightings. 4.2.1 The key objectives describe the main tasks that need to be done. 4.2.2 The key performance indicators provide the details of the evidence that must be provided to show that a key objective has been achieved. 4.2.3 The target dates describe the timeframe in which the work must be achieved. 4.2.4 The weightings show the relative importance of the key objectives to each other. 4.3 The Employee’s performance will, in addition, be measured in terms of contributions to the goals and strategies set out in the Employer’s Integrated Development Plan.
Award Criteria 40.1 The Procuring Entity shall award the Contract to the successful tenderer whose tender has been determined to be the Lowest Evaluated Tender in accordance with procedures in Section 3: Evaluation and Qualification Criteria.
Performance Measure Grantee will adhere to the performance measures requirements documented in
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.