Common use of Phasor Measurement Units Clause in Contracts

Phasor Measurement Units. ‌ A Interconnection Customer shall cause KIAC to install and maintain, at its expense, phasor measurement units (“PMUs”) if it meets the following criteria: (1) completed a Class Year after Class Year 2017; and (2) proposes a new Large Facility that either (a) has a maximum net output equal to or greater than 100 MW or (b) requires, as Attachment Facilities or System Upgrade Facilities, a new substation of 230kV or above. PMUs shall be installed on the Large Facility on the low side of the generator step-up transformer, unless it is a non-synchronous generation facility, in which case the PMUs shall be installed on the Interconnection Customer side of the Point of Interconnection. The PMUs must be capable of performing phasor measurements at a minimum of 60 samples per second which are synchronized via a high-accuracy satellite clock. To the extent Interconnection Customer installs similar quality equipment, such as relays or digital fault recorders, that can collect data at least at the same rate as PMUs and which data is synchronized via a high-accuracy satellite clock, such equipment would satisfy this requirement. Interconnection Customer shall cause KIAC to install and maintain, at its expense, PMU equipment which includes the communication circuit capable of carrying the PMU data to a local data concentrator, and then transporting the information continuously to the Connecting Transmission Owner and the NYISO; as well as store the PMU data locally for thirty days. Interconnection Customer shall cause KIAC to provide to Connecting Transmission Owner and the NYISO all necessary and requested information through the Connecting Transmission Owner’s and the NYISO’s synchrophasor system, including the following: (a) xxxxx XX and MVAR measured at the Interconnection Customer side of the generator step-up transformer (or, for a non-synchronous generation facility, to be measured at the Interconnection Customer side of the Point of Interconnection); (b) generator terminal voltage and current magnitudes and angles; (c) generator terminal frequency and frequency rate of change; and (d) generator field voltage and current, where available; and (e) breaker status, if available. The Connecting Transmission Owner will provide for the ongoing support and maintenance of the network communications linking the data concentrator to the Connecting Transmission Owner and the NYISO, consistent with ISO Procedures detailing the obligations related to SCADA data.

Appears in 4 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Phasor Measurement Units. ‌ A Interconnection Customer Con Edison shall cause KIAC to install and maintain, at its expense, phasor measurement units (“PMUs”) if it meets the following criteria: (1) completed a Class Year after Class Year 2017; and (2) proposes a new Large Facility that either (a) has a maximum net output equal to or greater than 100 MW or (b) requires, as Attachment Facilities or System Upgrade Facilities, a new substation of 230kV or above. PMUs shall be installed on the Large Facility on the low side of the generator step-up transformer, unless it is a non-synchronous generation facility, in which case the PMUs shall be installed on the Interconnection Customer Con Edison side of the Point of Interconnection. The PMUs must be capable of performing phasor measurements at a minimum of 60 samples per second which are synchronized via a high-accuracy satellite clock. To the extent Interconnection Customer Con Edison installs similar quality equipment, such as relays or digital fault recorders, that can collect data at least at the SERVICE AGREEMENT NO. 2520 same rate as PMUs and which data is synchronized via a high-accuracy satellite clock, such equipment would satisfy this requirement. Interconnection Customer Con Edison shall cause KIAC be required to install and maintain, at its expense, PMU equipment which includes the communication circuit capable of carrying the PMU data to a local data concentrator, and then transporting the information continuously to the Connecting Transmission Owner and the NYISO; as well as store the PMU data locally for thirty days. Interconnection Customer Con Edison shall cause KIAC to provide to Connecting Transmission Owner and the NYISO all necessary and requested information through the Connecting Transmission OwnerCon Edison’s and the NYISO’s synchrophasor system, including the following: (a) xxxxx XX and MVAR measured at the Interconnection Customer Large Generating Facility side of the generator step-up transformer (or, for a non-synchronous generation facility, to be measured at the Interconnection Customer Large Generating Facility side of the Point of Interconnection); (b) generator terminal voltage and current magnitudes and angles; (c) generator terminal frequency and frequency rate of change; and (d) generator field voltage and current, where available; and (e) breaker status, if available. The Connecting Transmission Owner Con Edison will provide for the ongoing support and maintenance of the network communications linking the data concentrator to the Connecting Transmission Owner and the NYISO, consistent with ISO Procedures detailing the obligations related to SCADA data.

Appears in 3 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Phasor Measurement Units. A Interconnection Customer Developer or the Connecting Transmission Owner shall cause KIAC to install and maintaininstall, at its Developer’s expense, a phasor measurement units unit (“PMUsPMU”) if it the Developer meets the following criteria: (1) completed a Class Year after Class Year 2017; and (2) proposes a new Large Facility that either either (a) has a maximum net output equal to or greater than 100 MW or (b) requires, as Attachment Facilities or System Upgrade Facilities, a new substation of 230kV or above. PMUs The PMU shall be installed on the Large Facility on the low side of the generator step-up transformer, unless it is a non-synchronous generation facility, in which case the PMUs shall be installed on the Interconnection Customer high side of the Point of Interconnection. The PMUs PMU must be capable of performing phasor measurements at a minimum of 60 samples per second which are synchronized via a high-accuracy satellite clock. To the extent Interconnection Customer Developer or Connecting Transmission Owner installs similar quality equipment, such as relays or digital fault recorders, that can collect data at least at the same rate as PMUs and which data is synchronized via a high-accuracy satellite clock, such equipment would satisfy this requirement. Interconnection Customer Developer or Connecting Transmission Owner shall cause KIAC be required to install and maintaininstall, at its Developer’s expense, PMU equipment equipment, which includes the communication circuit capable of carrying the PMU data to a local data concentrator, and then transporting the information continuously to the Connecting Transmission Owner’s data concentrator. Connecting Transmission Owner and the NYISO; as well as will store the PMU data locally for thirty days. Interconnection Customer The Developer’s and Connecting Transmission Owner’s responsibilities concerning the PMU and PMU equipment shall cause KIAC be set forth in Appendix A to provide to this Agreement. Connecting Transmission Owner and shall provide the NYISO all necessary and requested information through the Connecting Transmission Owner’s its and the NYISO’s synchrophasor system, including the following: (a) xxxxx XX and MVAR measured at the Interconnection Customer side of the generator step-up transformer (or, for a non-synchronous generation facility, to be measured at the Interconnection Customer high side of the Point of Interconnection); (b) generator terminal voltage and current magnitudes and anglesangles at the high side of the Point of Interconnection; (c) generator terminal frequency and frequency rate of changechange at the high side of the Point of Interconnection; and (d) generator field voltage and current, where available; and (e) breaker status, if available. The Connecting Transmission Owner will provide for the ongoing support and maintenance of the network communications linking the its data concentrator to the Connecting Transmission Owner and the NYISO, consistent with ISO Procedures detailing the obligations related to SCADA data.

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Phasor Measurement Units. ‌ A Interconnection Customer Con Edison shall cause KIAC to install and maintain, at its expense, phasor measurement units (“PMUs”) if it meets the following criteria: (1) completed a Class Year after Class Year 2017; and (2) proposes a new Large Facility that either (a) has a maximum net output equal to or greater than 100 MW or (b) requires, as Attachment Facilities or System Upgrade Facilities, a new substation of 230kV or above. PMUs shall be installed on the Large Facility on the low side of the generator step-up transformer, unless it is a non-synchronous generation facility, in which case the PMUs shall be installed on the Interconnection Customer Con Edison side of the Point of Interconnection. The PMUs must be capable of performing phasor measurements at a minimum of 60 samples per second which are synchronized via a high-accuracy satellite clock. To the extent Interconnection Customer Con Edison installs similar quality equipment, such as relays or digital fault recorders, that can collect data at least at the 22 SERVICE AGREEMENT NO. 2521 same rate as PMUs and which data is synchronized via a high-accuracy satellite clock, such equipment would satisfy this requirement. Interconnection Customer Con Edison shall cause KIAC be required to install and maintain, at its expense, PMU equipment which includes the communication circuit capable of carrying the PMU data to a local data concentrator, and then transporting the information continuously to the Connecting Transmission Owner and the NYISO; as well as store the PMU data locally for thirty days. Interconnection Customer Con Edison shall cause KIAC to provide to Connecting Transmission Owner and the NYISO all necessary and requested information through the Connecting Transmission OwnerCon Edison’s and the NYISO’s synchrophasor system, including the following: (a) xxxxx XX and MVAR measured at the Interconnection Customer Large Generating Facility side of the generator step-up transformer (or, for a non-synchronous generation facility, to be measured at the Interconnection Customer Large Generating Facility side of the Point of Interconnection); (b) generator terminal voltage and current magnitudes and angles; (c) generator terminal frequency and frequency rate of change; and (d) generator field voltage and current, where available; and (e) breaker status, if available. The Connecting Transmission Owner Con Edison will provide for the ongoing support and maintenance of the network communications linking the data concentrator to the Connecting Transmission Owner and the NYISO, consistent with ISO Procedures detailing the obligations related to SCADA data.

Appears in 1 contract

Samples: Interconnection Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!