Placement and Compaction. The base course shall be placed to the depths indicated on the drawings and/or as specified by the Engineer or his/her representatives. The gravel shall be placed in a maximum of 6-inch lifts and shall be thoroughly compacted to not less than 95% of the maximum dry density.
Appears in 2 contracts
Samples: Contract DPW 24 19, Construction Contract
Placement and Compaction. The base course shall be placed to the depths indicated on the drawings and/or as specified by the Engineer or his/her his representatives. The gravel shall be placed in a maximum of 6-inch lifts and shall be thoroughly compacted to not less than 95% of the maximum dry density.
Appears in 1 contract
Samples: Construction Contract
Placement and Compaction. The base course shall be placed to the depths indicated on the drawings and/or as specified by the Engineer or his/her his representatives. The gravel shall be placed in a maximum of 64-inch lifts and shall be thoroughly compacted to not less than 95% of the maximum dry density.
Appears in 1 contract
Samples: Contract DPW 18 15