Common use of Plans Submission Clause in Contracts

Plans Submission. Two (2) blackline drawings and one (1) CAD disk (subject to Xxxxxx’s architect’s and its consultants’ and subconsultants’ reasonable conditions for re-use) showing all architectural, mechanical and electrical systems, including cutsheets (where reasonably requested by Landlord), specifications and the following: CONSTRUCTION PLANS: (1) All partitions shall be shown; indicate ratings of all partitions; indicate all non-standard construction and details referenced; (2) Dimensions for partition shall be shown to face of dry wall; critical tolerances and ± dimensions shall be clearly noted; (3) All plumbing fixtures or other equipment requirements and any equipment requiring connection to Building plumbing systems shall be noted. REFLECTED CEILING PLAN: (1) Layout suspended ceiling grid pattern in each room, describing the intent of the ceiling working point, origin and/or centering; and (2) Locate all ceiling-mounted lighting fixtures and air handling devices including air dampers, fan boxes, etc., lighting fixtures, supply air diffusers, wall switches, down lights, special lighting fixtures, special return air registers, special supply air diffusers, and special wall switches. TELECOMMUNICATIONS AND ELECTRICAL EQUIPMENT PLAN: (1) All telephone outlets required; (2) All electrical outlets required;, note non-standard power devices and/or related equipment; (3) All electrical requirements associated with plumbing fixtures or equipment; append product data for all equipment requiring special power, temperature control or plumbing considerations; (4) Location of telecommunications equipment and general layout of conduits; and (5) Components and design of antennas, if any, (including associated equipment) as installed, in sufficient detail to evaluate weight, bearing requirements, wind-load characteristics, power requirements and the effects on Building structure, moisture resistance of the roof membrane and operations of pre-existing telecommunications equipment, to the extent known or based on information provided by Landlord. DOOR SCHEDULE: (1) Provide a schedule of doors, sizes, finishes, hardware sets and ratings; and (2) Non-standard materials and/or installation shall be explicitly noted. HVAC: (1) Areas requiring special temperature and/or humidity control requirements; (2) Heat emission of equipment (including catalogue cuts where reasonably required by Landlord or, where unavailable, based on engineer’s assumptions therefor), such as CRTs, copy machines, etc.; (3) Special exhaust requirements for conference rooms, pantry, toilets, etc.; and (4) Any extension of system beyond demised space. ELECTRICAL: (1) Special lighting requirements; (2) Power requirements and special outlet requirements of equipment; (3) Security requirements; (4) Supplied telephone equipment and the necessary space allocation for same; (5) Any extensions of tenant equipment beyond demised space; and (6) Load study confirming compliance with the leased space’s allowable xxxxx per square foot. PLUMBING: (1) Remote toilets; (2) Pantry equipment requirements; (3) Remote water and/or drain requirements such as for sinks, ice makers, etc.; and (4) Special drainage requirements, such as those requiring holding or dilution tanks. ROOF: Detailed plan of any existing and proposed roof equipment, if any, showing location and elevations of all equipment.

Appears in 2 contracts

Samples: Office Lease Agreement (Klaviyo, Inc.), Office Lease Agreement (Klaviyo, Inc.)

AutoNDA by SimpleDocs

Plans Submission. Two (2) blackline drawings and one (1) CAD disk (subject to XxxxxxTenant’s architect’s and its consultants’ and subconsultants’ reasonable conditions for re-use) showing all architectural, mechanical and electrical systems, including cutsheets (where reasonably requested by Landlord), specifications and the following: CONSTRUCTION PLANS: (1) All partitions shall be shown; indicate ratings of all partitions; indicate all non-standard construction and details referenced; (2) Dimensions for partition shall be shown to face of dry walldrywall; critical tolerances and ± dimensions shall be clearly noted; (3) All plumbing fixtures or other equipment requirements and any equipment requiring connection to Building plumbing systems shall be noted. REFLECTED CEILING PLAN: (1) Layout suspended ceiling grid pattern in each room, describing the intent of the ceiling working point, origin and/or centering; and (2) Locate all ceiling-mounted lighting fixtures and air handling devices including air dampers, fan boxes, etc., lighting fixtures, supply air diffusers, wall switches, down lights, special lighting fixtures, special return air registers, special supply air diffusers, and special wall switches. TELECOMMUNICATIONS AND ELECTRICAL EQUIPMENT PLAN: (1) All telephone outlets required; (2) All electrical outlets required;, ; note non-standard power devices and/or related equipment; (3) All electrical requirements associated with plumbing fixtures or equipment; append product data for all equipment requiring special power, temperature control or plumbing considerations; (4) Location of telecommunications equipment and general layout of conduits; and (5) Components and design of antennas, if any, (including associated equipment) as installed, in sufficient detail to evaluate weight, bearing requirements, wind-load characteristics, power requirements and the effects on Building structure, moisture resistance of the roof membrane and operations of pre-existing telecommunications equipment, to the extent known or based on information provided by Landlord. DOOR SCHEDULE: (1) Provide a schedule of doors, sizes, finishes, hardware sets and ratings; and (2) Non-standard materials and/or installation shall be explicitly noted. HVAC: (1) Areas requiring special temperature and/or humidity control requirements; (2) Heat emission of equipment (including catalogue cuts where reasonably required by Landlord or, where unavailable, based on engineer’s assumptions therefor), such as CRTs, copy machines, etc.; (3) Special exhaust requirements for conference rooms, pantry, toilets, etc.; and (4) Any extension of system beyond demised space. ELECTRICAL: (1) Special lighting requirements; (2) Power requirements and special outlet requirements of equipment; (3) Security requirements; (4) Supplied telephone equipment and the necessary space allocation for same; (5) Any extensions of tenant equipment beyond demised space; and (6) Load study confirming compliance with the leased space’s allowable xxxxx per square foot. PLUMBING: (1) Remote toilets; (2) Pantry equipment requirements; (3) Remote water and/or drain requirements such as for sinks, ice makers, etc.; and (4) Special drainage requirements, such as those requiring holding or dilution tanks. ROOF: Detailed plan of any existing and proposed roof equipment, if any, showing location and elevations of all equipment.

Appears in 1 contract

Samples: Lease (Akouos, Inc.)

AutoNDA by SimpleDocs

Plans Submission. Two (2) blackline drawings and one (1) CAD disk (subject to XxxxxxTenant’s architect’s and its consultants’ and subconsultants’ reasonable conditions for re-use) showing all architectural, mechanical and electrical systems, including cutsheets (where reasonably requested by Landlord), specifications and the following: CONSTRUCTION PLANS: (1) All partitions shall be shown; indicate ratings of all partitions; indicate all non-non- standard construction and details referenced; (2) Dimensions for partition shall be shown to face of dry walldrywall; critical tolerances and ± dimensions shall be clearly noted; (3) All plumbing fixtures or other equipment requirements and any equipment requiring connection to Building plumbing systems shall be noted. REFLECTED CEILING PLAN: (1) Layout suspended ceiling grid pattern in each room, describing the intent of the ceiling working point, origin and/or centering; and (2) Locate all ceiling-mounted lighting fixtures and air handling devices including air dampers, fan boxes, etc., lighting fixtures, supply air diffusers, wall switches, down lights, special lighting fixtures, special return air registers, special supply air diffusers, and special wall switches. TELECOMMUNICATIONS AND ELECTRICAL EQUIPMENT PLAN: (1) All telephone outlets required; (2) All electrical outlets required;, ; note non-standard power devices and/or related equipment; (3) All electrical requirements associated with plumbing fixtures or equipment; append product data for all equipment requiring special power, temperature control or plumbing considerations; (4) Location of telecommunications equipment and general layout of conduits; and (5) Components and design of antennas, if any, (including associated equipment) as installed, in sufficient detail to evaluate weight, bearing requirements, wind-load characteristics, power requirements and the effects on Building structure, moisture resistance of the roof membrane and operations of pre-existing telecommunications equipment, to the extent known or based on information provided by Landlord. DOOR SCHEDULE: (1) Provide a schedule of doors, sizes, finishes, hardware sets and ratings; and (2) Non-standard materials and/or installation shall be explicitly noted. HVAC: (1) Areas requiring special temperature and/or humidity control requirements; (2) Heat emission of equipment (including catalogue cuts where reasonably required by Landlord or, where unavailable, based on engineer’s assumptions therefor), such as CRTs, copy machines, etc.; (3) Special exhaust requirements for conference rooms, pantry, toilets, etc.; and (4) Any extension of system beyond demised space. ELECTRICAL: (1) Special lighting requirements; (2) Power requirements and special outlet requirements of equipment; (3) Security requirements; (4) Supplied telephone equipment and the necessary space allocation for same; (5) Any extensions of tenant equipment beyond demised space; and (6) Load study confirming compliance with the leased space’s allowable xxxxx per square foot. PLUMBING: (1) Remote toilets; (2) Pantry equipment requirements; (3) Remote water and/or drain requirements such as for sinks, ice makers, etc.; and (4) Special drainage requirements, such as those requiring holding or dilution tanks. ROOF: Detailed plan of any existing and proposed roof equipment, if any, showing location and elevations of all equipment.

Appears in 1 contract

Samples: Office Lease Agreement (Atea Pharmaceuticals, Inc.)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!