Common use of PLANT VISIT Clause in Contracts

PLANT VISIT. The Bidder is advised to visit the Surat Lignite Power Plant (SLPP) after downloading the tender copy from website: xxx.xxxxx.xxx or xxx.xxxxxxxx.xxx to study the actual working conditions, before submitting their offer. The Bidders shall examine the site of works and its surroundings and see for himself that may be necessary for preparing the Bid and entering into a contract. All costs and liabilities arising out of the site visit shall be at Bidder’s account. The submission of tender by a contractor implies that he has read these instructions, conditions of the contract etc. and has himself aware of the scope, nature of works & specifications of the works to be done. GIPCL will not, therefore after acceptance of contractor’s rate, pay any extra charges for any other reason in case the contractor is found later on to have misjudged the site conditions. Any error in description or quantity or omission in the contract document shall not vitiate the contract or release the contractor from executing the work comprised in the contract according to scope of works. ANNUAL RATE CONTRACT FOR “INTEGRATED FIRE FIGHTING SERVICES FOR GIPCL/SLPP SURAT FOR THE YEAR: 2019-21 The Bidder is deemed to have examined and understood the tender document, obtained his own information in all matters whatsoever that may affect the works to be carried out especially mentioned or works which may have to be carried out to fulfill his contractual obligation within the scheduled rates and to have satisfied himself to the sufficiency for his offer. XXXXXX shall inspect the site, examine and obtain all information required and satisfy himself regarding matters such as access to site, communication, transport, working condition including constraint of work place, confined area, quantum of dusting, running equipment, importance of work, round the clock working conditions, safety requirements, temperature of fresh drained hot bed material, right of way, high flood level in River, flow of water during monsoon/dry season in the River/Nallah, the availability of local labour, local working conditions, before submission of his Bid. Ignorance of site conditions shall not be accepted by the GIPCL as basis for any claim for compensation. The submission of a Bid by the BIDDER will be construed as evidence that such an examination was made. Any later claims / disputes in regard to rates quoted shall not be entertained or considered by the GIPCL. The rates quoted by XXXXXX shall be based on his own knowledge and judgment of the conditions and hazards involved and shall not be based on any representations of the Engineer.

Appears in 1 contract

Samples: Annual Rate Contract

AutoNDA by SimpleDocs

PLANT VISIT. The Bidder is advised to visit the Surat Lignite Power Plant (SLPP) after downloading the tender copy from website: xxx.xxxxx.xxx or xxx.xxxxxxxx.xxx to study the actual working conditions, before submitting their offer. The Bidders shall examine the site of works and its surroundings and see for himself that may be necessary for preparing the Bid and entering into a contract. All costs and liabilities arising out of the site visit shall be at Bidder’s Bidder‟s account. The submission of tender by a contractor implies that he has read these instructions, conditions of the contract etc. and has himself aware of the scope, nature of works & specifications of the works to be done. GIPCL will not, therefore after acceptance of contractor’s contractor‟s rate, pay any extra charges for any other reason in case the contractor is found later on to have misjudged the site conditions. Any error in description or quantity or omission in the contract document shall not vitiate the contract or release the contractor from executing the work comprised in the contract according to scope of works. ANNUAL RATE CONTRACT FOR “INTEGRATED FIRE FIGHTING SERVICES FOR GIPCL/SLPP SURAT FOR THE YEAR: 2019-21 The Bidder is deemed to have examined and understood the tender document, obtained his own information in all matters whatsoever that may affect the works to be carried out especially mentioned or works which may have to be carried out to fulfill his contractual obligation within the scheduled rates and to have satisfied himself to the sufficiency for his offer. XXXXXX BIDDER shall inspect the site, examine and obtain all information required and satisfy himself regarding matters such as access to site, communication, transport, working condition including constraint of work place, confined area, quantum of dusting, running equipment, importance of work, round the clock working conditions, safety requirements, temperature of fresh drained hot bed material, right of way, high flood level in River, flow of water during monsoon/dry season in the River/Nallah, the availability of local labour, local working conditions, before submission of his Bid. Ignorance of site conditions shall not be accepted by the GIPCL as basis for any claim for compensation. The submission of a Bid by the BIDDER will be construed as evidence that such an examination was made. Any later claims / disputes in regard to rates quoted shall not be entertained or considered by the GIPCL. GIPCL.‟ The rates quoted by XXXXXX shall be based on his own knowledge and judgment of the conditions and hazards involved and shall not be based on any representations of the EngineerGIPCL officer.

Appears in 1 contract

Samples: www.gipcl.com

PLANT VISIT. The Bidder All the prospective bidders are requested to familiarize with the site condition by visiting GIPCL SLPP during the office hours with prior written consent from Chief General Manager (Fin, I/c. HR&A) & CFO (mail id: xxxxxxx@xxxxx.xxx) It is advised perquisite and necessary for all interested bidders to visit the Surat Lignite Power Plant (SLPP) after downloading the tender copy from website: xxxxx://xxx.xxxxxxxx.xxx or xxxxx://xxxxx.xxxxxxxx.xxx or xxx.xxxxx.xxx or xxx.xxxxxxxx.xxx to study understand the actual working conditions, compliance related to labour, safety etc… before submitting their offer. Failing which, any consequential liabilities arising will be to bidder’s account. The Bidders shall examine the site of works and its surroundings and see for himself at his/her own responsibility. The bidders shall collect information that may be necessary for preparing the Bid and entering into a contract. All costs and liabilities arising out of the site visit shall be at Bidder’s account. The Bidder is deemed to have examined and understood the tender document, obtained his/her own information in all matters whatsoever that might affect the carrying out the works expressly mentioned or works which may have to be carried out to fulfil his/her contractual obligation within the scheduled rates and to have satisfied himself/herself to the sufficiency for his/her offer. The submission of tender by a contractor bidder implies that he he/she has read these instructions, conditions of the contract etc. and has himself himself/herself aware of the scope, nature of works & specifications of the works to be done. GIPCL will not, therefore after acceptance of contractor’s rate, pay any extra charges for any other reason in case the contractor is found later on to have misjudged the site conditions. Any error in description or quantity or omission in the contract document shall not vitiate the contract or release the contractor from executing the work comprised in the contract according to scope of works, magnitude of the works, requirement of materials, equipment, tools & tackles, labour, etc. ANNUAL RATE CONTRACT FOR “INTEGRATED FIRE FIGHTING SERVICES FOR GIPCL/SLPP SURAT FOR THE YEAR: 2019-21 The Bidder is deemed Contractor has to have examined and understood complete the tender documentwork in accordance with the contract documents irrespective of any defects, obtained his own information in all matters whatsoever omissions or errors that may affect be found in the works to be carried out especially mentioned or works which may have to be carried out to fulfill his contractual obligation within the scheduled rates and to have satisfied himself to the sufficiency for his offercontract documents. XXXXXX BIDDER shall inspect the site, examine and obtain all information required and satisfy himself himself/herself regarding matters such as access to site, communication, transport, working condition including constraint of work place, confined area, quantum of dusting, running equipment, importance of work, round the clock working conditions, safety requirements, temperature of fresh drained hot bed materialplant shutdown/break-down related work requirement, right of way, high flood level in River, flow the type and number of water during monsoon/dry season in equipment and facilities required for the River/Nallahsatisfactory completion of work, the estimated quantity, the availability of local labour, availability & rates of material, local working conditions, uncertainties of weather, obstructions & hindrances that may arise, etc which may affect the work or cost thereof, before submission of his his/her Bid. Ignorance of site conditions shall not be accepted by the GIPCL as basis for any claim for compensation. The submission of a Bid by the BIDDER will be construed as evidence that such an examination was made. Any later claims / disputes in regard to rates quoted shall not be entertained or considered by the GIPCL. The rates quoted by XXXXXX shall be based on his his/her own knowledge and judgment of the conditions and & hazards involved and shall not be based on any representations of the Engineerrepresentative of GIPCL.

Appears in 1 contract

Samples: www.gipcl.com

PLANT VISIT. The Bidder is advised to visit the Surat Lignite Power Plant (SLPP) after downloading the tender copy of Tender document from website: xxx.xxxxx.xxx or xxx.xxxxxxxx.xxx the (n)Procure portal (xxx.xxxxxxxx.xxx) to study the actual working conditions, before submitting their offer. The Bidders shall examine the site of works and its surroundings and see for himself that may be necessary for preparing the Bid and entering into a contract. All costs and liabilities arising out of the site visit shall be at Bidder’s account. The submission of tender Tender by a contractor Contractor implies that he has read these instructions, conditions of the contract etc. and has himself aware of the scopeScope, nature of works & specifications of the works to be done. GIPCL will not, therefore after acceptance of contractorContractor’s rate, pay any extra charges for any other reason in case the contractor Contractor is found later on to have misjudged the site conditions. Any error in description or quantity or omission in the contract document shall not vitiate the contract or release the contractor Contractor from executing the work comprised in the contract according to scope of works, magnitude of the works, requirement of materials, equipment, tools & tackles, labour, etc. ANNUAL RATE CONTRACT FOR “INTEGRATED FIRE FIGHTING SERVICES FOR GIPCL/SLPP SURAT FOR THE YEAR: 2019-21 Contractor has to complete the work in accordance with the contract documents irrespective of any defects, omissions or errors that may be found in the contract documents. The Bidder is deemed to have examined and understood the tender document, obtained his own information in all matters whatsoever that may affect the works to be carried out especially mentioned or works which may have to be carried out to fulfill his contractual obligation within the scheduled rates and to have satisfied himself to the sufficiency for his offer. XXXXXX BIDDER shall inspect the site, examine and obtain all information required and satisfy himself regarding matters such as access to site, communication, transport, working condition including constraint of work place, confined area, quantum of dusting, running equipment, importance of work, round the clock working conditions, safety requirements, temperature of fresh drained hot bed material, right of way, high flood level in River, flow of water during monsoon/dry season in the River/NallahNullah, the type and number of equipment and facilities required for the satisfactory completion of work, the quantity of various items of the work, the availability of local labour, availability and rates of material, local working conditions, uncertainties of weather, obstructions and hindrances that may arise, etc which may affect the work or cost thereof, before submission of his Bid. Ignorance of site conditions shall not be accepted by the GIPCL as basis for any claim for compensation. The submission of a Bid by the BIDDER will be construed as evidence that such an examination was made. Any later claims / disputes in regard to rates quoted shall not be entertained or considered by the GIPCL. The rates quoted by XXXXXX shall be based on his own knowledge and judgment of the conditions and hazards involved and shall not be based on any representations of the Engineer.

Appears in 1 contract

Samples: www.gipcl.com

PLANT VISIT. The Bidder It is advised perquisite and necessary for all interested bidders to visit the Surat Lignite Power Plant (SLPP) site/plant after downloading the tender copy from website: xxx.xxxxx.xxx or xxx.xxxxxxxx.xxx to study understand the actual working conditions, compliance related to labour, safety etc. before submitting their offer. Failing which , any consequential liabilities arising will be to bidder’s account. The Bidders bidders shall examine the site of works and its surroundings and see for himself at his own responsibility. The bidders shall collect information that may be necessary for preparing the Bid bid and entering into a contract. All costs and liabilities arising out of the site visit shall be at Bidderbidder’s account. The bidder is deemed to have examined and understood the tender document, obtained his own information in all matters whatsoever that might affect the carrying out the works expressly mentioned or works which may have to be carried out to fulfill his contractual obligation within the scheduled rates and to have satisfied himself to the sufficiency for his offer. The submission of tender by a contractor implies that he has visited the site and read these instructions, conditions of the contract etc. and has himself aware of the scope, nature of works & specifications of the works to be done, General & Special Terms and Condition. GIPCL will not, therefore after acceptance of contractor’s rate, pay any extra charges for any other reason in case the contractor is found later on to have misjudged the site conditions. Any error in description or quantity or omission in the contract document shall not vitiate the contract or release the contractor from executing the work comprised in the contract according to scope of works, magnitude of the works, requirement of materials, equipment, tools& tackles, labour, etc. ANNUAL RATE CONTRACT FOR “INTEGRATED FIRE FIGHTING SERVICES FOR GIPCL/SLPP SURAT FOR THE YEAR: 2019-21 The Bidder is deemed Contractor has to have examined and understood complete the tender documentwork in accordance with the contract documents irrespective of any defects, obtained his own information in all matters whatsoever omissions or errors that may affect be found in the works to be carried out especially mentioned or works which may have to be carried out to fulfill his contractual obligation within the scheduled rates and to have satisfied himself to the sufficiency for his offercontract documents. XXXXXX BIDDER shall inspect the site, examine and obtain all information required and satisfy himself regarding matters such as access to site, communication, transport, working condition including constraint of work place, confined area, quantum of dusting, running equipment, importance of work, round the clock working conditions, safety requirements, temperature of fresh drained hot bed materialmaterial and associated risks, right of way, high flood level in River, flow of water during monsoon/dry season in the River/Nallah, the type and number of equipment and facilities required for the satisfactory completion of work, the quantity of various items of the work, the availability of local labour, availability and rates of material, local working conditions, uncertainties of weather, obstructions and hindrances that may arise, etc which may affect the work or cost thereof, before submission of his Bid. Ignorance of site conditions shall not be accepted by the GIPCL as basis for any claim for compensation. The submission of a Bid by the BIDDER will be construed as evidence that such an examination was made. Any later claims / disputes in regard to rates quoted shall not be entertained or considered by the GIPCL. The rates quoted by XXXXXX shall be based on his own knowledge and judgment of the conditions and hazards involved and shall not be based on any representations of the Engineer.

Appears in 1 contract

Samples: www.gipcl.com

AutoNDA by SimpleDocs

PLANT VISIT. The Bidder is advised to visit the Surat Lignite Power Plant (SLPP) after downloading the tender copy of Tender document from website: xxx.xxxxx.xxx or xxx.xxxxxxxx.xxx the (n)procure portal (xxx.xxxxxxxx.xxx) to study the actual working conditions, before submitting their offer. The Bidders shall examine the site of works and its surroundings and see for himself that may be necessary for preparing the Bid and entering into a contract. All costs and liabilities arising out of the site visit shall be at Bidder’s account. The submission of tender Tender by a contractor Contractor implies that he has read these instructions, conditions of the contract etc. and has himself aware of the scopeScope, nature of works & specifications of the works to be done. GIPCL will not, therefore after acceptance of contractorContractor’s rate, pay any extra charges for any other reason in case the contractor Contractor is found later on to have misjudged the site conditions. Any error in description or quantity or omission in the contract document shall not vitiate the contract or release the contractor Contractor from executing the work comprised in the contract according to scope of works, magnitude of the works, requirement of materials, equipment, tools & tackles, labour, etc. ANNUAL RATE CONTRACT FOR “INTEGRATED FIRE FIGHTING SERVICES FOR GIPCL/SLPP SURAT FOR THE YEAR: 2019-21 Contractor has to complete the work in accordance with the contract documents irrespective of any defects, omissions or errors that may be found in the contract documents. The Bidder is deemed to have examined and understood the tender document, obtained his own information in all matters whatsoever that may affect the works to be carried out especially mentioned or works which may have to be carried out to fulfill his contractual obligation within the scheduled rates and to have satisfied himself to the sufficiency for his offer. XXXXXX BIDDER shall inspect the site, examine and obtain all information required and satisfy himself regarding matters such as access to site, communication, transport, working condition including constraint of work place, confined area, quantum of dusting, running equipment, importance of work, round the clock working conditions, safety requirements, temperature of fresh drained hot bed material, right of way, high flood level in River, flow of water during monsoon/dry season in the River/NallahNullah, the type and number of equipment and facilities required for the satisfactory completion of work, the quantity of various items of the work, the availability of local labour, availability and rates of material, local working conditions, uncertainties of weather, obstructions and hindrances that may arise, etc which may affect the work or cost thereof, before submission of his Bid. Ignorance of site conditions shall not be accepted by the GIPCL as basis for any claim for compensation. The submission of a Bid by the BIDDER will be construed as evidence that such an examination was made. Any later claims / disputes in regard to rates quoted shall not be entertained or considered by the GIPCL. The rates quoted by XXXXXX shall be based on his own knowledge and judgment of the conditions and hazards involved and shall not be based on any representations of the Engineer.

Appears in 1 contract

Samples: www.gipcl.com

PLANT VISIT. The Bidder is advised to visit the Surat Lignite Power Plant (SLPP) after downloading the tender copy from website: xxx.xxxxx.xxx or xxx.xxxxxxxx.xxx xxxx://xxxxxxx.xxxxx.xxx/ to study the actual working conditions, before submitting their offer. The Bidders shall examine the site of works and its surroundings and see for himself that may be necessary for preparing the Bid and entering into a contract. All costs and liabilities arising out of the site visit shall be at Bidder’s account. The submission of tender by a contractor implies that he has read these instructions, conditions of the contract etc. and has himself aware of the scope, nature of works & specifications of the works to be done. GIPCL will not, therefore after acceptance of contractor’s rate, pay any extra charges for any other reason in case the contractor is found later on to have misjudged the site conditions. Any error in description or quantity or omission in the contract document shall not vitiate the contract or release the contractor from executing the work comprised in the contract according to scope of works, magnitude of the works, requirement of materials, equipment, tools& tackles, labour, etc. ANNUAL RATE CONTRACT FOR “INTEGRATED FIRE FIGHTING SERVICES FOR GIPCL/SLPP SURAT FOR THE YEAR: 2019-21 Contractor has to complete the work in accordance with the contract documents irrespective of any defects, omissions or errors that may be found in the contract documents. The Bidder is deemed to have examined and understood the tender document, obtained his own information in all matters whatsoever that may affect the works to be carried out especially mentioned or works which may have to be carried out to fulfill his contractual obligation within the scheduled rates and to have satisfied himself to the sufficiency for his offer. XXXXXX BIDDER shall inspect the site, examine and obtain all information required and satisfy himself regarding matters such as access to site, communication, transport, working condition including constraint of work place, confined area, quantum of dusting, running equipment, importance of work, round the clock working conditions, safety requirements, temperature , the type and number of fresh drained hot bed materialequipment and facilities required for the satisfactory completion of work, right the quantity of way, high flood level in River, flow various items of water during monsoon/dry season in the River/Nallahwork, the availability of local labour, availability and rates of material, local working conditions, uncertainties of weather, obstructions and hindrances that may arise, etc which may affect the work or cost thereof, before submission of his Bid. Ignorance of site conditions shall not be accepted by the GIPCL as basis for any claim for compensation. The submission of a Bid by the BIDDER will be construed as evidence that such an examination was made. Any later claims / disputes in regard to rates quoted shall not be entertained or considered by the GIPCL. The rates quoted by XXXXXX shall be based on his own knowledge and judgment of the conditions and hazards involved and shall not be based on any representations of the Engineer.

Appears in 1 contract

Samples: www.gipcl.com