PLOWING SNOW Sample Clauses

PLOWING SNOW a. Plowing shall start as soon as practical giving due consideration to the intensity and duration of the storm. Plowing shall continue throughout the storm with blades set to clean the pavement unless storm conditions warrant leaving a brine-slush accumulation until the storm subsides. The snow shall be pushed back off the shoulders and into the ditches to make way for later falls and to ensure that it melts down in the ditches.
AutoNDA by SimpleDocs

Related to PLOWING SNOW

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Wastewater investments in the construction, material enhancement, or renewal of infrastructure that supports wastewater and storm water collection, treatment, and management systems. Note: Investments in health infrastructure (e.g., hospitals, long-term care facilities, convalescent centres, and senior centres) are not eligible. Eligible Expenditures will be limited to the following: 1. Infrastructure investments – expenditures associated with acquiring, planning, designing, constructing, or renovating a tangible capital asset and any related debt financing charges specifically identified with that asset. 2. Capacity-building costs – for projects eligible under the capacity-building category only, expenditures associated with the development and implementation of: • Capital investment plans, integrated community sustainability plans, integrated regional plans, housing needs assessments, or asset management plans; • Studies, strategies, systems, software, third-party assessments, plans, or training related to asset management; • Studies, strategies, systems, or plans related to housing or land use; • Studies, strategies, or plans related to the long-term management of infrastructure; and • Other initiatives that strengthen the Recipient’s ability to improve local and regional planning. 3. Joint communications and signage costs – expenditures directly associated with joint federal communication activities and with federal project signage.

  • Utilities; Amenities The following utilities are included in the Total Rent set forth in this Agreement: Internet access and trash disposal. Resident will pay as additional Rent a pro-rata share (based on the number of contracted residents in possession for the applicable period) for the apartment's usage of electricity and water, applied pro-rata to any partial billing cycle. Resident will be responsible for his or her pro-rata share of electricity and water charges during the term of this Agreement, regardless of actual date of move-in or move-out. No refund or credit will be provided for usage below any applicable allowance levels. In connection with the administration of utility billing during the term of this Agreement, Resident will pay prior to occupying the assigned apartment (or on the first utility bill, at Owner's discretion), a single up-front billing service fee of up to $72.00 (or alternately, at Owner's option, a service fee of up to $6.00 per monthly bill) for administration, billing, overhead and similar expenses and charges incurred by Owner for providing utility allocations and billing services. Upon Resident's request, Owner will provide copies of applicable utility bills. At Owner's option, to the extent permitted by law, Resident may be pre-billed for the estimated amount of charges for any electricity and/or water bills anticipated to be received during the final 30 days of the term or after the end of the term of this Agreement, calculated based on historical electricity and/or water charges for the apartment and pursuant to applicable utility billing laws and regulations. As part of each utility bill, Resident may be charged and agrees to pay promptly to Owner any other miscellaneous charges billed by the utility provider and payable by the customer of record, plus late payment fees and/or NSF fees, as may be applicable, in the amounts stated in paragraph 2 of this Agreement, as liquidated estimates of costs incurred in connection with the administration and collection of late payment. Owner may elect to use one or more third-party service providers for providing, billing and/or servicing utility accounts; Resident acknowledges that such third-party providers are not utility providers. Owner makes no representations and hereby disclaims any and all warranties, express or implied, with respect to any utilities provided, including but not limited to those warranties concerning merchantability and fitness for a particular purpose or use, whether made allegedly by Owner or its representatives or agents, whether in writing or otherwise, except as otherwise expressly stated in this Agreement. Owner does not warrant or guarantee the protection of Resident's privacy during operation of utilities, that such utilities will satisfy Resident's requirements, or that the operation of utilities will be uninterrupted or error free. Resident acknowledges and agrees that neither Owner nor its affiliates, agents, employees or representatives will be responsible to Resident for any non-economic, consequential, incidental, indirect or special damages, including incidental, economic or punitive damages, arising from breach of warranty, breach of contract, negligence or any other legal ground of action, or by reason of the use, discontinuation or modification of any utilities or the termination of any utilities, whether arising from Resident's use of (or inability to use) utilities, or otherwise, even if Owner has been advised of the possibility of such damage. In the event that any utility service proves defective, or is discontinued or terminated, Owner's and Manager's entire combined liability and Resident's exclusive remedy will be limited to a reimbursement of the approximate cost of that utility incurred by Resident, prorated by the day for each day the utility service proved defective, or was discontinued or terminated, for more than 24 hours. Resident agrees to indemnify, defend and hold harmless Owner and its employees, affiliates and agents, from any and all losses, claims, damages, expenses, other liabilities and causes of action of every nature, including attorney fees, which arise directly or indirectly in connection with: (i) violation by Resident of any laws, ordinances, regulations or rules regarding the utilities; or (ii) illegal or inappropriate use of the utilities. Any damage or loss to any utility devices during Resident's occupancy will be charged to Resident (and the other resident(s) in the apartment, as applicable) at the replacement cost. Management will establish schedules and policies for the use of recreation facilities, amenities and other common spaces. Owner may add, remove, close (temporarily or permanently), upgrade or modify any of the recreation facilities, amenities or common spaces in Owner's discretion, without notice or compensation; provided that if this Agreement expressly includes a separate Amenity Fee, Resident's sole remedy will be limited to a pro-rata credit of such Amenity Fee for the period a covered amenity is closed or fully unavailable. SAMPLE

  • Fish and Wildlife Service 2002c. Colorado pikeminnow (Ptychocheilus lucius) recovery goals: amendment and supplement to the Colorado Squawfish Recovery Plan.

  • Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following: a. Initial Study b. Categorical Exemption (CE) c. Notice of Exemption (XXX) d. Negative Declaration (ND) e. Mitigated Negative Declaration (MND) f. Notice of Preparation (NOP) g. Environmental Impact Report (EIR) i. Initial Document (Screen Check/Administrative Draft) ii. Addendum iii. Supplemental

  • Environmental Tobacco Smoke Public Law 103-227 (also known as the Pro-Children Act of 1994) and Vermont’s Act 135 (2014) (An act relating to smoking in lodging establishments, hospitals, and child care facilities, and on State lands) restrict the use of tobacco products in certain settings. Party shall ensure that no person is permitted: (i) to use tobacco products or tobacco substitutes as defined in 7 V.S.A. § 1001 on the premises, both indoor and outdoor, of any licensed child care center or afterschool program at any time; (ii) to use tobacco products or tobacco substitutes on the premises, both indoor and in any outdoor area designated for child care, health or day care services, kindergarten, pre-kindergarten, elementary, or secondary education or library services; and (iii) to use tobacco products or tobacco substitutes on the premises of a licensed or registered family child care home while children are present and in care. Party will refrain from promoting the use of tobacco products for all clients and from making tobacco products available to minors. Failure to comply with the provisions of the federal law may result in the imposition of a civil monetary penalty of up to $1,000 for each violation and/or the imposition of an administrative compliance order on the responsible entity. The federal Pro-Children Act of 1994, however, does not apply to portions of facilities used for inpatient drug or alcohol treatment; service providers whose sole source of applicable federal funds is Medicare or Medicaid; or facilities where Women, Infants, & Children (WIC) coupons are redeemed.

  • Procurement of the Site (i) The Authority Representative, the Contractor and Authority’s Engineer shall, within 10 (ten) days of the date of this Agreement, inspect the Site and prepare a detailed memorandum containing an inventory of the Site including the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site (hereinafter referred to as the “Handover Memorandum”). Subject to the provisions of Clause 8.2 (iii), the Handover Memorandum shall have appended thereto an appendix (the “Appendix”) specifying in reasonable detail those parts of the Site to which vacant access and Right of Way has not been given to the Contractor along with details of hindrances in the Construction Zone. For sake of clarity the Handover Memorandum shall clearly specify the parts of Site where work can be executed. Signing of the Handover Memorandum, in three counterparts (each of which shall constitute an original), by the authorized representatives of the Authority, Contractor and Authority’s Engineer shall be deemed to constitute a valid evidence of giving the Right of Way to the Contractor for discharging its obligations under and in accordance with the provisions of this Agreement and for no other purpose whatsoever. (ii) Whenever the Authority is ready to hand over any part or parts of the Site included in the Appendix, it shall inform the Contractor, by notice, of the proposed date and time such of hand over. The Authority Representative and the Contractor shall, on the date so notified, inspect the specified parts of the Site, and prepare a memorandum containing an inventory of the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site so handed over. The signing of the memorandum, in three (3) counterparts (each of which shall constitute an original), by the authorised representatives of the Parties shall be deemed to constitute a valid evidence of giving the relevant Right of Way to the Contractor. If the contractor fails to join for site inspection or disputes the parts of the site available for work, the Authority’s Engineer shall decide the parts of the site where work can be executed and notify to both the parties within 3 days of the proposed date of inspection. The parties agree that such notification of the Authority’s Engineer as mentioned hereinabove shall be final and binding on the parties. (iii) The Authority shall provide the Right of Way to the Contractor in respect of all land included in the Appendix by the date specified in Schedule-A for those parts of the Site referred to therein, and in the event of delay for any reason other than Force Majeure or breach of this Agreement by the Contractor, it shall pay to the Contractor, Damages in a sum calculated in accordance with Clause 8.3. The Contractor agrees that it shall not be entitled to claim any other damages on account of any such delay by the Authority. (iv) Notwithstanding anything to the contrary contained in this Clause 8.2, the Authority shall specify the parts of the Site, if any, for which Right of Way shall be provided to the Contractor on the dates specified in Schedule-A. Such parts shall also be included in the Appendix prepared in pursuance of Clause 8.2 (i). (v) The Authority further acknowledges and agrees that prior to the Appointed Date, it shall have procured issuance of the statutory notification under Applicable Laws for vesting of all the land comprising the Project in the Authority and has taken possession of area for Construction Zone for at least 90% (ninety per cent) of the total length of the Project Highway. The Parties also acknowledge and agree that the conditions specified in this Clause 8.2 (iii) shall not be modified or waived by either Party. (vi) For the avoidance of doubt, the Parties expressly agree that the Appendix shall in no event contain sections of the Project Highway the cumulative length of which exceeds 10% (ten percent) of the total length of the Project Highway. (vii) Pursuant to signing of Handover Memorandum under clause 8.2 (i), Contractor shall submit to the Authority’s Engineer, a monthly land possession report till expiry of 180 (one hundred and eighty) days from Appointed Date, in respect of those parts of the site to which vacant access and right of way was not given to the contractor and included in Appendix to the memorandum signed under clause 8.2 (i), duly specifying the part of the site, if any, for which the right of way is yet to be handed over.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!