Post-Production Acceptance Verification Testing Sample Clauses

Post-Production Acceptance Verification Testing. 5.4.1. After the STABILIZED SOIL is installed (or soil improved), SOIL CONTRACTOR will be required to perform post-production verification testing in accordance with the approved acceptance criteria. This will include, at a minimum, core drilling and logging, core recovery documentation, and unconfined compressive testing of select samples. Coring shall be conducted using a triple barrel sampler, or using a double barrel sampler with an additional inner sleeve or split barrel.
AutoNDA by SimpleDocs

Related to Post-Production Acceptance Verification Testing

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Product Testing Upon request, Customer shall provide Operator a laboratory report for each Product delivery by Customer or Customer’s supplier. Operator will not be obligated to receive Contaminated Product for throughput through the Pipelines, nor will Operator be obligated to accept Product that fails to meet the applicable quality specifications for the Berths under the BAUTA and any Terminal Service Orders issued thereunder.

  • Account Verification Whether or not a Default or Event of Default exists, Agent shall have the right at any time, in the name of Agent, any designee of Agent or any Borrower, to verify the validity, amount or any other matter relating to any Accounts of Borrowers by mail, telephone or otherwise. Borrowers shall cooperate fully with Agent in an effort to facilitate and promptly conclude any such verification process.

  • Facility Type    Call Sign    Exp Date TV Broadcast Station License WBRE-TV 08/01/2007 (Channel 28, Xxxxxx-Xxxxx, Pennsylvania) DTV Facility WBRE-DT 08/01/2007 (Channel 11, Xxxxxx-Xxxxx, Pennsylvania) TV Translator Station License W24BL 08/01/2007 TV Translator Station License W30AN 08/01/2007 TV Translator Station License W51BP 08/01/2007 TV Translator Station License W64AL 08/01/2007 Transmit-Only Earth Station License E910642 11/01/2011 Transmit-Receive Earth Station License E020058 05/03/2017 TV Pickup KA35201 08/01/2007 TV Pickup KA35245 08/01/2007 TV Pickup KA74870 08/01/2007 TV Pickup KC62824 08/01/2007 Broadcast Auxiliary KF5726 08/01/2007 TV Studio Transmitter Link KGH66 08/01/2007 R/P Base Mobile System KGU973 08/01/2007 TV Pickup KK4138 08/01/2007 TV Pickup KL2535 08/01/2007 TV Pickup KP4407 08/01/2007 R/P Base Mobile System KQB618 08/01/2007 TV Pickup KR7688 08/01/2007 TV Pickup KR7693 08/01/2007 TV Pickup KR7771 08/01/2007 TV Pickup KS2001 08/01/2007 TV Pickup KY2899 08/01/2007 R/P Mobile KY5608 08/01/2007 TV Studio Transmitter Link KZO21 08/01/2007 TV Intercity Relay WFW575 08/01/2007 TV Intercity Relay WGI290 08/01/2007 TV Intercity Relay WHB674 08/01/2007 TV Intercity Relay WLI324 08/01/2007 TV Intercity Relay WLI325 08/01/2007 TV Intercity Relay WLI337 08/01/2007 TV Intercity Relay WMF322 08/01/2007 TV Intercity Relay WMF323 08/01/2007

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

  • Annual Collateral Verification Each year, at the time of delivery of annual financial statements with respect to the preceding Fiscal Year pursuant to Section 5.1(c), Company shall deliver to Collateral Agent a certificate of an Authorized Officer either (i) confirming that there has been no change in such information since the date of the Collateral Questionnaire delivered on the Closing Date or the date of the most recent certificate delivered pursuant to this Section 5.1(o) or (ii) identifying such changes;

  • Remittance Processing Services In order to provide a means of collection of the Receivables which will allow the Trustee to receive the proceeds of the Receivables and related security without AmeriCredit or its Affiliates having access to the funds, the parties hereto agree for the benefit of the Trustee that the processing services (the “Service(s)”) of Processor will be used for the collection and the deposit of remittances related to the Receivables and related security.

  • Validation To validate the notice requirements outlined in Section 5.3, the Assuming Institution shall provide the Receiver (i) an Affidavit of Publication to meet the publication requirements outlined in Section 5.3(a) and (ii) the Assuming Institution will prepare an Affidavit of Mailing in a form substantially similar to Exhibit 2.3B after mailing the seven (7) day Notice to Depositors as required under Section 5.3(b).

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!