Power System Restoration Sample Clauses

Power System Restoration. Effective procedures for restoration of the network require coordination and communication at all levels of the Parties’ organizations and with their membership. During power system restoration, the Parties will coordinate their actions with each other, as well as with other appropriate entities in order to restore the transmission system as safely and efficiently as possible. In order to enhance the effectiveness of actual restoration operations among the Parties, the Parties will exchange their respective restoration plan and coordinate as required by NERC and Regional Reliability Standards.
AutoNDA by SimpleDocs
Power System Restoration. Effective restoration procedures require coordination and communication at all levels of the Parties’ organizations and their membership. During power system restoration, the Parties will coordinate their actions with each other, as well as with other Reliability Coordinators, in order to restore the transmission system as safely and efficiently as possible. In order to enhance restoration operations between the Parties, both Parties will conduct annual coordinated restoration drills. These drills will stress cooperation and communication so that both Parties are positioned to better assist the other in a real restoration
Power System Restoration. During any power system restoration, the Parties shall coordinate their actions with each other, as well as with other appropriate entities in order to restore the transmission system as safely and efficiently as possible. To enhance the effectiveness of actual restoration operations among the Parties, the Parties shall conduct annual coordinated restoration drills that stress cooperation and communication among the Parties.
Power System Restoration. Version: 0.0.0 Effective: 3/25/2011 Effective restoration procedures require coordination and communication at all levels of the Parties‟ organizations and their membership. During power system restoration, the Parties will coordinate their actions with each other, as well as with other RCs, in order to restore the transmission system as safely and efficiently as possible. In order to enhance restoration operations between the Parties, both Parties will conduct annual coordinated restoration drills. These drills will stress cooperation and communication so that both Parties are positioned to better assist the other in a real restoration Section 8.1.2 Joint Voltage Stability Operating Protocol. Version: 0.0.0 Effective: 3/25/2011 Voltage stability or collapse problems have the potential to cause cascading outages and therefore must be closely coordinated to maintain reliable operations. As such, the Parties will coordinate operations in accordance with good utility practice in order to maintain stable voltage profiles throughout the respective Party‟s zones of operations.

Related to Power System Restoration

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.