Power-Take-Off (PTO Sample Clauses

Power-Take-Off (PTO. Power-Take-In (PTI)/Power-Take-Home(PTH) Systems PTO/PTI/PTH systems use and electric machine connected to the main propulsion engine to either generate electric power and/or provide power for propulsion. This machine can be either in-line, where the generator/motor is connected in-line of the main propulsion shaft, or parallel to the main propulsion engine, where the generator/motor is connected to the propulsion shaft through a gearbox. To make comparison and analysis of the different electric network and systems easier, only synchronous machines will be used to develop the different PTO/PTI/PTH models, see above models. The models will be created to switch from a motor to a generator to provide propulsion power or electrical power respectively, depending to operational load of the main engine and the operational profile of the reference ship, i.e. sailing speed and auxiliary power demands at given times. The model will simply consist of a synchronous motor/generator model, a gearbox model connecting it to main engine and propulsion shaft models already created for the INOMANS2HIP libraries and combined to create the system models, see chapter 6.7 and 7. This, therefore, will require the reference ship’s specification, sailing and operational profile to enable the PTO/PTI/PTH system models to be created. Selection of the reference ship will be later in this project and reported in Deliverable D1.2 (due May 2014).
AutoNDA by SimpleDocs

Related to Power-Take-Off (PTO

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • Pre-Layoff Canvass (a) Where the Employer identifies to the Union a need to proceed with a layoff of Employees pursuant to Article 12.1, the Employer shall, prior to issuing a layoff notice to any Employee under Article 12, canvass any Employee or group of Employees within the area identified for reduction in order to invite on a voluntary basis:

  • EPP command RTT Refers to “EPP session-­‐command RTT”, “EPP query-­‐command RTT” or “EPP transform-­‐command RTT”.

  • VOETSTOOTS The PROPERTY is sold:

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Unbundled Copper Loop Designed (UCL-D)

  • Career Ladder Effective July 1, 2014, TALC and the District agreed to the 11 implementation of a Career Ladder for the advancement of instructional staff on the 12 Performance Salary Schedule. Elements of the Career Ladder are outlined and posted on 13 the District website and include detailed descriptions of Career Ladder levels and the 14 requirements for movement. All instructional staff hired on or after January 8, 2018 will 15 be placed on the Apprentice level of the Career Ladder.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

  • Unbundled Sub-Loop Feeder 2.8.4.1 Unbundled Sub-Loop Feeder (USLF) provides connectivity between BellSouth's central office and cross-box (or other access point) that serves an end user location.

  • Click Save Save a cloud model to local machine

Time is Money Join Law Insider Premium to draft better contracts faster.