PREPARATORY WORK TO EXISTING SURFACES Sample Clauses

PREPARATORY WORK TO EXISTING SURFACES. 14 Hacking top of existing concrete surface beds and preparing to receive new screeds where raised floors removed m2 152 Carried Forward to Summary of Section No. 2 R Item No SECTION NO.2 BUILDING WORK BILL NO.4
AutoNDA by SimpleDocs
PREPARATORY WORK TO EXISTING SURFACES. Preparatory work:
PREPARATORY WORK TO EXISTING SURFACES. All existing surfaces shall be thoroughly cleaned down by methods suitable for the specific finish. Damaged finishes shall be completely removed. All existing finishes to be made good where damaged by removals, furniture, etc, and all screw and nail holes and cracks shall be opened and filled with a suitable filler and finished smooth WALL TILING 300 x 600mm Full Bodied Porcelain tiles with 3mm grouting lines from Tile Space or Union Tiles. Wall edge / corners to be finished with Stainless Steel Square Edge Trims. 1 On walls m2 155 FLOOR TILING A01: 600 x 600mm x 10mm Porcelain Tile fixed to internal floor screed with TAL tile adhesive (elsewhere specified) mixed with TAL bonding liquid in lieu of water with diagonal joints continuous in both directions and grouted with TAL tile grout, excess grout on the surface to be cleaned with water as work proceeds.
PREPARATORY WORK TO EXISTING SURFACES. 5 Hacking faces of existing face brickwork to receive plaster m2 42
PREPARATORY WORK TO EXISTING SURFACES. 3 Carefully remove existing putty to steel frame windows, with openable and fixed window panes, ensuring not to damage existing glazing, including replacing with new putty m 797 Carried to Summary R Bill No. 2 Demolitions & Alterations Item No BILL NO 14 Quantity Rate Amount PAINT WORK PREAMBLES NOTE : Tenderers are advised to study the "MODEL PREAMBLES FOR TRADES" (2008 Edition) as recommended and published by the Association of South African Quantity Surveyors before pricing this bill. GENERAL General items, described in Bill No. 2, shall equally apply to this Bill. SUPPLEMENTARY PREAMBLES Supplementary preamble items, describes in Bill No. 2, shall equally apply to this Bill. Note: Please refer to "Finishes Schedule" drawing for further specifications and detailed schedule of finishes. Note: "Or equal approved" means approved by the Architect. PAINT WORK ETC TO PREVIOUSLY PAINTED WORK ON FLOATED EXTERNAL PLASTER Prepare stop and apply one coat "Professional Gypsum & Plaster Primer (PP700)" as a primer and two coats "Plascon Professional Superior Low Sheen (PEM 1000/TLS)" paint on: 1 Walls and columns m2 2,796 2 In narrow widths m2 166 Carried Forward Bill No. 3 Paint Work R Brought Forward R Prepare stop and apply one coat "Professional Gypsum & Plaster Primer (PP700)" as a primer, three full coats "Plascon Professional Waterproofing Compound (PWC 520)", one coat "Plascon Professional Marroca Rippled Texture Low Sheen (PTX1400/TRX)" and two coats "Plascon Professional Superior Low Sheen (PEM 1000/TLS)" paint on: 3 Walls and columns m2 268 Prepare stop and apply one coat "Professional Gypsum & Plaster Primer (PP700)" primer and two coats "Plascon Professional Contractors Matt (PEM 600/TCP)" paint on: 4 Soffit of slab m2 238 5 Ceilings and beams m2 44 ON METAL SURFACES Prepare stop and apply one coat "Plascoprime 170 Primer (UC170)" primer and two coats "Plascon Velvaglo Water Based (VLW/TVW)" paint on: 6 Door frames m2 3 7 Window frames m2 292 8 Columns and beams m2 20 9 Rails, bars, pipes, etc not exceeding 300mm girth m 29 10 Gates, grilles, burglar screens, balustrades, etc m2 123 Note: balustrades and palisades measured over full flat area on both sides. Windows and grilles measured over full flat area on only one side as only external paint is required. Prepare stop and apply one coat "Plascon Epiwash Strontium Primer (AW255)" primer and two coats "Plascon Waterbased Velvaglo (VLW/TVW)" paint on aluminium: 11 Door frames m2 3 Carried Forward R Bill ...
PREPARATORY WORK TO EXISTING SURFACES. 25 Scabble existing concrete floor with a heavy duty floor scabbler m2 411 CLEANING OF EXISTING SURFACES, ETC. Cleaning down existing stairs with a high pressure jet/detergent water spray system 26 Roof m2 363 Carried Forward to Summary of Section No. 1 R MADIBA VALLEY XXXX Xxxx No. 3 Alterations Item No SECTION NO. 1 Quantity Rate

Related to PREPARATORY WORK TO EXISTING SURFACES

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Removal of Improvements Except as otherwise expressly agreed to by Lessor and Lessee, Lessee shall have the right to remove all Tank Farm Assets and other improvements, fixtures, equipment, materials, supplies and personal property installed by Lessee from the Premises upon the termination or expiration of this Lease, but in no event later than the date that is 120 days following the expiration or termination of this Lease (the “Removal Date”) and Lessor shall provide Lessee with access to the Premises at reasonable times until expiration of the Removal Date for the purpose of removing such items. Lessee shall provide Lessor with written notice of its election to remove the Tank Farm Assets and other improvements, fixtures, equipment, materials, supplies and personal property from the Premises at least 60 days prior to the expiration of the Lease. If Lessee elects to remove the Tank Farm Assets and Improvements from the Premises after such removal Lessee shall restore any damage to the Premises and clean the Premises so as to eliminate therefrom any accumulation (other than any de minimis and non-hazardous accumulation) of foreign substances, materials, or debris, in addition to any Environmental Cleanup that may be required under Article 10. Lessee shall pay Lessor pro rata Rent (based on the amount of Rent applicable during the last month prior to the termination or expiration) through the date of Lessee’s complete removal of all such items. During the period of such removal and clean-up, all terms and conditions of this Lease, including, the indemnity and insurance provisions shall continue in full force and effect. If Lessee elects not to remove all of the Tank Farm Assets and Improvements from the Premises on or before the Removal Date, and provided that such facilities are in good working condition at the expiration of the Term (ordinary wear and tear excepted) then, such Tank Farm Assets and Improvements shall be deemed permanently abandoned to Lessor’s sole ownership, and Lessor may remove and dispose of such facilities in any manner which Lessor may deem appropriate, without any liability whatsoever to Lessee. If Lessee elects not to remove all of the Tank Farm Assets and Improvements from the Premises on or before the Removal Date and such facilities are not in good working condition at the expiration of the term (ordinary wear and tear excepted), or Lessee fails to so remove any or all of the Tank Farm Assets and Improvements from the Premises before the Removal Date, then, in addition to all rights and remedies available at law or in equity, without any prior notice, Lessor may (but shall be under no obligation), at Lessor’s option, deem such Tank Farm Assets and Improvements to be permanently abandoned to Lessor’s sole ownership, and Lessor may remove and dispose of such facilities in any manner which Lessor may deem appropriate, without any liability whatsoever to Lessee, and Lessee shall reimburse Lessor for all costs of such removal and disposal upon demand from Lessor. If requested by Lessor, Lessee shall execute any and all documents necessary to evidence that title to the Tank Farm Assets and Improvements that Lessee does not remove by the Removal Date is in Lessor and to extinguish and remove any cloud or potential cloud on the title to the Premises and/or such facilities created by Lessee.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.

  • CONSTRUCTION AND IMPROVEMENTS Concessionaire shall not affix, alter, or erect any permanent or temporary equipment, structures, buildings, or additions to the Concession Premises without first obtaining the prior written approval of Department.

  • ALTERATIONS & IMPROVEMENTS Tenant shall not make any alterations, additions or improvements or do any type of construction to the Property without first obtaining Landlord's written consent. Unless prior written agreement is reached between Tenant and Landlord, any such alterations, additions, improvements or construction shall become part of the Property and shall remain at the expiration of Tenant's Lease term. If Landlord approves of alterations, additions, improvements or construction in writing and Tenant intends to use contractors to undertake such work, the contractors must first be approved in writing by Landlord. Tenant must also place any funds to cover the amount of any alterations, additions, improvements or construction in an escrow account approved by Landlord before the commencement of the work. Landlord shall designate the times and manner of the work being done, exclusively.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Site Improvements The City may require a Developer to undertake site improvements upon completion of construction. Site improvements include, but are not limited to, seeding or sodding of front yards, and 4' chain-link fencing. Said site improvements must be undertaken when seasonally appropriate. The City reserves the right to make an exception on a case-by-case basis.

Time is Money Join Law Insider Premium to draft better contracts faster.