PREPARATORY WORK TO EXISTING SURFACES Sample Clauses

PREPARATORY WORK TO EXISTING SURFACES. 16 Hacking top of existing concrete surface beds and preparing to receive new screeds where raised floors removed m2 126 SECTION NO.2 BUILDING WORK BILL NO.2
AutoNDA by SimpleDocs
PREPARATORY WORK TO EXISTING SURFACES. Preparatory work BILL NO. 2
PREPARATORY WORK TO EXISTING SURFACES. 25 Scabble existing concrete floor with a heavy duty floor scabbler m2 411 Cleaning down existing stairs with a high pressure jet/detergent water spray system 26 Roof m2 363 MADIBA VALLEY XXXX Xxxx No. 3 Alterations
PREPARATORY WORK TO EXISTING SURFACES. 3 Carefully remove existing putty to steel frame windows, with openable and fixed window panes, ensuring not to damage existing glazing, including replacing with new putty
PREPARATORY WORK TO EXISTING SURFACES. 5 Hacking faces of existing face brickwork to receive plaster m2 42
PREPARATORY WORK TO EXISTING SURFACES. All existing surfaces shall be thoroughly cleaned down by methods suitable for the specific finish. Damaged finishes shall be completely removed. All existing finishes to be made good where damaged by removals, furniture, etc, and all screw and nail holes and cracks shall be opened and filled with a suitable filler and finished smooth WALL TILING 300 x 600mm Full Bodied Porcelain tiles with 3mm grouting lines from Tile Space or Union Tiles. Wall edge / corners to be finished with Stainless Steel Square Edge Trims. 1 On walls m2 155 FLOOR TILING A01: 600 x 600mm x 10mm Porcelain Tile fixed to internal floor screed with TAL tile adhesive (elsewhere specified) mixed with TAL bonding liquid in lieu of water with diagonal joints continuous in both directions and grouted with TAL tile grout, excess grout on the surface to be cleaned with water as work proceeds.
PREPARATORY WORK TO EXISTING SURFACES. Preparatory work:
AutoNDA by SimpleDocs

Related to PREPARATORY WORK TO EXISTING SURFACES

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Additional Improvements Common Area Operating Expenses shall not include Real Property Taxes specified in the tax assessor's records and work sheets as being caused by additional improvements placed upon the Industrial Center by other lessees or by Lessor for the exclusive enjoyment of such other lessees. Notwithstanding Paragraph 10.1 hereof, Lessee shall, however, pay to Lessor at the time Common Area Operating Expenses are payable under Paragraph 4.2, the entirety of any increase in Real Property Taxes if assessed solely by reason of Alterations, Trade Fixtures or Utility Installations placed upon the Premises by Lessee or at Lessee's request.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!