Prepare Technical Specifications Sample Clauses
Prepare Technical Specifications. FAA Standard Specifications - latest edition at the time of execution of this Professional Services Agreement will be used as a basis in the preparation of the technical specifications for the PROJECT.
Prepare Technical Specifications. This task includes assembling the technical specifications necessary for the project. The standard specifications to be utilized will include, but not be limited to, the following:
Prepare Technical Specifications. The CONSULTANT will prepare Technical Specifications using Standard Specifications developed from CDOT standards and local requirements shall be used.
Prepare Technical Specifications. Consultant shall prepare final technical specifications as required for bidding. The documents shall be consistent the City’s procurement procedures for bid solicitation. The City will prepare all front end documents.
Prepare Technical Specifications. Consultant shall use EJCDC documents to prepare Divisions 0 and 1 for the Project and provide them to District. Consultant shall use the standard Construction Specifications Institute project manual format for the technical specifications.
Prepare Technical Specifications. Consultant shall prepare final technical specifications as required for bidding. The documents shall be consistent the City’s procurement procedures for bid solicitation. The City will prepare all front end documents.
4.1 Topographic Survey: Services will include additional topographic data, stream cross sections along ▇▇▇▇ Mill Creek and Mill Creek, GDOT bridge survey report, horizontal/vertical control along ▇▇▇▇ Mill Creek and locating additional wetland/stream delineation flagging throughout project area. Full surveying scope of services is included in the proposal from ▇▇▇▇▇ and Associates Land Surveyors, LLC see Exhibit “C”.
5.1 Environmental: Including Wetland and Stream Delineation, United States Army Corps of Engineers (USACE) Pre-Construction Notification (PCN) for use in a Nationwide Permit 14 for the impacts to jurisdictional waters, and Georgia Environmental Protection Division (GA EPD) Stream Buffer Variance application for impacts to state-waters including the 25’ stream buffer and are further described below along with estimated cost. Full environmental scope of services is included in the proposal from River to Tap (R2T), see Exhibit “C”.
Prepare Technical Specifications. The Engineer will review and assemble the technical specifications necessary for the intended work. Standard FAA specifications (Advisory Circular ▇▇▇-▇▇▇▇-▇▇, most current revision) will be used for this project. Additional specifications may be prepared to address work items or materials not covered by the FAA specifications. The standard specifications to be utilized include but are not limited to the following: Item C-100 Contractor Quality Control Program (CQCP) Item C-102 Temporary Air and Water Pollution, Soil Erosion and Siltation Control Item C-105 Mobilization Item P-101 Surface Preparation Item P-152 Excavation, Subgrade, and Embankment Item P-154 Subbase Course Item P-208 Aggregate Base Course Item P-401 Asphalt Mix Pavement Item P-603 Emulsified Asphalt Tack Coat Item P-610 Structural Portland Cement Concrete Item P-620 Runway and Taxiway Marking Item L-110 Airport Underground Electrical Duct Banks and Conduits Item L-115 Electrical Manholes and Junction Structures If Modifications to the FAA Standard Specifications seem justified, the modifications will be thoroughly reviewed with the FAA at this point and if the FAA concurs, the modifications will be placed in the design report and the final specification manual.
Prepare Technical Specifications. The CONSULTANT will prepare Technical Specifications using FAA Standard Specifications and FAA Specification format whenever possible. For work not covered by FAA Standards, Standard Specifications developed from Department of Transportation standards and local requirements shall be used. The following lists the predicted Technical Specifications that will be included: P-608 Emulsified Asphalt Seal Coat P-620 Runway and Taxiway Marking
Prepare Technical Specifications. Technical specifications will be prepared for the construction contract. The document shall include a comprehensive table of contents followed by technical specifications to be included in the Construction Documents.
