Common use of Project Costs Clause in Contracts

Project Costs. A. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving Group I federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date November 4, 2015 the maximum amount according to the TIP dated October 29, 2015 is $ 1,041,900.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving Group I Safety federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 90% of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, January 18, 2017, the maximum amount according to the TIP dated November 10, 2015 is $ 601,453.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: X Preliminary Engineering or Right-of-Way or Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials221,936.80. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: X Preliminary Engineering or Right-of-Way or Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials312,720.00. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: Right-of-Way or Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials$ . D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving Group I federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, November 30, 2016, the maximum amount according to the TIP dated November 30, 2016 is $ 1,467,719.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: Preliminary Engineering or X Right-of-Way or Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ 80,000.00. C. D. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. E. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. F. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. G. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. H. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. I. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: Preliminary Engineering or Right-of-Way or X Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving Group I federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80 % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, November 18, 2019, the maximum amount according to the TIP dated July 19, 2019 is $ 5,680,000.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials$ . D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: Right-of-Way or Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving Multiple (CMAQ, STP, TA, STBG) federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80 % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, January 2, 2020, the maximum amount according to the TIP dated November 15, 2019 is $ 1,305,220.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials$ . D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: Preliminary Engineering or Right-of-Way or X Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving Group I federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80 % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, December 3, 2019, the maximum amount according to the TIP dated July 19, 2019 is $ 4,250,000.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials$ . D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: B. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s 's Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. C. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials1,027,332.40. D. The LPA understands and agrees that it is INDOT’s 's policy to only allow non-non- discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-federal- aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D A-1 of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Every project must have a project end date based upon the reasonable timeframe for the project phase to be completed. If a project end date lapses, the project is no longer eligible for federal reimbursement in accordance with 2 CFR 200. See ▇▇▇▇▇://▇▇▇.▇▇.▇▇▇/indot/2833.htm. I. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s 's or the LPA’s 's records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving Demonstration federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date August 10, 2015 the maximum amount according to the TIP dated 7/1/2015 is $ 899,899.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving Group II federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, February 19, 2019, the maximum amount according to the TIP dated February 15, 2019 is $ 55,000.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving Group II CMAQ federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, March 12, 2018, the maximum amount according to the TIP dated August 24, 2017 is $ 320,000.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving Group II CMAQ federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, August 11, 2016, the maximum amount according to the TIP dated April 11, 2016 is $ 300,000.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: X Preliminary Engineering or Right-of-Way or Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal funds allocated to the project is $is C. D. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. E. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. F. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. G. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. H. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. I. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. This contract is just for the one (1) phase checked below: Preliminary Engineering or Right-of-Way or X Construction; Otherwise, this contract covers all phases. B. If the Program shown on Attachment A is receiving federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, , the maximum amount according to the TIP dated is $ . The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. C. Federal-aid Funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal funds allocated to the project is $ C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials1,312,000.00. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract

Project Costs. A. If the Program shown on Attachment A is receiving Group II federal-aid funds for the project, the LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. Any adjustments (positive or negative) to the dollar amount listed in the TIP, or any increase or decrease in the funding from a prior year, authorized by the MPO that may not be reflected in the current TIP, are hereby considered adjustments to the contract between the LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project costs. The maximum amount of federal-aid funds allocated to the Project is dependent upon the current TIP allocation. As of this date date, May 1, 2017, the maximum amount according to the TIP dated February 16, 2017 is $ 248,000.00. The most current MPO TIP page, or MPO authorization, is uploaded into INDOT’s Scheduling Project Management System (SPMS). B. Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the eligible Project costs. The maximum amount of federal funds allocated to the project is $$ . C. The LPA understands and agrees that in accordance with I.C. 8-23-2-14, INDOT retains 2.5% of the final construction costs for oversight of construction inspection and the testing of construction materials. D. The LPA understands and agrees that it is INDOT’s policy to only allow non-discretionary changes to a Project scope after bidding. Changes to the Project scope after bidding that are by the choice of the LPA and are not required to complete the Project will not be eligible for federal-aid funds and must be funded 100% locally. E. The LPA understands and agrees that the federal-aid funds allocated to the Project are intended to accomplish the original scope of the Project as designed. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the Local Program. F. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. If the Project bid prices are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining balance of federal-aid funds will revert back to the MPO. G. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in a document (which specifically references section I.D. of Attachment D of this contract) signed by an authorized representative of INDOT, the Indiana Department of Administration, State Budget Agency, and the Attorney General of Indiana. H. Costs will be eligible for FHWA participation provided that the costs: (1) Are for work performed for activities eligible under the section of title 23, U.S.C., applicable to the class of funds used for the activities; (2) Are verifiable from INDOT’s or the LPA’s records; (3) Are necessary and reasonable for proper and efficient accomplishment of project objectives and meet the other criteria for allowable costs in the applicable cost principles cited in 49 CFR section 18.22; (4) Are included in the approved budget, or amendment thereto; and (5) Were not incurred prior to FHWA authorization.

Appears in 1 contract

Sources: Local Public Agency Project Coordination Contract