Projected Traffic Volumes. The Engineer shall develop the traffic projections for the significant roadway segments and cross streets within the study corridor, based on the approved methodology. The projected traffic data includes: DocuSign Envelope ID: 0FF49D32-D279-4718-B36E-004C4194E751 DocuSign Envelope ID: 33059790-9D6A-4832-8E47-37328128C4A4 Contract No. 36-6IDP5430 PeopleSoft Contract No. 5682 1) Annualized Average Daily Traffic (AADT) and Design Hourly Volume (DHV) for all proposed facilities in the corridor, including main lanes, ramps, direct connectors, intersections, and frontage roads 2) Percent of trucks for both the AADT and DHV 3) Directional distribution 4) K factor (DHV/AADT) 5) Vehicle classification-light duty, medium duty and heavy duty
Appears in 1 contract
Samples: Contract for Engineering Services
Projected Traffic Volumes. The Engineer shall develop the traffic projections for the significant roadway segments and cross streets within the study corridor, based on the approved methodology. The projected traffic data includes: DocuSign Envelope ID: 0FF49D3204C16B52-D2796FE2-47184CCA-85E1-B36E-004C4194E751 65F1BBF3295C DocuSign Envelope ID: 330597904ADCA196-9D6A-4832070B-414B-84B9-8E47-37328128C4A4 71706552ABDA Contract No. 36-6IDP5430 6IDP5366 PeopleSoft Contract No. 56825681
1) Annualized Average Daily Traffic (AADT) and Design Hourly Volume (DHV) for all proposed facilities in the corridor, including main lanes, ramps, direct connectors, intersections, and frontage roads
2) Percent of trucks for both the AADT and DHV
3) Directional distribution
4) K factor (DHV/AADT)
5) Vehicle classification-light duty, medium duty and heavy duty
Appears in 1 contract
Samples: Contract for Engineering Services
Projected Traffic Volumes. The Engineer shall develop the traffic projections for the significant roadway segments and cross streets within the study corridor, based on the approved methodology. The projected traffic data includes: DocuSign Envelope ID: 0FF49D32FDEAC86F-5E2C-4774-D27980F7-4718-B36E-004C4194E751 D16ABCDC6AED DocuSign Envelope ID: 33059790BD8C3DAD-658B-42FA-9D6A-4832BFD0-8E47-37328128C4A4 FFECD08D31CF Contract No. 36-6IDP5430 6IDP5371 PeopleSoft Contract No. 56825690
1) Annualized Average Daily Traffic (AADT) and Design Hourly Volume (DHV) for all proposed facilities in the corridor, including main lanes, ramps, direct connectors, intersections, and frontage roads
2) Percent of trucks for both the AADT and DHV
3) Directional distribution
4) K factor (DHV/AADT)
5) Vehicle classification-light duty, medium duty and heavy duty
Appears in 1 contract
Samples: Contract for Engineering Services
Projected Traffic Volumes. The Engineer shall develop the traffic projections for the significant roadway segments and cross streets within the study corridor, based on the approved methodology. The projected traffic data includes: DocuSign Envelope ID: 0FF49D32BC9C016B-5A52-D27945C4-4718B28D-B36E-004C4194E751 A91989A94E2D DocuSign Envelope ID: 33059790DEE8D1E1-9D6A-4832E43A-4EEA-8FC1-8E47-37328128C4A4 F207966DDF38 Contract No. 36-6IDP5430 6IDP5368 PeopleSoft Contract No. 56825683
1) Annualized Average Daily Traffic (AADT) and Design Hourly Volume (DHV) for all proposed facilities in the corridor, including main lanes, ramps, direct connectors, intersections, and frontage roads
2) Percent of trucks for both the AADT and DHV
3) Directional distribution
4) K factor (DHV/AADT)
5) Vehicle classification-light duty, medium duty and heavy duty
Appears in 1 contract
Samples: Contract for Engineering Services
Projected Traffic Volumes. The Engineer shall develop the traffic projections for the significant roadway segments and cross streets within the study corridor, based on the approved methodology. The projected traffic data includes: DocuSign Envelope ID: 0FF49D32D3D386F2-D2799BB1-471846C4-B36E-004C4194E751 A6B5-298DBCC339A1 DocuSign Envelope ID: 33059790289281F7-9D6A-483243A6-8E474F0C-37328128C4A4 BC8B-BFB572B13384 Contract No. 36-6IDP5430 6IDP5376 PeopleSoft Contract No. 56825675
1) Annualized Average Daily Traffic (AADT) and Design Hourly Volume (DHV) for all proposed facilities in the corridor, including main lanes, ramps, direct connectors, intersections, and frontage roads
2) Percent of trucks for both the AADT and DHV
3) Directional distribution
4) K factor (DHV/AADT)
5) Vehicle classification-light duty, medium duty and heavy duty
Appears in 1 contract
Samples: Contract for Engineering Services