Proposed Project. Select and complete ONE of the following descriptions of your project and cross out other information as appropriate: The Proposed Project is the connection of (Project Description) with a generating capacity of (Size in kilowatts (kW) or megawatts (MW)) located at (Project Municipal Address) (the “Generation Facility”) to Hydro One’s distribution system at (Location) with a feeder voltage of (Feeder Voltage) kVA and Feeder Operating Designation of (Feeder Operating Designation). OR The Proposed Project is the connection of (Project Description) with generating capacity of (Size in kilowatts (kW) or megawatts (MW)), located at (Project Municipal Address) (the “Generation Facility”) to the Customer’s distribution system which is connected to Hydro One’s (Name of Transmission Station) Transmission Station, with an LV breaker operating designation of (LV breaker operating designation) OR Hydro One’s distribution system at (Location) with a feeder voltage of (Feeder Voltage) kVA and a feeder operating designation (Feeder Operating Designation).
Appears in 4 contracts
Samples: Assessment Study Agreement, Assessment Study Agreement, Assessment Study Agreement