Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal Building Operating Hours (at times determined by Landlord), and Tenant shall provide the Building manager with at least two Business Days’ notice prior to proceeding with any such work. 2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security. 3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant. 4. Under no circumstances will any material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager. 5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision. 6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times. 7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process. 8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations. 9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative. 10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, any items to be removed from the Premises during the construction of the Alterations. 11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense. 12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed. 13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose. 14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building. 15. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 4 contracts
Samples: Lease Agreement (Cerecor Inc.), Lease Agreement (RMR Group Inc.), Lease Agreement (Reit Management & Research Inc.)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal Building Operating Hours (at times determined by Landlord)in a time and manner least disruptive to other tenants, and Tenant shall provide the Building manager with at least two Business Days’ ' notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s 's contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s 's contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any material related to Tenant’s 's Alterations be allowed access through the Building’s 's front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s 's representative at Tenant’s 's expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s 's supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s 's representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s 's expense, any items to be removed from the Premises during the construction of the Alterations.
11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s 's expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s 's name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.
15. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s 's Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 3 contracts
Samples: Lease Agreement (EPIX Pharmaceuticals, Inc.), Lease (Predix Pharmaceuticals Holdings Inc), Lease (EPIX Pharmaceuticals, Inc.)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience disturb other tenants or disturb of the Building operations be scheduled and performed before on weekends or after Normal Building Operating Hours (at times determined by Landlord), normal working hours. and Tenant shall provide the Building manager with at least two Business Days’ ' notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top Alterations costing in excess of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations $10,000 shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
83. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building Premises HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
94. Construction debris shall be stored in appropriate containers and removed from the construction area daily on a regular basis and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative's Construction Representative.
105. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s 's expense, any items to be removed from the Premises during the construction of the Alterations.
116. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s 's expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
147. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the BuildingComplex.
158. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform substantially conform, in any material respect, to Tenant’s 's Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s Landlord's sole expense and unless Landlord reasonably determines that Tenant's Alterations do not conform to Tenant's Design Submission, in which case Tenant shall pay pay, as Additional Rent, Landlord’s 's reasonable charges for such supervision and inspectioncosts of all future supervision.
Appears in 2 contracts
Samples: Lease Agreement (Dexcom Inc), Lease Agreement (Dexcom Inc)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal Building Operating Hours (at times determined by Landlord), ) and Tenant shall provide the Building manager with at least two Business Days’ notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional additional, cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded padded, and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any persons or material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is requiredrequired (except for any shutdown or work to the HVAC or sprinkler systems described on Tenant’s Plans, as such term is defined in the Lease), such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, any items to be removed from the Premises during the construction of the Alterations.
11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in COMMERCIAL LEASE (MASTER SUBLEASE FORM) PAGE 32 OF 37 WAINSHAL MILL LEASING COMPANY LLC TO RRCC REALTY, LLC writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction construction, personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.
1514. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 2 contracts
Samples: Commercial Lease, Commercial Lease (FusionStorm Global, Inc.)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenantstenants of the Building without their consent. If Landlord determines in good faith that any demolition or other work of Tenant (performed in an area that is proximate to Suite 600 or any other suite occupied by another tenant) is likely to disturb or interfere with other tenants of the Building, Landlord may require that all demolition and other categories of such work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after outside of Normal Building Operating Hours (at times determined by Landlord)Hours, and Tenant shall provide the Building manager with at least two Business Days’ notice prior to proceeding with any such work, provided that Landlord shall not require such work to be performed outside of Normal Building Operating Hours if Tenant shall have made arrangements with the affected tenant(s) to perform such work at times acceptable to such other tenant(s).
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and securityIntentionally deleted.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by TenantIntentionally deleted.
4. Under no circumstances will any material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, any items to be removed from the Premises during the construction of the Alterations.
11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.
15. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such In the event it is determined that any Alterations are not in accordance with this Lease or Tenant’s Design Submission, such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 2 contracts
Samples: Lease Agreement (AxoGen, Inc.), Lease Agreement (AxoGen, Inc.)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenantstenants of the Building without their consent. If Landlord determines in good faith that any demolition or other work of Tenant (performed in an area that is proximate to Suite 600 or any other suite occupied by another tenant) is likely to disturb or interfere with other tenants of the Building, Landlord may require that all demolition and other categories of such work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after outside of Normal Building Operating Hours (at times determined by Landlord)Hours, and Tenant shall provide the Building manager with at least two Business Days’ notice prior to proceeding with any such work, provided that Landlord shall not require such work to be performed outside of Normal Building Operating Hours if Tenant shall have made arrangements with the affected tenant(s) to perform such work at times acceptable to such other tenant(s).
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and securityIntentionally deleted.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by TenantIntentionally deleted.
4. Under no circumstances will any material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx fxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, any items to be removed from the Premises during the construction of the Alterations.
11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.
15. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such In the event it is determined that any Alterations are not in accordance with this Lease or Tenant’s Design Submission, such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 1 contract
Samples: Lease Agreement (AxoGen, Inc.)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience disturb other tenants or disturb of the Building operations be scheduled and performed before on weekends or after Normal Building Operating Hours (at times determined by Landlord), normal working hours. and Tenant shall provide the Building manager with at least two Business Days’ notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top Alterations costing in excess of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations $10,000 shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
83. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building Premises HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
94. Construction debris shall be stored in appropriate containers and removed from the construction area daily on a regular basis and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representativeConstruction Representative.
105. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, any items to be removed from the Premises during the construction of the Alterations.
116. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
147. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the BuildingComplex.
158. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform substantially conform, in any material respect, to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at TenantLandlord’s sole expense and unless Landlord reasonably determines that Tenant’s Alterations do not conform to Tenant’s Design Submission, in which case Tenant shall pay pay, as Additional Rent, Landlord’s reasonable charges for such supervision and inspectioncosts of all future supervision.
Appears in 1 contract
Samples: Lease Agreement (Dexcom Inc)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal Building Operating Hours (at times determined by Landlord), ) and Tenant shall provide the Building manager with at least two Business Days’ 24 hours' notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s 's contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s 's contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any persons or material related to Tenant’s 's Alterations be allowed access through the Building’s 's front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s 's representative at Tenant’s 's expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s 's supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s 's representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s 's expense, any items to be removed from the Premises during the construction of the Alterations.
11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s 's expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.
15. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 1 contract
Samples: Lease (Perficient Inc)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal normal Building Operating Hours operating hours (at times reasonably determined by Landlord), and Tenant shall provide the Building manager with at least two Business Days24 hours’ notice prior to proceeding with any such work.
2. Unless Landlord directs otherwiseSubject to Landlord’s reasonable scheduling requirements, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If if Tenant’s contractors desire access to the Building at any times other timethan normal business hours, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost reasonably incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any persons or material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All To the extent applicable for the type of work to be performed, all areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The To the extent applicable for the type of work to be performed, the General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, any items to be removed from the Premises during the construction of the Alterations[Intentionally Deleted].
11. Tenant, either directly or through the General Contractor, will immediately as soon as reasonably possible notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense.
12. Construction personnel shall use the restrooms located within the Tenant’s Premises only. If there are no restrooms within the Tenant’s Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.
1514. Landlord shall have the right to supervise and inspect the Alterations as the work progresses (and Landlord will use reasonable efforts to minimize interference with such construction activities), and, if applicable, to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 1 contract
Samples: Lease (Wiley John & Sons, Inc.)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal Building Operating Hours (at times determined by Landlord), and Tenant shall provide the Building manager with at least two Business Days’ notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
52. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
63. Alterations shall be performed under the supervision of a superintendent superintendent, project manager or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris4. All floors shall be protected from the construction process.
85. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
96. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building except in trash containers without the prior written approval of the Landlord’s representative.
107. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, Landlord any items to be removed from the Premises during the construction of the AlterationsAlterations excluding any items owned by Tenant.
118. Tenant, either directly or through the General Contractor, will immediately promptly notify Landlord, in writing, of any material damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expensepromptly.
129. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within only or facilities provided by the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performedGeneral Contractor.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.
1510. Landlord shall have the right at reasonable times and with prior notice to supervise and Tenant to inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not materially conform to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspectioninspection if any corrective action of Tenant shall be required as a result.
Appears in 1 contract
Samples: Lease (Surgalign Holdings, Inc.)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal Building Operating Hours (at times determined by Landlord), and Tenant shall provide the Building manager with at least two Business Days’ notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expenseexpense and shall be performed only at such times as shall be permitted by Landlord’s representative. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations. The smoke and fire detectors in the Premises shall also be protected from dust and cleaned as necessary, as approved by Landlord.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. Any construction debris containing Hazardous Materials shall be removed, stored, transported and disposed of in strict compliance with Environmental Laws. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, any items to be removed from the Premises during the construction of the Alterations.
11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations , of the Building.
15. Landlord or its designee shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 1 contract
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenantstenants other than disturbance of a de minimis nature. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal Building Operating Hours (at times determined by Landlord), and Tenant shall provide the Building manager with at least two Business Days24 hours’ notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost actually incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any persons or material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, any items to be removed from the Premises during the construction of the Alterations.
11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours (or such longer time period as is reasonably necessary) unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense.
12. Construction personnel shall use the restrooms located within the Tenant’s Premises only. If there are no restrooms within the Tenant’s Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.
1514. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspection.
Appears in 1 contract
Samples: Lease (Liquid Holdings Group, Inc.)
Prosecution of the Work. 1. All construction activities shall be conducted so as to avoid disturbance of other tenants. Landlord may require that all demolition and other categories of work that may inconvenience other tenants or disturb Building operations be scheduled and performed before or after Normal Building Operating Hours (at times determined by Landlord), and Tenant shall provide the Building manager with at least two Business Days’ notice prior to proceeding with any such work.
2. Unless Landlord directs otherwise, Tenant’s contractors shall have access to the Building during the Normal Building Operating Hours only. If Tenant’s contractors desire access to the Building at any other time, Landlord shall use reasonable efforts to provide such access, provided, however, that Tenant shall pay Landlord any additional cost incurred by Landlord to provide such access, including, without limitation, additional costs for utilities, personnel, and security.
3. Prior arrangements for elevator use shall be made with the Building manager by Tenant or the General Contractor. Elevator cabs shall be properly padded and no material or {B2323618; 13} equipment shall be carried under or on top of elevators. If an operating engineer is required by any union rules, such engineer shall be paid for by Tenant.
4. Under no circumstances will any material related to Tenant’s Alterations be allowed access through the Building’s front entrance without advance written approval of the Building manager.
5. If shutdown of risers and mains for electrical, HVAC, sprinkler or plumbing work is required, such work shall be supervised by Landlord’s representative at Tenant’s expense. No work will be performed in Building mechanical equipment rooms except under Landlord’s supervision.
6. Alterations shall be performed under the supervision of a superintendent or xxxxxxx of the General Contractor at all times.
7. All areas adjacent to the construction area shall be sealed with plastic so as to not be affected by dust and debris. All floors shall be protected from the construction process.
8. The General Contractor or HVAC subcontractor shall block off supply and return grilles, diffusers and ducts to keep dust from entering into the Building HVAC system and thoroughly clean all HVAC units in the work area at the completion of the Alterations.
9. Construction debris shall be removed from the construction area daily and the construction area shall be kept neat and reasonably clean at all times. All construction debris is to be discarded in waste containment provided by the General Contractor only. No material or debris shall be stored outside the Premises or Building without the prior written approval of the Landlord’s representative.
10. Landlord shall have the right to instruct the General Contractor to deliver to Landlord, at Tenant’s expense, Landlord any items to be removed from the Premises during the construction of the AlterationsAlteration provided that Landlord provides notice to Tenant and pays the full cost of delivering such items to Landlord.
11. Tenant, either directly or through the General Contractor, will immediately notify Landlord, in writing, of any damage to the Building caused by the General Contractor or any subcontractors. Such damage shall be repaired within 72 hours unless otherwise directed by the Landlord in writing. Any damage that is not repaired may be repaired by Landlord at Tenant’s expense.
12. Construction personnel shall use the restrooms located within the Premises only. If there are no restrooms within the Premises, then construction personnel shall use only those Building restrooms located on the floor where the work is being performed.
13. All wiring and cabling installed by Tenant shall be tagged with Tenant’s name and its specific use and purpose.
14. The General Contractor and all subcontractors shall cause their employees to adhere to all applicable Rules and Regulations of the Building.. {B2323618; 13}
15. Landlord shall have the right to supervise and inspect the Alterations as the work progresses and to require Tenant to remove or correct any aspect of the Alterations that does not conform to Tenant’s Design Submission approved by Landlord. Such supervision and inspection shall be at Tenant’s sole expense and Tenant shall pay Landlord’s reasonable charges for such supervision and inspectioninspection (which shall be limited to the one percent (1%) fee provided for in Section 3.2(d) of the Lease, and which shall not be due with respect to Alterations the cost of which (together with any related matter) is less than $10,000.00; provided, however, that Section 3.2(d) shall control with respect to Tenant’s Work).
Appears in 1 contract