We use cookies on our site to analyze traffic, enhance your experience, and provide you with tailored content.

For more information visit our privacy policy.

Common use of Protection SUF at Xxxxxxx Substation Clause in Contracts

Protection SUF at Xxxxxxx Substation. The Connecting Transmission Owner will replace the existing 953 line relaying and install second set of current transformers on Breaker 95362. These system upgrades include the installation of two groups of line relays with addition of a new panel and the installation of current transformers. a. Developer to perform the following work at the Xxxxxxx Substation:  Engineer and procure the relay switchboard panels.  Engineer and procure the installation of (3) CT’s  Engineer and procure all control cables.  Engineer, all in-ground. This includes all foundations, as well as conduits, trench, and grounding. b. Connecting Transmission Owner will perform the following work at the Xxxxxxx Substation:  Procure and construct, all in-ground. This includes all foundations, as well as conduits, trench, and grounding.  Install and terminate control cables at the substation equipment and at the control house termination cabinet.  Install and wire new (3) CT’s.  Install relay switchboard panels at Xxxxxxx Substation.

Appears in 4 contracts

Samples: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement

AutoNDA by SimpleDocs

Protection SUF at Xxxxxxx Substation. The Connecting Transmission Owner will replace the existing 953 line relaying and install second set of current transformers on Breaker 95362. These system upgrades include the installation of two groups of line relays with addition of a new panel and the installation of current transformers. a. Developer to perform the following work at the Xxxxxxx Substation: Engineer and procure the relay switchboard panels. Engineer and procure the installation of (3) CT’s Engineer and procure all control cables. Engineer, all in-ground. This includes all foundations, as well as conduits, trench, and grounding. b. Connecting Transmission Owner will perform the following work at the Xxxxxxx Substation: Procure and construct, all in-ground. This includes all foundations, as well as conduits, trench, and grounding. Install and terminate control cables at the substation equipment and at the control house termination cabinet. Install and wire new (3) CT’s. Install relay switchboard panels at Xxxxxxx Substation.

Appears in 3 contracts

Samples: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!