Pulling Cable Sample Clauses

Pulling Cable. In Power, a crew pulling underground cables with power shall include 26 not less than two (2) cable splicers and shall be supervised by a Cable Splicer Crew Chief. In Rail, 27 the pulling of underground cables with power equipment will include no less than two (2) Rail 28 Electrical Workers supervised by a temporary Lead Rail Electrical Worker.
AutoNDA by SimpleDocs

Related to Pulling Cable

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Testing Capabilities 7.2.2.10.2.1 LIS Acceptance Testing is provided where equipment is available, with the following test lines: seven-digit access to balance (100 type), milliwatt (102 type), nonsynchronous or synchronous, automatic transmission measuring (105 type), data transmission (107 type), loop-around, short circuit, open circuit, and non-inverting digital loop-back (108 type), and such other acceptance testing that may be needed to ensure that the service is operational and meets the applicable technical parameters.

  • FTTP Loop A Loop consisting entirely of fiber optic cable, whether dark or lit, that extends from the main distribution frame (or its equivalent) in an end user’s serving End Office to the demarcation point at the end user’s customer premises or to a serving area interface at which the fiber optic cable connects to copper or coaxial distribution facilities that extend to the end user's customer premises demarcation point, provided that all copper or coaxial distribution facilities extending from such serving area interface are not more than 500 feet from the demarcation point at the respective end users' customer premises; provided, however, that in the case of predominantly residential multiple dwelling units (MDUs), an FTTP Loop is a Loop consisting entirely of fiber optic cable, whether dark or lit, that extends from the main distribution frame (or its equivalent) in the End Office that serves the multiunit premises: (a) to or beyond the multiunit premises’ minimum point of entry (MPOE), as defined in 47 C.F.R. § 68.105; or

  • wire HDSL-Compatible Loop This is a designed Loop that meets Carrier Serving Area (CSA) specifications, may be up to 12,000 feet long and may have up to 2,500 feet of bridged tap (inclusive of Loop length). It may be a 2-wire or 4-wire circuit and will come standard with a test point, OC, and a DLR.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Meter Reading At least once each Billing Period, the Servicer shall obtain usage measurements from the Applicable MDMA for each Consumer; provided, however, that the Servicer may estimate any Consumer’s usage determined in accordance with applicable CPUC Regulations and Servicer Policies and Practices; and, provided, further, that the Servicer may obtain usage measurements from the Applicable ESP for Consumers receiving services from such ESP if the respective ESP Service Agreement so provides.

  • -wire ADSL-Compatible Loop This is a designed Loop that is provisioned according to Revised Resistance Design (RRD) criteria and may be up to 18,000 feet long and may have up to 6,000 feet of bridged tap (inclusive of Loop length). The Loop is a 2-wire circuit and will come standard with a test point, OC, and a DLR.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • -wire Unbundled Digital/DS0 Loop These are designed 4-wire Loops that may be configured as 64kbps, 56kbps, 19kbps, and other sub-rate speeds associated with digital data services and will come standard with a test point, OC, and a DLR.

Time is Money Join Law Insider Premium to draft better contracts faster.