Pump and Pumping Unit Tests Sample Clauses

Pump and Pumping Unit Tests. Each pump shall be factory tested for performance and hydrostatic pressure as specified in ANSI/HI 14.6, including NPSHR characteristics as specified in that standard. However, if impeller diameter reduction is required to adjust pump performance to the tolerances specified in ANSI/HI 14.6, the pump shall be retested.
AutoNDA by SimpleDocs

Related to Pump and Pumping Unit Tests

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • TREE TRIMMING The Licensee shall have authority to trim trees upon and overhanging public streets, alleys, sidewalks and ways and places of the Town so as to prevent the branches of such trees from coming in contact with the wires, cables and equipment of the Licensee, in accordance with applicable state law and any Town bylaws/ordinances and regulations.

  • Clearcutting Units All trees that meet Utilization Standards within “Clearcutting Units” are designated for cutting.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Modern Slavery You hereby affirm your compliance with the Modern Slavery Xxx 0000 and associated guidance. You confirm (a) that you have read, are familiar with and shall not perform an act or omission which is in contravention with, the letter or spirit of the Act; and (b) you carry out regular, meaningful and comprehensive due diligence procedures and have internal policies in place to address any suspected human rights abuse in your business and Group where applicable.

  • Direct Trunked Transport 7.3.2.1 Either Party may elect to purchase direct trunked transport from the other Party.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • New Member Orientation The Employer will notify the Union of any newly represented temporary employees. The Union will be given the opportunity to have a Union representative speak with the newly represented temporary employees for not more than thirty (30) minutes to provide information about the Union and this Agreement.

  • Standard Samples Bid Specifications may indicate that the Product to be purchased must be equal to a standard sample on display in a place designated by the Commissioner and such sample will be made available to the Bidder for examination prior to the opening date. Failure by the Bidder to examine such sample shall not entitle the Bidder to any relief from the conditions imposed by the Bid Specifications.

Time is Money Join Law Insider Premium to draft better contracts faster.