Pure Sine Wave ON‐Grid Single Phase Inverters Sample Clauses

Pure Sine Wave ON‐Grid Single Phase Inverters. Supply, installation and testing of Pure Sine Wave SP Inverters (suitable for 5kW load) compatible to Utility SP voltage 220‐240V, Working temperature 0°C ‐ 55°C and full range of battery voltage, comprising AC to DC, DC to AC invertors, battery charger, transfer switch, solar power charger (MPPT) etc complete in all respect, complying to international safety standards including IEC 60529.
AutoNDA by SimpleDocs

Related to Pure Sine Wave ON‐Grid Single Phase Inverters

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Terminating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • WSIB Top-Up a) Teachers who, as of August 31, 2014, were entitled to Workplace Safety and Insurance Board benefits top-up, such entitlement shall be as follows:

  • Requirement to Have a Single Audit The Subrecipient will complete the Subrecipient Annual Report annually within 45 days after its fiscal year end, informing the State of Vermont whether or not a Single Audit is required for the prior fiscal year. If a Single Audit is required, the Subrecipient will submit a copy of the audit report to the granting Party within 9 months. If a single audit is not required, only the Subrecipient Annual Report is required. For fiscal years ending before December 25, 2015, a Single Audit is required if the subrecipient expends $500,000 or more in Federal assistance during its fiscal year and must be conducted in accordance with OMB Circular A-133. For fiscal years ending on or after December 25, 2015, a Single Audit is required if the subrecipient expends $750,000 or more in Federal assistance during its fiscal year and must be conducted in accordance with 2 CFR Chapter I, Chapter II, Part 200, Subpart F. The Subrecipient Annual Report is required to be submitted within 45 days, whether or not a Single Audit is required.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Dienste Und Materialien Von Drittanbietern (a) Die Apple-Software gewährt möglicherweise Zugang zu(m) iTunes Store, App Store, Apple Books, Game Center, iCloud, Karten von Apple und zu anderen Diensten und Websites von Apple und Drittanbietern (gemeinsam und einzeln als „Dienste“ bezeichnet). Solche Dienste sind möglicherweise nicht in xxxxx Sprachen oder in xxxxx Ländern verfügbar. Die Nutzung dieser Dienste erfordert Internetzugriff und die Nutzung bestimmter Dienste erfordert möglicherweise eine Apple-ID, setzt möglicherweise dein Einverständnis mit zusätzlichen Servicebedingungen voraus und unterliegt unter Umständen zusätzlichen Gebühren. Indem du diese Software zusammen mit einer Apple-ID oder einem anderen Apple-Dienst verwendest, erklärst du dein Einverständnis mit den anwendbaren Servicebedingungen für diesen Dienst, z. B. den neuesten Apple Media Services-Bedingungen für das Land, in dem du auf diese Services zugreifst, die du über die Webseite xxxxx://xxx.xxxxx.xxx/legal/ internet-services/itunes/ anzeigen und nachlesen kannst

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Global Access Transport Charges (U S. Bridged): Per-minute per-bridge port usage charges, based on availability of service, zone and origination access type. Bridging charges are additional and are priced at Customer's applicable Toll Meet Meet-Me Access rate per minute. Freephone (IFN) Transport Zone A – G. Discounts:

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.