Pv Power Plant Hardware Sample Clauses

Pv Power Plant Hardware 
AutoNDA by SimpleDocs

Related to Pv Power Plant Hardware

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • Plant and Equipment The plants, structures and ------------------- equipment of the Company are structurally sound with no known defects and are in good operating condition and repair and are adequate for the uses to which they are being put. None of such plants, structures or equipment are in need of maintenance or repairs except for ordinary, routine maintenance and repairs which are not material in nature or cost. The Company has not received notification that it is in violation of any applicable building, zoning, anti- pollution, health or other law, ordinance or regulation in respect of its plants or structures or their operations.

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Fixtures and Equipment Each of the Company and its Subsidiaries (as applicable) has good title to, or a valid leasehold interest in, the tangible personal property, equipment, improvements, fixtures, and other personal property and appurtenances that are used by the Company or its Subsidiary in connection with the conduct of its business (the “Fixtures and Equipment”). The Fixtures and Equipment are structurally sound, are in good operating condition and repair, are adequate for the uses to which they are being put, are not in need of maintenance or repairs except for ordinary, routine maintenance and repairs and are sufficient for the conduct of the Company’s and/or its Subsidiaries’ businesses (as applicable) in the manner as conducted prior to the Closing. Each of the Company and its Subsidiaries owns all of its Fixtures and Equipment free and clear of all Liens except for (a) liens for current taxes not yet due and (b) zoning laws and other land use restrictions that do not impair the present or anticipated use of the property subject thereto.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

Time is Money Join Law Insider Premium to draft better contracts faster.