QFCP Tariff Sample Clauses

QFCP Tariff. Operator represents and warrants to Owner that, during the Term, the Portfolio shall not fail to receive full payment and service under the Tariffs for any of the following reasons: (i) Operator shall not remain a Qualified Fuel Cell Provider throughout the original term of the QFCP Tariff. (ii) Operator shall take any action which causes or is likely to cause: (i) Owner not to qualify (or lose qualification) for service under the QFCP Tariff or (ii) the Portfolio not to qualify (or lose qualification) as a Qualified Fuel Cell Project. (iii) Operator shall have not complied with any of its obligations under the Letter Agreement (including, if so required by the State of Delaware, posting the security referred to in the Letter Agreement upon or prior to the Commencement of Operation of the first Bloom System).
AutoNDA by SimpleDocs

Related to QFCP Tariff

  • Tariff 2.95.1 Any applicable Federal or state tariff of a Party, as amended from time- to-time; 2.95.2 Any standard agreement or other document, as amended from time-to- time, that sets forth the generally available terms, conditions and prices under which a Party offers a Service. The term “Tariff” does not include any Verizon statement of generally available terms (SGAT) which has been approved or is pending approval by the Commission pursuant to Section 252(f) of the Act.

  • APPLICABLE TARIFF 9.1 Subsequent to commencement of power supply by the RPD on the terms contained in this Agreement, the RPD shall be entitled to receive the tariff of Rs. /kWh [Insert the Tariff discovered through the bidding process conducted by SECI], fixed for the entire Term of this Agreement. 9.2 In cases of early commencement of power supply, till SCSD, the RPD will be free to sell the electricity generated to any entity other than the SECI/ Buying Entity(ies), only after giving the first right of refusal to the SECI/Buying Entity(ies). The Buying Entity(ies)/SECI shall provide refusal within 15 (fifteen) Days from the receipt of the request, beyond which it would be considered as deemed refusal. The 15-Day period will be applicable separately for SECI and the Buying Entity(ies). In case SECI/Buying Entity agree to purchase power from a date prior to the SCSD, such power shall be purchased at the Applicable Tariff plus SECI’s trading margin. 9.3 In case of multiple Project components, and in case one or more such component (wind or solar PV or any other RE power generating source) is ready for injection of power into the grid, but the remaining component is unable to commence power supply, the RPD will be allowed to commence power supply from such component which is ready, outside the ambit of this Agreement. Following should be noted under this scenario: (a) First right of refusal for such power shall vest with the Buying Entity(ies). Subsequent to refusal of such power by the Buying Entity(ies), the right of refusal shall vest with SECI. (b) In case SECI/Buying Entity(ies) decides to buy such discrete component’s power outside the PPA, such power shall be purchased at 50% of the Applicable Tariff. In case the same is procured through SECI, trading margin of Rs. 0.07/kWh will be applicable on such power procurement. (c) The above scenario will be applicable until the RPD commences supply of power to the Buying Entity(ies) under the provisions of this Agreement.

  • Uncontrollable Forces Tariff Provisions Section 14.1 of the CAISO Tariff shall be incorporated by reference into this Agreement except that all references in Section 14.1 of the CAISO Tariff to Market Participants shall be read as a reference to the Participating Generator and references to the CAISO Tariff shall be read as references to this Agreement.

  • Non-tariff Measures 1. A Party shall not adopt or maintain any non-tariff measures on the importation of any good of the other Party or on the exportation of any good destined for the territory of the other Party except in accordance with its WTO rights and obligations or in accordance with other provisions of this Agreement. 2. Each Party shall ensure its non-tariff measures permitted in paragraph 1 are not prepared, adopted or applied with a view to, or with the effect of, creating unnecessary obstacles to trade between the Parties.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • System for Award Management (XXX) Requirement Alongside a signed copy of this Agreement, Grantee will provide Florida Housing with a XXX.xxx proof of registration and Commercial and Government Entity (CAGE) number. Grantee will continue to maintain an active XXX registration with current information at all times during which it has an active award under this Agreement.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • RATE SCHEDULE The attached rate schedule (Exhibit A) limits the number of students that may be enrolled and maximum dollar amount of the contract. It may also limit the maximum number of students that can be provided specific services. Per Diem rates for students whose IEPs authorize less than a full instructional day may be adjusted proportionally. In such cases only, the adjustments in basic education rate shall be based on the required minimum number of minutes per grade level as noted in California Education Code Section 46200-46208. Special education and/or related services offered by CONTRACTOR, shall be provided by qualified personnel as per State and Federal law, and the codes and charges for such educational and/or related services during the term of this contract, shall be as stated in Exhibit A.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!