Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with the following: (i) a Construction Quality Plan; and (ii) a Service Quality Plan for each Project Co Service; (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical Requirements, the Final Commissioning Program and the Canadian Council on Health Service Accreditation (such reference being applicable only to the Service Quality Plans), or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 – Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH within 60 days following Financial Close. (d) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 – Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH not less than 90 days prior to the Substantial Completion Date. (e) All Quality Plans shall be subject to review by WGH pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (f) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (g) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

AutoNDA by SimpleDocs

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan, which may be incorporated into one document; and (ii) a Service Quality Plan for each Project Co Service; , (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Final Commissioning Program and the Canadian Council on Health Service Accreditation Canada (such reference being applicable only to the Service Quality Plans), or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH HRRH within 60 days following Financial Close. (de) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 - Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH not less than 90 days prior to the Substantial Completion Date. (ef) All Quality Plans shall be subject to review by WGH HRRH pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fg) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (gh) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan, which may be incorporated into one document; and (ii) a Service Quality Plan for each Project Co Service; , (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Final Commissioning Program and the Canadian Council on Health Service Accreditation Canada (such reference being applicable only to the Service Quality Plans), or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan shall, at a minimum, comply with the requirements of the outline of the Design Quality Plan attached as part of Schedule 11 - Design Quality Plan Outline and Construction Quality Plan Outline. Project Co shall submit its proposed Design Quality Plan to CAMH within 60 days following Financial Close. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH CAMH within 60 days following Financial Close. (de) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 - Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH CAMH not less than 90 days prior to the Substantial Completion Date. (ef) All Quality Plans shall be subject to review by WGH CAMH pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fg) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (gh) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan, which may be incorporated into one document; and (ii) a Service Quality Plan for each Project Co Service; , (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Final Commissioning Program and the Canadian Council on Health Service Accreditation (such reference being applicable only to the Service Quality Plans), or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH NHS within 60 days following Financial Close. (de) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 - Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH NHS not less than 90 days prior to the Substantial Completion Date. (ef) All Quality Plans shall be subject to review by WGH NHS pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fg) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (gh) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan, which may be incorporated into one document; and (ii) a Service Quality Plan for each Project Co Service; , (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Interim Commissioning Program, the Final Commissioning Program and the Canadian Council on Health Service Accreditation (such reference being applicable only to the Service Quality Plans), or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH WCH within 60 days following Financial Close. (de) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 - Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service in respect to WGH the Phase 1 Facility to WCH not less than 90 days prior to the Interim Completion Date for each Project Co Service in respect to the Phase 2 Facility to WCH not less than 90 days prior to the Substantial Completion Date. (ef) All Quality Plans shall be subject to review by WGH WCH pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fg) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (gh) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan, which may be incorporated into one document; (ii) Operational Policies, Procedures and Practices for each Project Co Service, including for each Project Co TIC Service; (iii) an Electronic Security System Integration Quality Plan; and (iiiv) a Service TIC Design Quality Plan for each Project Co Service; and a TIC Construction Quality Plan, which may be incorporated into one document, (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Final Commissioning Program and the Canadian Council on Health Service Accreditation (such reference being applicable only to the Service Quality Plans)Program, or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 9 - Design Quality Plan and Construction Quality Plan. The Design Quality Plan that is attached as part of Schedule 9 – Design Quality Plan and Construction Quality Plan shall include the TIC Design Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 – 9 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH IO within 60 days following Financial Close. The TIC Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the TIC Construction Quality Plan attached as part of Schedule 9 - Design Quality Plan and Construction Quality Plan. Project Co shall submit its proposed TIC Construction Quality Plan to IO within 60 days following Financial Close. (de) The Service Quality Plan Operational Policies, Procedures and Practices for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan Operational Policies, Procedures and Practices attached as Schedule 12 – Service Quality Plan 10 - Operational Policies, Procedures and Practices Outline. Project Co shall submit its proposed Service Quality Plan Operational Policies, Procedures and Practices for each Project Co Service to WGH IO not less than 90 days prior to the Substantial Completion Date. (e) All Quality Plans , except that proposed Operational Policies, Procedures and Practices for each Project Co TIC Service shall be subject submitted to review by WGH pursuant to Schedule IO in accordance with Section 10 - Review Procedure, and Project Co shall not be entitled to implement or cause of the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – FM Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (f) The Electronic Security System Integration Quality Plan shall, at minimum, comply with the requirements of the outline of the Electronic Security System Integration Quality Plan attached as Schedule 33 – Electronic Security System Integration Quality Plan. Project Co shall implement the submit its proposed Electronic Security System Integration Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (g) Where any aspect of the Project Operations is performed by more than one Plan for each Project Co Party, then this Section 13, in so far as relevant or appropriate Service to IO not less than 90 days prior to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordinglyTIC Completion Date.

Appears in 1 contract

Samples: Project Agreement

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan; and, which may be incorporated into one document; (ii) a Service Quality Plan for each Project Co Service; and (iii) an Electronic Security System Integration Quality Plan, (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Final Commissioning Program and the Canadian Council on Health Service Accreditation Canada (such reference being applicable only to the Service Quality Plans), or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH MHCP within 60 days following Financial Close. (de) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 - Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH MHCP not less than 90 days prior to the Substantial Completion Date. (ef) The Electronic Security System Integration Quality Plan shall, at minimum, comply with the requirements of the outline of the Electronic Security System Integration Quality Plan attached as Schedule 36 – Electronic Security System Integration Quality Plan. Project Co shall submit its proposed Electronic Security System Integration Quality Plan for each Project Co Service to MHCP not less than 90 days prior to the Substantial Completion Date. (g) All Quality Plans shall be subject to review by WGH MHCP pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fh) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (gi) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

AutoNDA by SimpleDocs

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan, which may be incorporated into one document; and (ii) a Service Quality Plan for each Project Co Service; , (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, each Phase Commissioning Program, the Final Commissioning Program and the Canadian Council on Health Service Accreditation Canada (such reference being applicable only to the Service Quality Plans), or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 11 – Design Quality Plan and Construction Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 – Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH Osler within 60 days following Financial Close. (de) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 – Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH not less than 90 days prior to the Substantial Completion Date. (ef) All Quality Plans shall be subject to review by WGH Xxxxx pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fg) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (gh) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly. (i) Project Co shall cause the Construction Contractor, at its sole cost and expense, to conduct an inspection of its facilities and of its health and safety management systems on an annual basis until Final Completion or as otherwise required in accordance with Sections 9.9(b)(iii)(C) or 9.9(b)(iv)(C) (each, an “H&S Inspection”), which H&S Inspections shall: (i) be conducted by a Certified H&S Inspector; and (ii) include, at a minimum (A) a review of general compliance with all applicable Occupational Health and Safety Act (Ontario) requirements, compliance with all safety manuals applicable to the Site and (B) a review of the Construction Contractor’s job hazard analysis documentation on any site which could endanger or put at risk the safety of any Person working at the Site. Project Co shall cause the results of each H&S Inspection (such results referred to as the “H&S Inspection Report”) to be delivered to Osler and to the Works Committee not more than 5 Business Days from the date on which the H&S Inspection is completed. Any H&S Inspection Report arising from an H&S Inspection shall be tabled and presented by Project Co for discussion by the Works Committee at the next meeting of the Works Committee that follows the date on which such H&S Inspection Report was issued.

Appears in 1 contract

Samples: Project Agreement

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan; and, which may be incorporated into 1 document; (ii) a Service Quality Plan for each Project Co Service; and (iii) Operational Policies Procedures and Practices; (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Final Commissioning Program and the Canadian Council on Health Service Accreditation (such reference being applicable only to the Service Quality Plans)Program, or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH IO within 60 days following Financial Close. (de) The Operational Policies, Procedures and Practices for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Operational Policies, Procedures and Practices attached as Schedule 37 - Operational Policies, Procedures and Practices Outline. Project Co shall submit its proposed Operational Policies, Procedures and Practices for each Project Co Service to IO not less than 90 days prior to the first Substantial Completion Date. (f) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 - Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH IO not less than 90 days prior to the first Substantial Completion Date. (eg) All Quality Plans shall be subject to review by WGH IO pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fh) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality PlansPlans and the Operational Policies Procedures and Practices. (gi) Where any aspect of the Project Operations is performed by more than one 1 Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan, which may be incorporated into one document; and (ii) a Service Quality Plan for each Project Co Service; , (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Final Commissioning Program and the Canadian Council on Health Service Accreditation Canada (such reference being applicable only to the Service Quality Plans), or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH HHS within 60 days following Financial Close. (de) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 - Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH not less than 90 days prior to the Substantial Completion Date. (ef) All Quality Plans shall be subject to review by WGH HHS pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fg) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (gh) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

Quality Plans and Systems. (a) Project Co shall cause all of the Project Operations to be the subject of quality management systems and to be implemented in accordance with systems, which shall include the following: (i) a Design Quality Plan and a Construction Quality Plan, which may be incorporated into one document; and (ii) a Service Quality Plan for each Project Co Service; , (collectively, the "Quality Plans"). (b) All Quality Plans shall be consistent with the requirements of the Technical RequirementsOutput Specifications, the Final Commissioning Program and the Canadian Council on Health Service Accreditation (such reference being applicable only to the Service Quality Plans)Program, or any equivalent standard which is generally recognized as having replaced it, but Project Co shall not require accreditation with such standard. (c) The Design Quality Plan is attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. (d) The Construction Quality Plan shall, at a minimum, comply with the requirements of the outline of the Construction Quality Plan attached as part of Schedule 11 - Design Quality Plan and Construction Quality Plan. Project Co shall submit each component of its proposed Construction Quality Plan to WGH HMQ within 60 days following Financial Close. (de) The Service Quality Plan for each Project Co Service shall, at a minimum, comply with the requirements of the outline of the Service Quality Plan attached as Schedule 12 - Service Quality Plan Outline. Project Co shall submit its proposed Service Quality Plan for each Project Co Service to WGH HMQ not less than 90 days six (6) months prior to the Scheduled Substantial Completion Date. (ef) All Quality Plans shall be subject to review by WGH HMQ pursuant to Schedule 10 - Review Procedure, and Project Co shall not be entitled to implement or cause the implementation of any Quality Plan unless and until Project Co is entitled to proceed with such implementation pursuant to Schedule 10 - Review Procedure. When a Quality Plan is agreed by the Parties, it shall replace its corresponding outline Quality Plan. When the Service Quality Plan is updated pursuant to the requirements set forth in Section 2.13 of Schedule 15 – Output Specifications, it shall replace the previous Service Quality Plan developed by the Parties. (fg) Project Co shall implement the Quality Plans, shall perform and cause to be performed the Project Operations in compliance with the Quality Plans, including by causing: (i) the Construction Contractor to implement the Design Quality Plan and the Construction Quality Plan; and (ii) the Service Provider to implement the Service Quality Plans. (gh) Where any aspect of the Project Operations is performed by more than one Project Co Party, then this Section 13, in so far as relevant or appropriate to the activities to be performed by such Project Co Party, shall apply in respect of each of them and references in this Section 13 to such Project Co Party, including the Construction Contractor or the Service Provider, shall be construed accordingly.

Appears in 1 contract

Samples: Project Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!