Ramp (Basement Sample Clauses

Ramp (Basement. Level) a. There is only a handrail on one side of the ramp; and the existing handrail lacks extensions, it is 2 inches in diameter, and it is mounted 32 inches above the finished floor. Provide handrails that are between 1¼ inches and 1½ inches in diameter such that the inside handrail is continuous and both handrails have a continuous gripping surface along both sides of the ramp extending at least 12 inches beyond the top and bottom of the ramp parallel with the ground surface; the handrails do not rotate within their fittings; and both handrails are mounted between 34 inches and 38 inches above the ramp surface, with ends rounded or returned smoothly to the floor, wall, or post. Ensure that the ramp and approaches are designed so that water will not accumulate on walking surfaces. Standards §§ 4.3.8, 4.8.
AutoNDA by SimpleDocs

Related to Ramp (Basement

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Use of Basement and Service Areas The basement(s) and service areas, if any, as located within the

  • Porcupine Site Highway 11 and the City of Timmins Thunder Bay and District Toronto/York-Peel

  • Parking A. Landlord shall make available to Tenant, provided Tenant is not in default under this Lease, throughout the Term Seven (7) parking permits (the “Permits”) to allow access to the parking garage located at the Property (the “Building Garage”) which is used in connection with the operation of the Building. Of said Seven (7) Permits granted to Tenant, each shall be standard unreserved. In consideration therefor, Tenant will pay to Landlord as Additional Rent and with each installment of Base Rent due under the Lease, the Parking Charge (hereinafter defined) hereinafter provided. The Permits shall only be valid between the hours of 5:00 a.m. and 11:00 p.m. daily and between the hours of 5:00 a.m. and 11:00 p.m. on Saturdays, Sundays, and Holidays. Except with respect to any limited reserved parking that Landlord may establish and for which Landlord may increase the Parking Charge, all tenant parking in the Building Garage will be on a non-reserved, first-come, first-serve basis. Landlord may elect to establish parking zones in the Building Garage and if Landlord so elects, the Permits may be issued to specifically identified vehicles and the Parking Charge may relate to specified zone(s) as determined by Landlord. If Landlord implements a system whereby only specifically identified vehicles are granted Permits, other vehicles shall not be permitted to use the Building Garage without the Landlord’s prior written consent. Landlord reserves the right upon written notice posted in the Building Garage, to change the parking system for the Building Garage to provide special requirements for weekend, holiday or after hours usage and to temporarily close the Building Garage, or portions thereof to make such repairs or alterations as Landlord may deem appropriate. B. In consideration for the Permits, Tenant covenants and agrees to pay to Landlord during the Term, as Additional Rent thereunder, a parking charge (the “Parking Charge”) equal to the sum of $0.00 per month for each Permit issued to Tenant, and such Parking Charge shall be paid monthly in advance as hereinabove provided. A pro rata portion of such Parking Charge shall be payable for the (i) first partial calendar month of the Lease Term in the event the Commencement Date occurs on a date other than the first day of a calendar month, and (ii) for the last partial calendar month of the Lease Term in the event the term hereof expires on a date other than the last day of a calendar month. Tenant’s obligation to pay the Parking Charge shall be considered an obligation to pay Rent for all purposes thereunder and shall be secured in like manner as is Tenant’s obligation to pay Rent. Default in the payment of such Parking Charge shall be deemed to be a default in the payment of Rent. As additional consideration for the aforesaid Permits, Tenant hereby waives on behalf of itself all claims, whether based on negligence or other grounds, against Landlord, its agents and employees arising out of any loss or damage to automobiles or other property while located in the Building Garage, or arising out of any personal injuries sustained in connection with the use of said Building Garage. Notwithstanding anything in this Section of the Lease to the contrary, so long as Tenant is not in Default under this Lease, Tenant shall be entitled to an abatement of Parking Charges for the Permits in the amount of $0.00 per month for the full Term of the Lease, beginning with the Commencement Date (the “Parking Charge Abatement Period”). The total amount of Parking Charges for the Permits abated during the Parking Charge Abatement Period shall equal $0.00 (the “Abated Parking Charges”). If Tenant Defaults at any time during the Term, and any extension thereof, and Tenant fails to cure such Default within any applicable cure period under the Lease, all Abated Parking Charges shall immediately become due and payable, and all future rights of Tenant to the Abated Parking Charges shall be null and void and of no further force or effect. The payment by Tenant of the Abated Parking Charges in the event of a Default shall not limit or affect any of Landlord’s other rights, pursuant to this Lease or at law or in equity. During the Parking Charge Abatement Period, only Parking Charges for the Permits shall be abated, and all Base Rent, Additional Rent and other costs and charges specified in this Lease shall remain as due and payable pursuant to the provisions of this Lease. C. The failure to timely pay the Parking Charge specified above, or to comply with the rules and regulations governing the use of the Building Garage, including but not limited to the rules establishing time limits on the use of said Permits, shall entitle Landlord, in addition to any other remedies provided hereunder, to terminate the Permits and tow any vehicles which are in violation of said rules and regulations from the Building Garage at the sole cost and expense of Tenant and without liability for damages resulting therefrom.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.

  • Service Areas HHSC authorizes the MA Dual SNP to add the MA Product to Texas service areas that are not identified in Attachment C, Proposed MA Product Service Areas, provided it receives prior CMS approval and complies with the notice requirements specified in this Agreement.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Parking Facilities The parking facilities appurtenant to the Building include asphalt surface parking for visitor parking and a separate parking structure for monthly parking (“Parking Structure”). Tenant shall be entitled to use commencing on the earlier of the Commencement Date or Tenant’s occupancy of the Premises, eight (8) vehicle parking spaces within the Parking Structure for the monthly parking of Tenant’s employees. Two of such parking spaces shall be for parking in the reserved covered portion of the Parking Structure, four (4) of such parking spaces shall be for parking in the unreserved covered portion of the Parking Structure, and the remaining two (2) parking spaces shall be for parking in the unreserved rooftop, uncovered portion of the Parking Structure. Tenant’s use of the Parking Structure shall be based upon a non-exclusive use in common with Landlord, other tenants of the Building, and their guests and invitees. Tenant shall not use more parking spaces than said number, or any spaces (a) which have been specifically assigned by Landlord to other tenants or for such other uses as visitor parking or (b) which have been designated by governmental entities of competent jurisdiction as being restricted to certain uses. Landlord reserves the right to erect such security and access and egress control devices as it may reasonably deem to be appropriate (including, without limitation card controlled gates) and Tenant agrees to cooperate fully with Landlord in such matters. Tenant shall not permit or allow any vehicles that belong to or are controlled by Tenant or Tenant’s employees, suppliers, shippers, customers, or invitees to be loaded, unloaded, or parked in areas other than those designated by Landlord for such activities. If Tenant permits or allows any of such prohibited activities, then Landlord shall have the right, without notice, in addition to such other rights and remedies that it may have, to remove or tow away the vehicle involved and charge the cost to Tenant, which cost shall be immediately payable upon demand by Landlord.

  • Project Site The “Project Site” is the place where the Work is being carried on.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!