Common use of Related Work at Site Clause in Contracts

Related Work at Site. 12.1.1 Owner may perform other work related to the Project at the Site by Owner's employees, or let other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 12.1.1.1 Written notice thereof will be given to Contractor prior to starting any such other work; and 12.1.1.2 If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in this Agreement. 12.1.2 Contractor shall afford each other contractor who is a party to such a direct contract and each utility owner (and Owner, if Owner is performing the other work with Owner's employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of Architect and the others whose work will be affected. The duties and responsibilities of Contractor under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. 12.1.3 If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article, Contractor shall inspect such other work and promptly report to Architect in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects and deficiencies in such other work.

Appears in 14 contracts

Samples: Construction Agreement, Construction Agreement, Design Bid Build Contractor Services

AutoNDA by SimpleDocs

Related Work at Site. 12.1.1 Owner may perform other work related to the Demolition Project at the Site by Owner's employees, or let other direct contracts therefortherefore, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 12.1.1.1 Written notice thereof will be given to Demolition Contractor prior to starting any such other work; and 12.1.1.2 If Owner and Demolition Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor therefore as provided in this Agreement. 12.1.2 Contractor shall afford each other contractor who is a party to such a direct contract and each utility owner (and Owner, if Owner is performing the other work with Owner's employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Demolition Contractor shall do all cutting, fitting, and patching of the Demolition Work that may be required to properly connect connect/disconnect or otherwise make its several parts come together and properly integrate integrate/separate with such other work. Demolition Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of Architect and the others whose work will be affected. The duties and responsibilities of Demolition Contractor under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Demolition Contractor in said direct contracts between Owner and such utility owners and other contractors. 12.1.3 If the proper execution or results of any part of Demolition Contractor's Work depends upon work performed by others under this Article, Demolition Contractor shall inspect such other work and promptly report to Architect in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Demolition Contractor's Work. Demolition Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Demolition Contractor's Work except for latent defects and deficiencies in such other work.

Appears in 3 contracts

Samples: Demolition Contractor Services Agreement, Demolition Contractor Services Agreement, Demolition Contractor Services Agreement

Related Work at Site. 12.1.1 Owner 4.35.1 The City may perform other work related to the Project at the Site by Ownerwith the City's employees, or let other direct contracts therefor, own forces or have other work performed by utility ownersother persons. If such the Contract Documents did not note that other work is not noted in the Contract Documentsto be performed, then: 12.1.1.1 Written written notice thereof will be given to the Contractor prior to starting any such that other work; and 12.1.1.2 If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in this Agreement. 12.1.2 4.35.2 The Contractor shall afford each other contractor who is a party to such a direct contract and each utility owner (and Owner, if Owner is person or the City when performing the other work with Owner's employees) proper and safe access to the Site and a reasonable opportunity for the introduction handling, unloading and storage of materials and equipment and the execution of such other work their work, and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. The Contractor shall not endanger any work of others by cuttingcut, excavating, excavate or otherwise altering their alter any other work and will only cut or alter their work with without the written consent of Architect the other person and the others whose work will be affectedArchitect. The duties and responsibilities of Contractor under this paragraph are for shall afford each other person prompt written notice whenever Work interfacing with the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractorsperson's work has been performed. 12.1.3 4.35.3 If any part of the Work depends for proper execution or results on the work of any part of Contractor's Work depends upon work performed by others under this Articlethe City or another person, the Contractor shall inspect such other work and promptly report to the Architect in writing any delays, defects, or deficiencies conditions in such other that work that which render it unavailable or unsuitable for the proper execution and results of Contractor's Workresults. The Contractor's failure to do so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's the Work except for latent or non-apparent defects and deficiencies in such the other work. 4.35.4 Wherever Work to be performed by the Contractor is dependent upon the work of others; the Contractor shall coordinate his Work with the dependent work to the same extent that he is required to coordinate dependent work. Subcontractor work under paragraph 6.2. Installation of Work by the Contractor or by any Subcontractor in any given area shall constitute acceptance by the Contractor or that Subcontractor of all previously placed dependent work. 4.35.5 If the City contracts with others for other work, the person or organization that will have the authority and responsibility for coordinating the activities of the Contractor and those others will be identified in the Supplementary Conditions. Unless otherwise specifically stated, neither the City nor the Architect shall have any authority or responsibility for coordination of the activities of the Contractor and those others. 4.35.6 Unless otherwise so provided in the Supplementary Conditions, the Contractor shall coordinate the preparation and checking of Submittals with those other persons whose work in any way relates or depends upon the Work, or vice versa, and the Contractor shall so represent it in the Contractor's Submittal to the Architect. Upon receipt of approval of those Submittals from the Architect, or receipt of a Submittal as "Re-submittal Not Required" from the Official, the Contractor shall promptly furnish prints of those Submittals to those other parties.

Appears in 1 contract

Samples: Contract for Public Buildings

Related Work at Site. 12.1.1 A. Owner may perform other work Work related to the Project at the Site by Owner's ’s employees, or let other direct contracts therefor, therefore or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 12.1.1.1 1. Written notice thereof will be given to Contractor Design/Builder prior to starting any such other work; and 12.1.1.2 If Owner 2. Design/Builder may make a Claim therefore as provided in Article 9 if Design/Builder believes that such performance will involve additional expense to Design/Builder or requires additional time and Contractor the parties are unable to agree on entitlement as to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in this Agreementextent thereof. 12.1.2 Contractor B. Design/Builder shall afford each other contractor who is a party to such a direct contract and each utility owner (and Owner, if Owner is performing the other additional work with Owner's ’s employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Contractor Design/Builder shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together properly and properly integrate with such other work. Contractor Design/Builder shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of Architect Owner and the others whose work will be affected. The duties and responsibilities of Contractor Design/Builder under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor Design/Builder in said direct contracts between Owner and such utility owners and other contractors. 12.1.3 C. If the proper execution or results of any part of Contractor's Design/Builder’s Work depends upon work performed or services provided by others under this ArticleArticle 7, Contractor Design/Builder shall inspect such other work and appropriate instruments of service and promptly report to Architect Owner in writing any delays, defects, defects or deficiencies in such other work or services that render it unavailable or unsuitable for the proper execution and results of Contractor's Design/Builder’s Work. Contractor's Design/Builder’s failure so to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Design/Builder’s Work except for latent or non-apparent defects and deficiencies in such other work.

Appears in 1 contract

Samples: Design/Builder Agreement (Nova Oil Inc)

Related Work at Site. 12.1.1 A. Owner may perform work, or cause other work to be performed, related to the Project at the Site by with Owner's ’s employees, or let through other direct contracts therefor, or have through other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 12.1.1.1 1. Written notice thereof will be given to Contractor DB Entity prior to starting any such other work; and 12.1.1.2 2. If Owner and Contractor DB Entity are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times Time(s) that should be allowed as a result of such other work, DB Entity may make a Claim may be made claim therefor as provided in this AgreementArticle 9 if DB Entity believes that such performance will involve additional expense to DB Entity or requires additional time. 12.1.2 Contractor B. DB Entity shall afford each other contractor who is a party to such a direct contract and each utility owner (and Owner, if Owner is performing the other additional work with Owner's ’s employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Contractor DB Entity shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together properly and properly integrate with such other work. Contractor DB Entity shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only such work; provided, however, that DB Entity may cut or alter their others’ work with the written consent of Architect Owner and the others whose work will be affected. The duties and responsibilities of Contractor DB Entity under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor DB Entity in said direct contracts between Owner and such utility owners and other contractors. 12.1.3 C. If the proper execution or results of any part of Contractor's DB Entity’s Work depends upon work performed or services provided by others under this ArticleArticle 7, Contractor DB Entity shall inspect such other work and appropriate instruments of service and promptly report to Architect Owner in writing any delays, defects, defects or deficiencies in such other work or services that render it unavailable or unsuitable for the proper execution and results of Contractor's DB Entity’s Work. Contractor's DB Entity’s failure so to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's DB Entity’s Work except for latent or nonapparent defects and deficiencies in such other work.

Appears in 1 contract

Samples: Design Build Agreement

Related Work at Site. 12.1.1 A. Owner may perform work, or cause other work to be performed, related to the Project at the Site by with Owner's employees, or let through other direct contracts therefor, or have through other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 12.1.1.1 1. Written notice thereof will be given to Contractor DB Entity prior to starting any such other work; and 12.1.1.2 2. If Owner and Contractor DB Entity are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times Time(s) that should be allowed as a result of such other work, DB Entity may make a Claim may be made claim therefor as provided in this AgreementArticle 9 if DB Entity believes that such performance will involve additional expense to DB Entity or requires additional time. 12.1.2 Contractor B. DB Entity shall afford each other contractor who is a party to such a direct contract and each utility owner (and Owner, if Owner is performing the other additional work with Owner's employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Contractor DB Entity shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together properly and properly integrate with such other work. Contractor DB Entity shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only such work; provided, however, that DB Entity may cut or alter their others' work with the written consent of Architect Owner and the others whose work will be affected. The duties and responsibilities of Contractor DB Entity under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor DB Entity in said direct contracts between Owner and such utility owners and other contractors. 12.1.3 C. If the proper execution or results of any part of ContractorDB Entity's Work depends upon work performed or services provided by others under this ArticleArticle 7, Contractor DB Entity shall inspect such other work and appropriate instruments of service and promptly report to Architect Owner in writing any delays, defects, defects or deficiencies in such other work or services that render it unavailable or unsuitable for the proper execution and results of ContractorDB Entity's Work. ContractorDB Entity's failure so to so report will constitute an acceptance of such other work as fit and proper for integration with ContractorDB Entity's Work except for latent or nonapparent defects and deficiencies in such other work.

Appears in 1 contract

Samples: Design Build Agreement

AutoNDA by SimpleDocs

Related Work at Site. 12.1.1 A. Owner may perform other work related to the Project at the Site by with Owner's ’s employees, or let through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 12.1.1.1 Written 1. written notice thereof will be given to Contractor prior to starting any such other work; and 12.1.1.2 If 2. if Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in this AgreementParagraph 10.05. 12.1.2 B. Contractor shall afford each other contractor who is a party to such a direct contract and contract, each utility owner (owner, and Owner, if Owner is performing the other work with Owner's ’s employees) , proper and safe access to the Site and Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work work, and shall properly coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only such work; provided, however, that Contractor may cut or alter their others' work with the written consent of Architect Engineer and the others whose work will be affected. The duties and responsibilities of Contractor under this paragraph Paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. 12.1.3 C. If the proper execution or results of any part of Contractor's ’s Work depends upon work performed by others under this ArticleArticle 7, Contractor shall inspect such other work and promptly report to Architect Engineer in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's ’s Work. Contractor's ’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's ’s Work except for latent defects and deficiencies in such other work.

Appears in 1 contract

Samples: Basic Form Agreement

Related Work at Site. 12.1.1 SAMPLE A. Owner may perform other work related to the Project at the Site by with Owner's ’s employees, or let through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 12.1.1.1 Written 1. written notice thereof will be given to Contractor Construction Manager prior to starting any such other work; and 12.1.1.2 If 2. if Owner and Contractor Construction Manager are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in this AgreementParagraph 10.05. 12.1.2 Contractor B. Construction Manager shall afford each other contractor who is a party to such a direct contract and contract, each utility owner (owner, and Owner, if Owner is performing the other work with Owner's ’s employees) , proper and safe access to the Site and Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work work, and shall properly coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Contractor Construction Manager shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor Construction Manager shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only such work; provided, however, that Construction Manager may cut or alter their others' work with the written consent of Architect and the others whose work will be affected. The duties and responsibilities of Contractor Construction Manager under this paragraph Paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor Construction Manager in said direct contracts between Owner and such utility owners and other contractors. 12.1.3 C. If the proper execution or results of any part of Contractor's Construction Manager’s Work depends upon work performed by others under this ArticleArticle 7, Contractor Construction Manager shall inspect such other work and promptly report to Architect in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Construction Manager’s Work. Contractor's Construction Manager’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Construction Manager’s Work except for latent defects and deficiencies in such other work.

Appears in 1 contract

Samples: Construction Manager at Risk Agreement

Related Work at Site. 12.1.1 A. Owner may perform other work Work related to the Project at the Site by Owner's employees, or let other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 12.1.1.1 1. Written notice thereof will be given to Contractor prior to starting any such other work; and 12.1.1.2 If Owner 2. Contractor may make a Claim therefor as provided in Article 9 if Contractor believes that such performance will involve additional expense to Contractor or requires additional time and Contractor the parties are unable to agree on entitlement as to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in this Agreementextent thereof. 12.1.2 B. Contractor shall afford each other contractor who is a party to such a direct contract and each utility owner (and Owner, if Owner is performing the other additional work with Owner's employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together properly and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of Architect Owner and the others whose work will be affected. The duties and responsibilities of Contractor under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. 12.1.3 C. If the proper execution or results of any part of Contractor's Work depends upon work performed or services provided by others under this ArticleArticle 7, Contractor shall inspect such other work and appropriate instruments of service and promptly report to Architect Owner in writing any delays, defects, defects or deficiencies in such other work or services that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure so to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent or non-apparent defects and deficiencies in such other work.

Appears in 1 contract

Samples: Comprehensive Agreement