Common use of REMEDIES FOR FAILURE TO ACHIEVE KPIs Clause in Contracts

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract with any Contracting Body until such time as, in Authority’s absolute sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement.

Appears in 14 contracts

Samples: Framework Agreement, Framework Agreement, Framework Agreement

AutoNDA by SimpleDocs

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 4.6 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time as, in Authority’s absolute sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6Approved by the Authority. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 : fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 and/or fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 and/or fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 or does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasiontwo (2) occasions, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing to terminate this Framework Agreement. This Schedule 2 contains: details of the Sub-Contractors to be engaged or employed by the Supplier in the provision of Goods and Services pursuant to individual Call-Off Agreement; and the procedure to select, appoint and manage Sub-Contractors.

Appears in 7 contracts

Samples: Framework Agreement, Framework Agreement, Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract with any Contracting Body until such time as, in Authority’s absolute sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement.

Appears in 5 contracts

Samples: Framework Agreement, Framework Agreement, Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 4.6 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time asas the Authority is satisfied, in Authority’s its absolute and sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6Approved by the Authority. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 : fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 and/or fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 and/or fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 and/or does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in have committed a Material Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement. This Schedule 2 contains: details of the Sub-Contractors to be engaged or employed by the Supplier in the provision of Services pursuant to individual Call-Off Agreements; and the procedure to select, appoint and manage Sub-Contractors.

Appears in 5 contracts

Samples: Framework Agreement, Framework Agreement, Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract with any Contracting Body until such time as, in Authority’s absolute sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 4.6.1 fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 4.6.2 fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.24.2 above; and/or 4.7.3 4.6.3 fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 4.6.4 does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement.,

Appears in 4 contracts

Samples: Framework Agreement, Framework Agreement for the Supply of Locum Doctors, Framework Agreement for the Supply of Locum Doctors

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. 4.1 Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below4.6 of this Framework Schedule 1. 4.2. 4.2 The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. 4.3 The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time at the request of the Authority one (1) or more meetings at the request of with the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. 4.4 The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. 4.5 The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition further competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time as, in the Authority’s absolute sole discretion, the Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above (of this Framework Schedule 1) and ApprovedApproved by the Authority. 4.6. 4.6 In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 4.6.1 fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 4.6.2 fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.24.2 above; and/or 4.7.3 4.6.3 fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 4.6.4 does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasiontwo (2) occasions, then (without prejudice to any other rights and remedies of termination provided for in the this Framework Agreement), the Supplier’s Supplier shall be deemed to be in Material Default and the Authority shall be entitled to by notice in writing terminate this Framework AgreementAgreement pursuant to Clause 24.7.

Appears in 2 contracts

Samples: Framework Agreement, Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. 4.1 Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below4.6. 4.2. 4.2 The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement planAuthority. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. 4.3 The Authority shall on written notice be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time at the request of the Authority one (1) or more meetings at the request of with the Authority in order to resolve the issues raised by and which form the Authority in its notice to subject matter of the Supplier requesting such meetings. 4.4improvement plan. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement and by the date as set out in the improvement notice. 4.5. 4.4 The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition further competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time as, in the Authority’s absolute sole discretion, the Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved4.3 Approved by the Authority. 4.6. 4.5 In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 4.3 to 4.5 above 4.4 and the Supplier either: 4.7.1 4.5.1 fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 4.5.2 fails to implement an improvement plan Approved approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 4.5.3 fails to comply with any reasonable request made in writing by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 4.5.4 does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasiontwo (2) occasions, then (without prejudice to any other rights and remedies of termination provided for in the this Framework Agreement), the Supplier’s Supplier shall be deemed to be in Material Default and the Authority shall be entitled to by notice in writing terminate this Framework AgreementAgreement pursuant to Clause 24.8.

Appears in 2 contracts

Samples: Insurance Services Framework Agreement, Insurance Services Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. 4.1 Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below4.6. 4.2. 4.2 The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve Approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. 4.3 The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time at the request of the Authority one (1) or more meetings at the request of with the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. 4.4 The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. 4.5 The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition further competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time as, in Authority’s the Authority‟s absolute sole discretion, the Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and ApprovedApproved by the Authority. 4.6. 4.6 In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 4.5 to 4.5 above 4. 6.4 and the Supplier either: 4.7.1 4.6.1 fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 4.6.2 fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 and/or 4.6.3 fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 4.6.4 does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasiontwo (2) occasions, then (without prejudice to any other rights and remedies of termination provided for in the this Framework Agreement), the Supplier’s Supplier shall be deemed to be in Material Default and the Authority shall be entitled to by notice in writing terminate this Framework AgreementAgreement pursuant to Clause 25.8.

Appears in 2 contracts

Samples: Framework Agreement, Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. 4.1 Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below4.6. 4.2. 4.2 The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve Approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. 4.3 The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time at the request of the Authority one (1) or more meetings at the request of with the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. 4.4 The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. 4.5 The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition further competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time as, in the Authority’s absolute sole discretion, the Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and ApprovedApproved by the Authority. 4.6. 4.6 In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 4.6.1 fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 4.6.2 fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 and/or 4.6.3 fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement.

Appears in 2 contracts

Samples: Legal Services Framework Agreement, Legal Services Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.24.6 of this Framework Schedule 1. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time at the request of the Authority one (1) or more meetings at the request of with the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition further competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time as, in the Authority’s absolute sole discretion, the Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above (of this Framework Schedule 1) and Approved. 4.6Approved by the Authority. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 : fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 and/or fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.24.2 above; and/or 4.7.3 and/or fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 or does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasiontwo (2) occasions, then (without prejudice to any other rights and remedies of termination provided for in the this Framework Agreement), the Supplier’s Supplier shall be deemed to be in Material Default and the Authority shall be entitled to by notice in writing terminate this Framework AgreementAgreement pursuant to Clause 24.7.

Appears in 1 contract

Samples: Framework Agreement

AutoNDA by SimpleDocs

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time as, in Authority’s absolute sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6Approved by the Authority. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 : fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 and/or fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 and/or fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 or does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement. This Schedule 2 contains: details of the Sub-Contractors to be engaged or employed by the Supplier in the provision of Goods and Services pursuant to individual Call-Off Agreement; and the procedure to select, appoint and manage Sub-Contractors.

Appears in 1 contract

Samples: Supply and Fit of Tyres Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time asas the Authority is satisfied, in Authority’s its absolute and sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6Approved by the Authority. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 : fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 and/or fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 and/or fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 and/or does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in have committed a Material Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement. This Schedule 2 contains: details of the Sub-Contractors to be engaged or employed by the Supplier in the provision of Services pursuant to individual Call-Off Agreements; and the procedure to select, appoint and manage Sub-Contractors.

Appears in 1 contract

Samples: Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract with any Contracting Body until such time as, in Authority’s absolute sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 : fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 and/or fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 and/or fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 or does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement. FRAMEWORK AGREEMENT SCHEDULE 2: SUB-CONTRACTORS This Schedule 2 contains: details of the Sub-Contractors to be engaged or employed by the Supplier in the provision of Services pursuant to individual Call-Off Contracts; and the procedure to select, appoint and manage Sub-Contractors.

Appears in 1 contract

Samples: Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.2. The Authority and/or Contracting Body shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the AuthorityAuthority and/or Contracting Body, an improvement plan within fourteen (14) Working Days of a written request by the Authority and/or Contracting Body for such improvement plan. The Authority and/or Contracting Body shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract Agreement with any Contracting Body until such time as, in Authority’s absolute sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and ApprovedApproved by the Authority. 4.6. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or and/or 4.7.3 fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement.

Appears in 1 contract

Samples: Framework Agreement

REMEDIES FOR FAILURE TO ACHIEVE KPIs. 4.1. Without prejudice to any other rights or remedies arising under this Framework Agreement if the Supplier fails to achieve any of the KPI Targets in accordance with paragraph 3 above on any one or more occasions, the Supplier acknowledges and agrees that the Authority shall have the right to exercise (in its absolute sole discretion) all or any of the following remedial actions set out in paragraphs 4.2 to 4.7 below. 4.2. The Authority shall be entitled to require the Supplier, and the Supplier agrees to prepare and provide to the Authority, an improvement plan within fourteen (14) Working Days of a written request by the Authority for such improvement plan. The Authority shall be entitled to approve such improvement plan and require that the Supplier implement such improvement plan as soon as reasonably practicable. 4.3. The Authority shall be entitled to require the Supplier, and the Supplier agrees to attend, within a reasonable time one (1) or more meetings at the request of the Authority in order to resolve the issues raised by the Authority in its notice to the Supplier requesting such meetings. 4.4. The Authority shall be entitled to serve an improvement notice on the Supplier and the Supplier shall implement such requirements for improvement as set out in the improvement notice. 4.5. The Authority shall be entitled to suspend the Supplier from bidding in any Further Competition and/or entering into any Call-Off Contract with any Contracting Body until such time as, in Authority’s absolute sole discretion, Authority is satisfied that the Supplier has implemented such requirements for improvement as set out in the improvement notice and/or implemented an improvement plan submitted pursuant to paragraph 4.2 above and Approved. 4.6. In the event that the Authority has, in its absolute sole discretion, invoked one or more of the remedies set out in paragraphs 4.2 to 4.5 above and the Supplier either: 4.7.1 : fails to implement such requirements for improvement as set out in the improvement notice; and/or 4.7.2 and/or fails to implement an improvement plan Approved by the Authority pursuant to paragraph 4.2; and/or 4.7.3 and/or fails to comply with any reasonable request made by the Authority within such reasonable timescales as have been specified by the Authority; or 4.7.4 or does comply with such requests made by the Authority within such reasonable timescales as have been specified by the Authority but the Supplier fails to achieve any of the KPI Targets on any one occasion, then (without prejudice to any other rights and remedies of termination provided for in the Framework Agreement), the Supplier’s shall be deemed to be in Default and the Authority shall be entitled to by notice in writing terminate this Framework Agreement.,

Appears in 1 contract

Samples: Framework Agreement