Common use of Removing Material Clause in Contracts

Removing Material. Replace the fourth and fifth paragraphs with the following: Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 12 inches of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete. Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation. Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom. 203.05 Disposing of Material. Add the following:

Appears in 3 contracts

Samples: Service Timber Sale Contract, Service Timber Sale Contract, Service Timber Sale Contract

AutoNDA by SimpleDocs

Removing Material. Replace the fourth and fifth paragraphs with the following: Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 12 inches of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete. Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation. Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom. 203.05_nat_us_02_18_2005 203.05 Disposing of Material. Add the following:

Appears in 1 contract

Samples: www.fs.usda.gov

AutoNDA by SimpleDocs

Removing Material. Replace UReplace the fourth and fifth paragraphs with the following: Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 12 inches of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete. Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation. Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom. 203.05 Disposing of Material. Add 204 - Excavation and Embankment 204.00_nat_us_03_26_2009 Replace Section 204 in its entirety with the following:: Description

Appears in 1 contract

Samples: Contract Road Maintenance Requirements Summary

Time is Money Join Law Insider Premium to draft better contracts faster.