Requested Interconnection Service. MW of requested ERIS at the POI (maximum summer or winter net MW, whichever is greater): (NOTE: A Developer may request ERIS below the Generating Facility Capability for Large Generating Facilities and the full facility capacity for Class Year Transmission Projects subject to the requirements and limitations set forth in Section 30.3.2.3 of Attachment X to the ISO OATT). • If requesting ERIS for a multi-unit facility, specify the requested ERIS for each Generator: • Maximum summer net (net MW = xxxxx XX minus auxiliary loads total MW) which can be achieved at 90 degrees F: Maximum winter net (net MW = xxxxx XX minus auxiliary loads total MW) which can be achieved at 10 degrees F : • MW of requested increase in ERIS of an existing facility, as calculated from the baseline ERIS (as defined in Section 30.3.1 of Attachment X – for temperature- sensitive machines, provide the summer and winter MW vs. temperature curves for both xxxxx XX and net MW corresponding to the requested net MW values provided above): MW of requested CRIS: • If requesting CRIS for a multi-unit facility, specify the requested XXXX for each Generator:
Appears in 4 contracts
Samples: Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Requested Interconnection Service. MW of requested ERIS at the POI (maximum summer or winter net MW, whichever is greater): ERIS: (NOTE: A Developer may request ERIS below the Generating Facility Capability for Large Generating Facilities and the full facility capacity for Class Year Transmission Projects subject to the requirements and limitations set forth in Section 30.3.2.3 of Attachment X to the ISO OATT). • If requesting ERIS for a multi-unit facility, specify the allocation of requested ERIS for each Generator: among such units • Maximum summer net (net MW = xxxxx XX minus auxiliary loads total MW) which can be achieved at 90 degrees F: Maximum winter net (net MW = xxxxx XX minus auxiliary loads total MW) which can be achieved at 10 degrees F : • MW of requested increase in ERIS of an existing facility, as calculated from the baseline ERIS (as defined in Section 30.3.1 of Attachment X – for temperature- temperature-sensitive machines, provide the summer and winter MW vs. temperature curves for both xxxxx XX and net MW corresponding to the requested net MW values provided above): MW of requested CRISXXXX: • If requesting CRIS XXXX for a multi-unit facility, specify the allocation of requested XXXX for each Generatoramong such units:
Appears in 2 contracts
Samples: Year Study Agreement, Year Study Agreement
Requested Interconnection Service. MW of requested ERIS at the POI (maximum summer or winter net MW, whichever is greater): ERIS: (NOTE: A Developer may request ERIS below the Generating Facility Capability for Large Generating Facilities and the full facility capacity for Class Year Transmission Projects subject to the requirements and limitations set forth in Section 30.3.2.3 of Attachment X to the ISO OATT). • If requesting ERIS for a multi-unit facility, specify the allocation of requested ERIS for each Generator: among such units • Maximum summer net (net MW = xxxxx XX minus auxiliary loads total MW) which can be achieved at 90 degrees F: Maximum winter net (net MW = xxxxx XX minus auxiliary loads total MW) which can be achieved at 10 degrees F : • MW of requested increase in ERIS of an existing facility, as calculated from the baseline ERIS (as defined in Section 30.3.1 of Attachment X – for temperature- temperature-sensitive machines, provide the summer and winter MW vs. temperature curves for both xxxxx XX and net MW corresponding to the requested net MW values provided above): MW of requested CRIS: • If requesting CRIS for a multi-unit facility, specify the allocation of requested XXXX for each Generatoramong such units:
Appears in 2 contracts
Samples: Year Study Agreement, Large Generator Interconnection Agreement
Requested Interconnection Service. MW of requested ERIS at the POI (maximum summer or winter net MW, whichever is greater): ERIS: (NOTE: A Developer may request ERIS below the Generating Facility Capability for Large Generating Facilities and the full facility capacity for Class Year Transmission Projects subject to the requirements and limitations set forth in Section 30.3.2.3 of Attachment X to the ISO OATT). • If requesting ERIS for a multi-unit facility, specify the allocation of requested ERIS for each Generator: • among such units Maximum summer net (net MW = xxxxx XX minus auxiliary loads total MW) which can be achieved at 90 degrees F: Maximum winter net (net MW = xxxxx XX minus auxiliary loads total MW) which can be achieved at 10 degrees F : • MW of requested increase in ERIS of an existing facility, as calculated from the baseline ERIS (as defined in Section 30.3.1 of Attachment X – for temperature- temperature-sensitive machines, provide the summer and winter MW vs. temperature curves for both xxxxx XX and net MW corresponding to the requested net MW values provided above): MW of requested CRISXXXX: • If requesting CRIS XXXX for a multi-unit facility, specify the allocation of requested XXXX for each Generatoramong such units:
Appears in 1 contract
Samples: Year Study Agreement