Required Infrastructure Improvements. Subject to all the terms and conditions of this Agreement, Master Developer agrees to construct all infrastructure necessary to support the Project as described in Exhibit E. Master Developer further agrees to install, at Master Developer’s expense, off-site infrastructure necessary to provide services to the Project, including without limitation: (a) Sanitary sewer conveyance upgrades that are necessary based on the increased flows resulting from the anticipated land use changes resulting in a residential unit count that would generate sewage volumes 200% to 300% greater than attributed to the site in the sewer model. (b) Improvements to public streets, sidewalks, curbs, and gutters that are necessary based on the increased traffic resulting from the anticipated land use changes in the Project. This includes but is not limited to off-site improvements to Highland Ranch Parkway and to the intersection of Highland Ranch Parkway and Pyramid Highway as follows: (i) The widening to four travel lanes of Highland Ranch Parkway from Pyramid Highway to the entrance to the Project. Master Developer shall complete this improvement prior to issuance of any certificate of occupancy for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project, or upon degradation below Level of Service (LOS) D of the segment of Highland Ranch Parkway between Pyramid Highway and the entrance to the Project, or upon degradation below LOS E of the intersection of Pyramid Highway and Highland Ranch Parkway, whichever first occurs. (ii) Prior to or concurrently with submitting an application for a tentative map and/or for multi-family residential units exceeding, in aggregate, 650 dwelling units, the Master Developer shall submit an encroachment permit application to the Nevada Department of Transportation to complete all improvements to the intersection of Highland Ranch Parkway and Pyramid Highway recommended in the The Quarry Traffic Study dated September 25, 2017, with an addendum dated March 12, 2018, and prepared by Solaegui Engineers, incorporated by reference herein as part of the Infrastructure Plan attached hereto as Exhibit E. All improvements from the entrance to the Project to the intersection of Highland Ranch Parkway and Pyramid Highway shall be completed prior to issuance of any certificate of occupany for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project. (iii) Implementation of dark skies standards shall be permitted subject to the approval of the City. (c) Flood control and drainage improvements that are necessary based on the anticipated land use changes in the Project. (i) If the Property is included in Impact Fee Service Area Number 1, the City will consider for inclusion in the Impact Fee Service Area Number 1 Capital Improvements Plan any flood control and drainage improvements that have regional impacts as illustrated by a hydrology study to be completed at Master Developer’s expense. The Parties agree that nothing contained in this Agreement constitutes in any way a pre-approval or authorization of the Property’s participation in Impact Fee Service Area Number 1 or a pre- approval or authorization for inclusion of any flood control or drainage improvements in the Impact Fee Service Area Number 1 Capital Improvements Plan. (ii) Master Developer shall provide, at Master Developer’s expense, a hydrology and hydraulic analysis that shall address, without limitation, offsite capacity and sediment transport improvements to the Highland Ranch Parkway and Pyramid Highway culvert crossings. Improvements identified in the analysis shall be completed to the approval of the City Engineer prior to issuance of any building permits for structures. (iii) Master Developer shall design and construct all flood control and drainage improvements, whether onsite or offsite, required to comply with the Truckee Xxxxxxx Regional Drainage Manual and the approval of the Administrator. Design rainfall depths shall utilize the 24-hour point precipitation frequency estimates from the National Oceanic and Atmospheric Administration Atlas 14 (NOAA Atlas 14). (d) Public safety conditions and improvements that are necessary based on the anticipated land use changes in the Project, including, without limitation: (i) Construction of a secondary fire apparatus access road shall be completed prior to the first final inspection or the issuance of the first certificate of occupancy for the Project. The secondary fire apparatus access road shall be privately owned and maintained, gated, and a minimum of twenty (20) feet wide. Emergency pull-out areas shall be constructed upon this secondary fire apparatus access road to the approval of the Fire Chief and the City Engineer. (ii) Construction of all streets and the secondary fire apparatus access road shall comply with design requirements set forth in the City of Sparks Site Development Fire Prevention Policy Guide and shall be to the approval of the Fire Chief and the City Engineer. The street providing primary access to the Project shall be a two-lane roadway from Highland Ranch Parkway to the first entrances of Villages 3 and 4. A meandering, trail-style sidewalk at least five (5) feet in width shall be constructed of Portland cement concrete (if dedicated to the City of Sparks) on at least one side of the primary access street. Asphalt may be used in lieu of Portland cement concrete on trail-style sidewalks that are to be owned and maintained by a homeowners association or landscape maintenance association. If the primary access street is divided by a median, emergency median crossovers (if applicable) shall be constructed to the approval of the Fire Chief at least every 750 feet. Fire hydrants shall be installed upon the primary access street at distances to be approved by the Fire Chief. Any cul-de-sac constructed within the Project shall have a diameter of at least one hundred (100) feet. (iii) All dwelling units and commercial structures intended or used for human occupancy shall be equipped with fire suppression systems to the approval of the Fire Chief. This requirement may be eliminated if the Master Developer demonstrates, to the approval of the Fire Chief, that the dwelling units and/or commercial structures are located within a four-minute travel time from a City of Sparks Fire Department station. (iv) Emergency access points shall be provided to all common areas. These emergency access points shall be a minimum of sixteen (16) feet wide, shall be gated, and shall be posted with signs indicating that parking is prohibited to the approval of the Fire Chief. Design and location of the emergency access points shall be addressed with the appropriate tentative map submittals. Master Developer shall comply with all requirements of the International Wildland-Urban Interface Code in effect at the time of the particular development activity. (e) Master Developer shall grant to the City easements or other permissions acceptable to the Administrator for access, operation, and maintenance of any City-owned utility facilities located on private property. Such easements or other permissions shall be approved by the Administrator prior to or concurrently with approval of any final map. (f) The Parties acknowledge and agree that nothing contained in this Agreement constitutes in any way a pre-approval or acceptance of dedication of any streets, gutters, curbs, or sidewalks on the Property. All infrastructure, whether onsite or offsite, shall be constructed in substantial conformance with: (i) Applicable construction standards; (ii) Design standards required for dedication to the City, if applicable; and (iii) Approval of the Administrator.
Appears in 1 contract
Samples: Development Agreement
Required Infrastructure Improvements. Subject to all the terms and conditions of this Agreement, Master Developer agrees to construct all infrastructure necessary to support the Project as described in Exhibit E. Master Developer further agrees to install, at Master Developer’s expense, off-site infrastructure necessary to provide services to the Project, including without limitation:
(a) Sanitary sewer conveyance upgrades that are necessary based on the increased flows resulting from the anticipated land use changes resulting in a residential unit count that would generate sewage volumes 200% to 300% greater than attributed to the site in the sewer model.; and
(b) Improvements to public streets, sidewalks, curbs, and gutters that are necessary based on the increased traffic resulting from the anticipated land use changes in the Project. This includes but is not limited to off-site improvements to Highland Ranch Parkway and to the intersection of Highland Ranch Parkway and Pyramid Highway as follows:
(i) The Prior to issuance of any building permits for structures, the widening to four travel lanes of Highland Ranch Parkway from Pyramid Highway to the entrance to the Project. Master Developer shall complete this improvement prior to issuance of any certificate of occupancy for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project, or upon degradation below Level of Service (LOS) D of the segment of Highland Ranch Parkway between Pyramid Highway and the entrance to the Project, or upon degradation below LOS E of the intersection of Pyramid Highway and Highland Ranch Parkway, whichever first occurs.
(ii) Prior to or concurrently with submitting an application for a tentative map and/or for multi-family residential units exceeding, in aggregate, 650 dwelling units, the Master Developer shall submit an encroachment permit application to the Nevada Department of Transportation to complete all improvements to the intersection of Highland Ranch Parkway and Pyramid Highway recommended in the The Quarry Traffic Study dated September (25), 2017, with an addendum dated March 12, 2018, and prepared by Solaegui Engineers, incorporated by reference herein as part of the Infrastructure Plan attached hereto as Exhibit E. All improvements from the entrance to the Project to the intersection of Highland Ranch Parkway and Pyramid Highway shall be completed prior to issuance of any certificate of occupany for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project.
(iii) Implementation of dark skies standards shall be permitted subject to the approval of the City.
(c) Flood control and drainage improvements that are necessary based on the anticipated land use changes in the Project.
(i) If the Property is included in Impact Fee Service Area Number 1, the City will consider for inclusion in the Impact Fee Service Area Number 1 Capital Improvements Plan any flood control and drainage improvements that have regional impacts as illustrated by a hydrology study to be completed at Master Developer’s expense. The Parties agree that nothing contained in this Agreement constitutes in any way a pre-approval or authorization of the Property’s participation in Impact Fee Service Area Number 1 or a pre- approval or authorization for inclusion of any flood control or drainage improvements in the Impact Fee Service Area Number 1 Capital Improvements Plan.
(ii) Master Developer shall provide, at Master Developer’s expense, a hydrology and hydraulic analysis that shall address, without limitation, offsite capacity and sediment transport improvements to the Highland Ranch Parkway and Pyramid Highway culvert crossings. Improvements identified in the analysis shall be completed to the approval of the City Engineer prior to issuance of any building permits for structures.
(iii) Master Developer shall design and construct all flood control and drainage improvements, whether onsite or offsiteoff-site, required to comply with the Truckee Xxxxxxx Regional Drainage Manual and the approval of the Administrator. Design rainfall depths shall utilize the 24-hour point precipitation frequency estimates from the National Oceanic and Atmospheric Administration Atlas 14 (NOAA Atlas 14).
(d) Public safety conditions and improvements that are necessary based on the anticipated land use changes in the Project, including, without limitation:
(i) Construction of a second fire apparatus access road. The primary median- divided access road to the Project shall serve as dual access for the development of Villages 1 and 2 and shall be extended to the first entrances of Villages 3 and 4. A private, gated secondary fire apparatus access road shall be required with the development of the remainder of the project. Construction of the secondary fire apparatus access road shall be completed prior to the first final inspection or the issuance of the first a certificate of occupancy for and/or final inspection of any dwelling unit in excess of 200 dwelling units in the Project. The secondary fire apparatus access road shall be privately owned and maintained, gated, and a minimum of twenty (20) feet wide. Emergency wide and emergency pull-out areas shall be constructed upon this secondary fire apparatus access road to the approval of the Fire Chief and the City Engineer.The Parties acknowledge and agree that nothing contained in this Agreement constitutes in any way a pre-approval or acceptance of dedication of any streets, gutters, curbs, or sidewalks on the Property.
(ii) Construction of all streets and the secondary fire apparatus access road shall comply with design requirements set forth in the City of Sparks Site Development Fire Prevention Policy Guide and shall be to the approval of the Fire Chief and the City EngineerChief. The street providing primary access to the Project shall be a twofour lane, median-lane divided roadway from Highland Ranch Parkway to the first entrances of Villages 3 and 4. A meandering, trail4.Emergency median cross-style sidewalk at least five (5) feet in width shall be constructed of Portland cement concrete (if dedicated to the City of Sparks) on at least one side of the primary access street. Asphalt may be used in lieu of Portland cement concrete on trail-style sidewalks that are to be owned and maintained by a homeowners association or landscape maintenance association. If the primary access street is divided by a median, emergency median crossovers (if applicable) overs shall be constructed to the approval of the Fire Chief at least every 750 feetfeet or more frequently. Fire hydrants shall be installed upon the primary access street at distances to be approved by the Fire Chief. Any cul-de-sac constructed within the Project shall have a radius of at least fifty (feet) and a diameter of at least one hundred (100) feet.
(iii) All dwelling units and commercial structures intended or used for human occupancy shall be equipped with fire suppression systems to the approval of the Fire Chief. This requirement may be eliminated if the Master Developer demonstrates, to the approval of the Fire Chief, that the dwelling units and/or commercial structures are located within a four-minute travel time from a City of Sparks Fire Department station.
(iv) Emergency access points shall be provided to all common areas. These emergency access points shall be a minimum of sixteen (16) feet wide, shall be gated, and shall be posted with signs indicating that parking is prohibited to the approval of the Fire Chief. Design and location of the emergency access points shall be addressed with the appropriate tentative map submittals. Master Developer shall comply with all requirements of the International Wildland-Urban Interface Code in effect at the time of the particular development activity.
(e) Master Developer shall grant to the City easements or other permissions acceptable to the Administrator for access, operation, and maintenance of any City-owned utility facilities located on private property. Such easements or other permissions shall be approved by the Administrator prior to or concurrently with approval of any final map.
(f) The Parties acknowledge and agree that nothing contained in this Agreement constitutes in any way a pre-approval or acceptance of dedication of any streets, gutters, curbs, or sidewalks on the Property. All infrastructure, whether onsite or offsiteoff-site, shall be constructed in substantial conformance with:
(ia) Applicable construction standards;
(iib) Design standards required for dedication to the CityCity of Sparks, if applicable; and
(iiic) Approval of the Administrator.
Appears in 1 contract
Samples: Development Agreement
Required Infrastructure Improvements. Subject to all the terms and conditions of this Agreement, Master Developer agrees to construct all infrastructure necessary to support the Project as described in Exhibit E. Master Developer further agrees to install, at Master Developer’s expense, off-site infrastructure necessary to provide services to the Project, including without limitation:
(a) Sanitary sewer conveyance upgrades that are necessary based on the increased flows resulting from the anticipated land use changes resulting in a residential unit count that would generate sewage volumes 200% to 300% greater than attributed to the site in the sewer model.; and
(b) Improvements to public streets, sidewalks, curbs, and gutters that are necessary based on the increased traffic resulting from the anticipated land use changes in the Project. This includes but is not limited to off-site improvements to Highland Ranch Parkway and to the intersection of Highland Ranch Parkway and Pyramid Highway as follows:
(i) The Prior to issuance of any building permits for structures, the widening to four travel lanes of Highland Ranch Parkway from Pyramid Highway to the entrance to the Project. Master Developer shall complete this improvement prior to issuance of any certificate of occupancy for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project, or upon degradation below Level of Service (LOS) D of the segment of Highland Ranch Parkway between Pyramid Highway and the entrance to the Project, or upon degradation below LOS E of the intersection of Pyramid Highway and Highland Ranch Parkway, whichever first occurs.
(ii) Prior to or concurrently with submitting an application for a tentative map and/or for multi-family residential units exceeding, in aggregate, 650 dwelling units, the Master Developer shall submit an encroachment permit application to the Nevada Department of Transportation to complete all improvements to the intersection of Highland Ranch Parkway and Pyramid Highway recommended in the The Quarry Traffic Study dated September (25), 2017, with an addendum dated March 12, 2018, and prepared by Solaegui Engineers, incorporated by reference herein as part of the Infrastructure Plan attached hereto as Exhibit E. All improvements from the entrance to the Project to the intersection of Highland Ranch Parkway and Pyramid Highway shall be completed prior to issuance of any certificate of occupany for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project.
(iii) Implementation of dark skies standards shall be permitted subject to the approval of the City.
(c) Flood control and drainage improvements that are necessary based on the anticipated land use changes in the Project.
(i) If the Property is included in Impact Fee Service Area Number 1, the City will consider for inclusion in the Impact Fee Service Area Number 1 Capital Improvements Plan any flood control and drainage improvements that have regional impacts as illustrated by a hydrology study to be completed at Master Developer’s expense. The Parties agree that nothing contained in this Agreement constitutes in any way a pre-approval or authorization of the Property’s participation in Impact Fee Service Area Number 1 or a pre- approval or authorization for inclusion of any flood control or drainage improvements in the Impact Fee Service Area Number 1 Capital Improvements Plan.
(ii) Master Developer shall provide, at Master Developer’s expense, a hydrology and hydraulic analysis that shall address, without limitation, offsite capacity and sediment transport improvements to the Highland Ranch Parkway and Pyramid Highway culvert crossings. Improvements identified in the analysis shall be completed to the approval of the City Engineer prior to issuance of any building permits for structures.
(iii) Master Developer shall design and construct all flood control and drainage improvements, whether onsite or offsiteoff-site, required to comply with the Truckee Xxxxxxx Regional Drainage Manual and the approval of the Administrator. Design rainfall depths shall utilize the 24-hour point precipitation frequency estimates from the National Oceanic and Atmospheric Administration Atlas 14 (NOAA Atlas 14).
(d) Public safety conditions and improvements that are necessary based on the anticipated land use changes in the Project, including, without limitation:
(i) Construction of a secondary second fire apparatus access road. The second fire apparatus access road shall be completed prior to the first issuance of a certificate of occupany for and/or final inspection or the issuance of the first certificate any dwelling unit in excess of occupancy for 650 dwelling units in the Project. The secondary second fire apparatus access road shall be privately owned and maintained, gated, and a minimum of twenty (20) feet wide. Emergency pull-out areas shall be constructed upon this secondary fire apparatus access road to the approval of the City Engineer and the Fire Chief and shall be open for public use. The Parties acknowledge and agree that the Fiscal Analysis attached hereto as Exhibit D presumes that the second fire apparatus access road and gutters, curbs, and sidewalks constructed adjacent thereto will be privately owned and maintained. The City will not accept any dedication of the second fire apparatus access road or gutters, curbs, and sidewalks adjacent thereto without a new fiscal analysis that considers the fiscal impacts to the City Engineerof such possible dedication. The Parties acknowledge and agree that nothing contained in this Agreement constitutes in any way a pre-approval or acceptance of dedication of any streets, gutters, curbs, or sidewalks on the Property.
(ii) Construction of all streets and the secondary fire apparatus access road shall comply with design requirements set forth in the City of Sparks Site Development Fire Prevention Policy Guide and shall be to the approval of the Fire Chief and Chief. Each travel lane on the City Engineer. The street providing primary access to the Project shall be a two-lane roadway from Highland Ranch Parkway to the first entrances of Villages 3 and 4. A meandering, trail-style sidewalk at least five twenty (520) feet in width shall width, to be constructed of Portland cement concrete (if dedicated to the City of Sparks) on divided by a median at least one side of the ten (10) feet in width. Upon this primary access street. Asphalt may be used in lieu of Portland cement concrete on trail-style sidewalks that are to be owned and maintained by a homeowners association or landscape maintenance association. If the primary access street is divided by a median, emergency median crossovers (if applicable) pull-out areas shall be constructed to the approval of the Fire Chief at least every 750 feetfeet or more frequently, and emergency median cross-overs shall be constructed to the approval of the Fire Chief every 750 feet or more frequently. Fire hydrants shall be installed upon the primary access street at distances to be approved by the Fire Chief. Any cul-cul- de-sac constructed within the Project shall have a radius of at least fifty (feet) and a diameter of at least one hundred (100) feet.
(iii) All dwelling units and commercial structures intended or used for human occupancy shall be equipped with fire suppression systems to the approval of the Fire Chief. This requirement may be eliminated if the Master Developer demonstrates, to the approval of the Fire Chief, that the dwelling units and/or commercial structures are located within a four-minute travel time from a City of Sparks Fire Department station.
(iv) Emergency access points shall be provided to all common areas. These emergency access points shall be a minimum of sixteen (16) feet wide, shall be gated, and shall be posted with signs indicating that parking is prohibited to the approval of the Fire Chief. Design and location of the emergency access points shall be addressed with the appropriate tentative map submittals. Master Developer shall comply with all requirements of the International Wildland-Urban Interface Code in effect at the time of the particular development activity.
(e) Master Developer shall grant to the City easements or other permissions acceptable to the Administrator for access, operation, and maintenance of any City-owned utility facilities located on private property. Such easements or other permissions shall be approved by the Administrator prior to or concurrently with approval of any final map.
(f) The Parties acknowledge and agree that nothing contained in this Agreement constitutes in any way a pre-approval or acceptance of dedication of any streets, gutters, curbs, or sidewalks on the Property. All infrastructure, whether onsite or offsiteoff-site, shall be constructed in substantial conformance with:
(ia) Applicable construction standards;
(iib) Design standards required for dedication to the CityCity of Sparks, if applicable; and
(iiic) Approval of the Administrator.
Appears in 1 contract
Samples: Development Agreement
Required Infrastructure Improvements. Subject to all the terms and conditions of this Agreement, Master Developer agrees to construct all infrastructure necessary to support the Project as described in Exhibit E. Master Developer further agrees to install, at Master Developer’s expense, off-site infrastructure necessary to provide services to the Project, including without limitation:
(a) Sanitary sewer conveyance upgrades that are necessary based on the increased flows resulting from the anticipated land use changes resulting in a residential unit count that would generate sewage volumes 200% to 300% greater than attributed to the site in the sewer model; and.
(b) Improvements to public streets, sidewalks, curbs, and gutters that are necessary based on the increased traffic resulting from the anticipated land use changes in the Project. This includes but is not limited to off-site improvements to Highland Ranch Parkway and to the intersection of Highland Ranch Parkway and Pyramid Highway as follows:
(i) Prior to issuance of any building permits for structures, the(i) The widening to four travel lanes of Highland Ranch Parkway from Pyramid Highway to the entrance to the Project. Master Developer shall complete this improvement prior to issuance of any certificate of occupancy for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project, or upon degradation below Level of Service (LOS) D of the segment of Highland Ranch Parkway between Pyramid Highway and the entrance to the Project, or upon degradation below LOS E of the intersection of Pyramid Highway and Highland Ranch Parkway, whichever first occurs.
(ii) Prior to or concurrently with submitting an application for a tentative map and/or for multi-family residential units exceeding, in aggregate, 650 dwelling units, the Master Developer shall submit an encroachment permit application to the Nevada Department of Transportation to complete all improvements to the intersection of Highland Ranch Parkway and Pyramid Highway recommended in the The Quarry Traffic Study dated September (25),, 2017, with an addendum dated March 12, 2018, and prepared by Solaegui Engineers, incorporated by reference herein as part of the Infrastructure Plan attached hereto as Exhibit E. All improvements from the entrance to the Project to the intersection of Highland Ranch Parkway and Pyramid Highway shall be completed prior to issuance of any certificate of occupany for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project.
(iii) Implementation of dark skies standards shall be permitted subject to the approval of the City.
(c) Flood control and drainage improvements that are necessary based on the anticipated land use changes in the Project.
(i) If the Property is included in Impact Fee Service Area Number 1, the City will consider for inclusion in the Impact Fee Service Area Number 1 Capital Improvements Plan any flood control and drainage improvements that have regional impacts as illustrated by a hydrology study to be completed at Master Developer’s expense. The Parties agree that nothing contained in this Agreement constitutes in any way a pre-approval or authorization of the Property’s participation in Impact Fee Service Area Number 1 or a pre- approval or authorization for inclusion of any flood control or drainage improvements in the Impact Fee Service Area Number 1 Capital Improvements Plan.
(ii) Master Developer shall provide, at Master Developer’s expense, a hydrology and hydraulic analysis that shall address, without limitation, offsite capacity and sediment transport improvements to the Highland Ranch Parkway and Pyramid Highway culvert crossings. Improvements identified in the analysis shall be completed to the approval of the City Engineer prior to issuance of any building permits for structures.
(iii) Master Developer shall design and construct all flood control and drainage improvements, whether onsite or offsiteoff-siteoffsite, required to comply with the Truckee Xxxxxxx Regional Drainage Manual and the approval of the Administrator. Design rainfall depths shall utilize the 24-hour point precipitation frequency estimates from the National Oceanic and Atmospheric Administration Atlas 14 (NOAA Atlas 14).
(d) Public safety conditions and improvements that are necessary based on the anticipated land use changes in the Project, including, without limitation:
(i) Construction of a second fire apparatus access road. The primary median- divided access road to the Project shall serve as dual access for the development of Villages 1 and 2 and shall be extended to the first entrances of Villages 3 and 4. A private, gated secondary fire apparatus access road shall be required with the development of the remainder of the project. Construction of the secondary fire apparatus access road shall be completed prior to the first final inspection or the issuance of the athe first certificate of occupancy for and/or final inspection of any dwelling unit in excess of 200 dwelling units in the Project. The secondary fire apparatus access road shall be privately owned and maintained, gated, and a minimum of twenty (20) feet widewide and emergency. Emergency pull-out areas shall be constructed upon this secondary fire apparatus access road to the approval of the Fire Chief and the City Engineer.The Parties acknowledge and agree that nothing contained in this Agreement constitutes in any way a pre-approval or acceptance of dedication of any streets, gutters, curbs, or sidewalks on the Property.
(ii) Construction of all streets and the secondary fire apparatus access road shall comply with design requirements set forth in the City of Sparks Site Development Fire Prevention Policy Guide and shall be to the approval of the Fire Chief Chief. and the City Engineer. The street providing primary access to the Project shall be a four two-lane lane, median-divided roadway from Highland Ranch Parkway to the first entrances of Villages 3 and 4. A EmergencyA meandering, trail-style sidewalk at least five (5) feet in width shall be constructed of Portland cement concrete (if dedicated to the City of Sparks) on at least one side of the primary access street. Asphalt may be used in lieu of Portland cement concrete on trail-style sidewalks that are to be owned and maintained by a homeowners association or landscape maintenance association. If the primary access street is divided by a median, emergency median crossovers cross-overscrossovers (if applicable) shall be constructed to the approval of the Fire Chief at least every 750 feetfeet or more frequently. Fire hydrants shall be installed upon the primary access street at distances to be approved by the Fire Chief. Any cul-de-sac constructed within the Project shall have a radius of at least fifty (feet) and a diameter of at least one hundred (100) feet.
(iii) All dwelling units and commercial structures intended or used for human occupancy shall be equipped with fire suppression systems to the approval of the Fire Chief. This requirement may be eliminated if the Master Developer demonstrates, to the approval of the Fire Chief, that the dwelling units and/or commercial structures are located within a four-minute travel time from a City of Sparks Fire Department station.
(iv) Emergency access points shall be provided to all common areas. These emergency access points shall be a minimum of sixteen (16) feet wide, shall be gated, and shall be posted with signs indicating that parking is prohibited to the approval of the Fire Chief. Design and location of the emergency access points shall be addressed with the appropriate tentative map submittals. Master Developer shall comply with all requirements of the International Wildland-Urban Interface Code in effect at the time of the particular development activity.
(e) Master Developer shall grant to the City easements or other permissions acceptable to the Administrator for access, operation, and maintenance of any City-owned utility facilities located on private property. Such easements or other permissions shall be approved by the Administrator prior to or concurrently with approval of any final map.
(f) The Parties acknowledge and agree that nothing contained in this Agreement constitutes in any way a pre-approval or acceptance of dedication of any streets, gutters, curbs, or sidewalks on the Property. All infrastructure, whether onsite or offsiteoff-siteoffsite, shall be constructed in substantial conformance with:
(i) Applicable construction standards;
(ii) Design standards required for dedication to the CityCity of Sparks, if applicable; and
(iii) Approval of the Administrator.
Appears in 1 contract
Samples: Development Agreement