Residual Contaminants of Potential Concern Sample Clauses

Residual Contaminants of Potential Concern. Data collected within the PTM XXX indicate that, following completion of the active cleanup measures, contaminants of potential concern (COPC) that will remain in soil at concentrations exceeding MTCA unrestricted cleanup levels include (Figure 1): • An estimated 4,600 cubic yards (CY) of TPH-contaminated soil will remain in the Bunker C subarea; • An estimated 100 CY of dioxin-contaminated soil will remain in the Dioxin- Contaminated Debris subarea; and • An estimated 3,700 CY of soil with acidic pH and metals contamination will remain in the Acid Plant subarea. In addition, soils in areas scattered throughout the 31-acre PTM XXX contain COPC concentrations exceeding soil cleanup levels for unrestricted land use. These soils occur from the existing ground surface down to an estimated average depth of 12 feet. This equates to an XXX-wide impacted soil volume of approximately 600,000 CY. Contaminants are assumed to be present beneath the XXX-wide cap in subsurface materials anywhere outside of soil excavation areas (Bunker C subarea) within the PTM XXX.
AutoNDA by SimpleDocs

Related to Residual Contaminants of Potential Concern

  • Materials of Environmental Concern have not been transported or disposed of from the Properties in violation of, or in a manner or to a location which could give rise to liability under, any Environmental Law, nor have any Materials of Environmental Concern been generated, treated, stored or disposed of at, on or under any of the Properties in violation of, or in a manner that could give rise to liability under, any applicable Environmental Law, except insofar as any such violation or liability referred to in this paragraph, or any aggregation thereof, could not reasonably be expected to result in the payment of a Material Environmental Amount.

  • Materials of Environmental Concern have not been transported or disposed of from the Properties in violation of, or in a manner or to a location that could give rise to liability under, any Environmental Law, nor have any Materials of Environmental Concern been generated, treated, stored or disposed of at, on or under any of the Properties in violation of, or in a manner that could give rise to liability under, any applicable Environmental Law;

  • ENVIRONMENTAL CONCERNS 38.7.8.1 In the worse case scenario, many environmental concerns must be addressed. Along with the police and fire marshal, the state environmental protection department will be on site to monitor the situation. 38.7.8.2 Items to be concerned with in a large central office building could include: 38.7.8.2.1 Emergency engine fuel supply. Damage to the standby equipment and the fuel handling equipment could have created “spill” conditions that have to be handled within state and federal regulations. 38.7.8.2.2 Asbestos-containing materials that may be spread throughout the wreckage. Asbestos could be in many components of building, electrical, mechanical, outside plant distribution, and telephone systems.

  • Environmental Considerations A. Company, its officers, agents, servants, employees, invitees, independent contractors, successors, and assigns will not discharge or spill any Hazardous Substance, as defined herein, into any component of the storm drainage system or onto any paved or unpaved area within the boundaries of the Premises. In addition, Company will not discharge or spill any Hazardous Substance into any component of the sanitary sewer system without first neutralizing or treating same as required by applicable anti-pollution laws or ordinances, in a manner satisfactory to Authority and other public bodies, federal, state, or local, having jurisdiction over or responsibility for the prevention of pollution of canals, streams, rivers, and other bodies of water. Company’s discharge, spill or introduction of any Hazardous Substance onto the Premises or into any component of Authority’s sanitary or storm drainage systems will, if not remedied by Company with all due dispatch, at the sole discretion of Authority, be deemed a default and cause for termination of this Agreement by Authority, subject to notice and cure. Such termination will not relieve Company of or from liability for such discharge or spill. B. If Company is deemed to be a generator of hazardous waste, as defined by federal, state, or local law, Company will obtain a generator identification number from the U. S. Environmental Protection Agency (EPA) and the appropriate generator permit and will comply with all federal, state, and local laws, and any rules and regulations promulgated thereunder, including but not limited to, ensuring that the transportation, storage, handling, and disposal of such hazardous wastes are conducted in full compliance with applicable law. C. Company agrees to provide Authority, within 10 days after Authority’s request, copies of all hazardous waste permit application documentation, permits, monitoring reports, transportation, responses, storage and disposal plans, material safety data sheets and waste disposal manifests prepared or issued in connection with Company’s use of the Premises. D. At the end of the Agreement, Company will dispose of all solid and hazardous wastes and containers in compliance with all applicable regulations. Copies of all waste manifests will be provided to Authority at least 30 days prior to the end of the Agreement.

  • Contamination The presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.

  • Hazardous Material Contractor shall not permit any Hazardous Material (as defined below) to be located, used, incorporated into the Work or brought onto the Job Site in connection with the Work unless (i) absolutely necessary because no alternative is available, (ii) the precise nature and quantity of the Hazardous Material is specified in writing to Owner, (iii) the prior written approval of Owner is obtained, and (iv) Contractor complies with all Laws and prudent business practices concerning the Hazardous Material required. If Contractor encounters any material it reasonably believes to be Hazardous Material, or becomes aware of any incident involving Hazardous Material at the Job Site, Contractor shall immediately stop the Work in the area so affected and shall immediately report the same to Owner. Contractor shall also immediately notify Owner of any notice Contractor receives concerning the presence or use of Hazardous Material at the Job Site. Contractor shall be liable for all on and off-site disposal or transport of Hazardous Material (and shall sign any manifest for the transport or storage of such Hazardous Material), and for any discharge, release, injury to any person, or injury or damage to any property resulting from use of Hazardous Material in the performance of the Work. Contractor shall, at its expense, cause the removal of the Hazardous Material and remedy any associated problems in accordance with applicable Laws and prudent business practices. "Hazardous Material" shall mean (1) any Hazardous Material as defined under the Comprehensive Environmental Response, Compensation and Liability Act of 1980, the Resource Conservation and Recovery Act, or under any applicable state or local Laws, (2) any substance or matter that results in liability to any person or entity from discharge of or exposure to such substance or matter under any statutory or common law theory, (3) pesticides, asbestos, formaldehyde, polychlorinated biphenyl, solvents, petroleum and motor fuel hydrocarbon material, and (4) any other substance or matter that becomes subject to any federal, state or local agency order or requirement for removal, treatment or remedial action. To the extent permitted by Law, and without in any way limiting any other indemnity obligation under this Agreement, Contractor shall indemnify, defend (at Contractor's sole cost and with legal counsel acceptable to Owner) and hold Owner and their respective officers, directors, agents, employees, representatives, shareholders, partners, affiliates, successors and assigns harmless, from and against any and all claims, losses, costs or liabilities arising out of an incurred connection with removing or remediating any Hazardous Materials on or about the Job Site or transported on, to, from or about the Job Site by Contractor. This indemnity shall be effective during and after completion of the Work.

  • Hazardous Substance The term “Hazardous Substance” shall mean any hazardous or toxic substances, materials or wastes, or pollutants or contaminants as defined, listed or regulated by any Environmental Law or by common law decision including, without limitation, chlorinated solvents; petroleum products or by products; asbestos; and polychlorinated biphenyl.

  • No Hazardous Materials (A) have been disposed of or otherwise released from any Real Property of the Company or any of its Subsidiaries in violation of any Environmental Laws; or (B) are present on, over, beneath, in or upon any Real Property or any portion thereof in quantities that would constitute a violation of any Environmental Laws. No prior use by the Company or any of its Subsidiaries of any Real Property has occurred that violates any Environmental Laws, which violation would have a material adverse effect on the business of the Company or any of its Subsidiaries.

  • Responsibility for Environmental Contamination 5.20.1 Neither Party shall be liable to the other for any costs whatsoever resulting from the presence or release of any Environmental Hazard that either Party did not introduce to the affected Work Location. Both Parties shall defend and hold harmless the other, its officers, directors and employees from and against any losses, damages, claims, demands, suits, liabilities, fines, penalties and expenses (including reasonable attorneys' fees) that arise out of or result from (i) any Environmental Hazard that the Indemnifying Party, its contractors or agents introduce to the Work Locations or (ii) the presence or release of any Environmental Hazard for which the Indemnifying Party is responsible under Applicable Law. 5.20.2 In the event any suspect materials within Qwest-owned, operated or leased facilities are identified to be asbestos containing, CLEC will ensure that to the extent any activities which it undertakes in the facility disturb such suspect materials, such CLEC activities will be in accordance with applicable local, state and federal environmental and health and safety statutes and regulations. Except for abatement activities undertaken by CLEC or equipment placement activities that result in the generation of asbestos-containing material, CLEC does not have any responsibility for managing, nor is it the owner of, nor does it have any liability for, or in connection with, any asbestos-containing material. Qwest agrees to immediately notify CLEC if Qwest undertakes any asbestos control or asbestos abatement activities that potentially could affect CLEC personnel, equipment or operations, including, but not limited to, contamination of equipment.

  • Hazardous Materials; Remediation (a) If any release or disposal of Hazardous Materials shall occur or shall have occurred on any real property or any other assets of any Borrower or any other Credit Party, such Borrower will cause, or direct the applicable Credit Party to cause, the prompt containment and removal of such Hazardous Materials and the remediation of such real property or other assets as is necessary to comply with all Laws and to preserve the value of such real property or other assets. Without limiting the generality of the foregoing, each Borrower shall, and shall cause each other Credit Party to, comply with each Law requiring the performance at any real property by any Borrower or any other Credit Party of activities in response to the release or threatened release of a Hazardous Material. (b) Borrower will provide Agent within thirty (30) days after written demand therefor with a bond, letter of credit or similar financial assurance evidencing to the reasonable satisfaction of Agent that sufficient funds are available to pay the cost of removing, treating and disposing of any Hazardous Materials or Hazardous Materials Contamination and discharging any assessment which may be established on any property as a result thereof, such demand to be made, if at all, upon Agent’s determination that the failure to remove, treat or dispose of any Hazardous Materials or Hazardous Materials Contamination, or the failure to discharge any such assessment could reasonably be expected to have a Material Adverse Change. (c) If there is any conflict between this Section 6.10 and any environmental indemnity agreement which is a Financing Document, the environmental indemnity agreement shall govern and control.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!