Home inspection means the on-site, physical review of the home of an applicant to assure the applicant and the home meets all health and safety requirements within these rules.
Initial Environmental Examination or “IEE” means an initial environmental examination for a Subproject, including any update thereto, prepared and submitted by the Borrower pursuant to the requirements set forth in the EARF and cleared by ADB;
Phase II means the second part of the tuition incentive assistance program which provides assistance in the third and fourth year of 4-year degree programs.
Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.
Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.
Due Diligence Examination shall have the meaning set forth in Section 3.2.
Phase I means the first part of the tuition incentive assistance program defined as the academic period of 80 semester or 120 term credits, or less, leading to an associate degree or certificate.
Tube housing assembly means the tube housing with tube installed. It includes high-voltage and/or filament transformers and other appropriate elements when such are contained within the tube housing.
Environmental Site Assessment means a Phase I environmental report meeting the requirements of the American Society for Testing and Materials, and, if in accordance with customary industry standards a reasonable lender would require it, a Phase II environmental report, each prepared by a licensed third party professional experienced in environmental matters.
Residual Waste means low-level radioactive waste resulting from processing or decontamination activities that cannot be easily separated into distinct batches attributable to specific waste generators. This waste is attributable to the processor or decontamination facility, as applicable.
Site Assessment means a Site Assessment as defined in Paragraph 10(c).
Final Inspection means the process and procedure described in UGC Section 12.
Project site, where applicable, means the place indicated in bidding documents.
Phase I Report means, with respect to any Facility, a report that (i) conforms to the ASTM Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, E 1527, (ii) was conducted no more than six months prior to the date such report is required to be delivered hereunder, by one or more environmental consulting firms reasonably satisfactory to Administrative Agent, (iii) includes an assessment of asbestos-containing materials at such Facility, (iv) is accompanied by (a) an estimate of the reasonable worst-case cost of investigating and remediating any Hazardous Materials Activity identified in the Phase I Report as giving rise to an actual or potential material violation of any Environmental Law or as presenting a material risk of giving rise to a material Environmental Claim, and (b) a current compliance audit setting forth an assessment of Holdings’, its Subsidiaries’ and such Facility’s current and past compliance with Environmental Laws and an estimate of the cost of rectifying any non-compliance with current Environmental Laws identified therein and the cost of compliance with reasonably anticipated future Environmental Laws identified therein.
Inspections has the meaning set forth in Section 4.1.2.
Phase I Environmental Report means a report by an Independent Person who regularly conducts environmental site assessments in accordance with then current standards imposed by institutional commercial mortgage lenders and who has a reasonable amount of experience conducting such assessments.
Phase I assessment as described in, and meeting the criteria of, (i) Chapter 5 of the FNMA Multifamily Guide or any successor provisions covering the same subject matter in the case of a Specially Serviced Mortgage Loan as to which the related Mortgaged Property is multifamily property or (ii) the American Society for Testing and Materials in the case of Specially Serviced Mortgage Loan as to which the related Mortgaged Property is not multifamily property.
Site Visit means a visit to the Site; and
Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:
Certificate of inspection means an unsworn statement,
Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;
Residual Information means the ideas, know-how, methods, and techniques that would be retained in the unaided memory of an ordinary person skilled in the art, not intent on appropriating the Confidential Information of the Disclosing Party, as a result of such person's access to, use, review, evaluation, or testing of the Confidential Information of the Disclosing Party. A person's memory is "unaided" if such person has not intentionally memorized the Confidential Information for the purpose of retaining and subsequently using or disclosing it.
Initial inspection means the first on-site inspection of facilities to verify declarations submitted pursuant to Articles III, IV, V and VI and this Annex.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.